Kerala Local Self Government Department Diesel Generator Tender Pathanamthitta 900 KVA CPWD Gen Spec 2026
N/a
PATHANAMTHITTA, KERALA
Bid Publish Date
20-Jun-2026, 8:54 am
Bid End Date
09-Jul-2026, 1:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Indian Army invites bids for a Diesel Power Generator up to 900 KVA under the Department of Military Affairs. The scope covers supply, installation, testing, commissioning, and operator training, with statutory clearances as applicable. The project references CPWD General Specifications for Electrical Works – Part VII (DG Set) and requires integration with a complete installation package, including on-site services where specified. The tender emphasizes full scope within one contract, with installation across the specified regime and compliance with documented standards. A key differentiator is the inclusion of installation scope validation and post-award service commitments tied to warranty performance.
CPWD General Specifications for Electrical Works – Part VII (DG Set) compliance
Nominal Rated Capacity (kVA) and Number of Phase as per project
Rated Engine Power (kWm), Governor type, Engine Speed (RPM)
Fuel type and engine salient features
IS conformity for Alternator and Voltage Regulation Grade
Control Panel type and Battery specification
Trailer availability if required
Installation scope Parts 1-4 and compliance acknowledgement
Warranty in running hours and number of PM visits per year
Test lab type and test conformity documentation
EMD/security deposit as per government norms with submission in bid
Delivery timeframe linked to original order with 25% quantity variation
Service center presence in consignee state within 30 days of award
3-day defect rectification window with 0.5% weekly penalty
PBG forfeiture rights if penalties exceed 10% of contract value
Scope includes supply, installation, testing, commissioning, and training; payment terms governed by contract with possible milestones as per delivery and acceptance.
Delivery period may adjust with option quantity; minimum 30 days additional time; original delivery period governs extension.
0.5% penalty per week for delays; cumulative cap 10% of total contract value; post-penalty remedies include service by alternate sources at contractor risk.
Functional service center in the state of the consignee location or ability to establish within 30 days
Experience in supply, installation, testing, and commissioning of DG sets up to 900 KVA
Certification compliance with CPWD DG Set specifications and IS standards
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Diesel Power Generator (up to 900 KVA) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
PATHANAMTHITTA, KERALA
Central Board Of Direct Taxes (cbdt)
BALLIA, UTTAR PRADESH
Central Board Of Direct Taxes (cbdt)
FATEHPUR, UTTAR PRADESH
N/a
UDHAM SINGH NAGAR, UTTARAKHAND
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
GORAKHPUR, UTTAR PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Installation Configuration | Power Generator Installation Configurations as per CPWD General Specifications for Electrical Works – Part VII (DG Set) | Fixed (Power Generators are permanently installed)" |
| Ratings | Nominal Rated Capacity (in kVA) | 25, 30 |
| Ratings | Number of Phase | Three Phase |
| Engine | Rated Engine Power (kWm) | 100 % of the required powered at STP(Standard Temperature Pressure) i.e equal to (Nominal Rated Capacity (KVA) of power generator + Any Auxilary power Consumption by the Power generator) x Power factor(0.8) / Alternator efficience, 110 % of the required powered at STP(Standard Temperature Pressure) i.e equal to (Nominal Rated Capacity (KVA) of power generator Any Auxilary power Consumption by the Power generator) x Power factor(0.8) / Alternator efficience Or higher |
| Engine | Type of Governor | Electronic Or higher |
| Engine | Rated Engine Speed (in RPM) | 1500, 3000 |
| Engine | Type of Fuel | High Speed Diesel (HSD) |
| Engine | Salient Features of Engine [Hint: Products matching all selected values will be displayed; For example, if both 'Turbo Charged Engine' and 'Direct injection Fuel System' are selected, product that include both options will be shown] | Turbo Charged Engine, Naturally aspirated engine, Direct injection Fuel System, CRDi Fuel System, No derating applicable upto 4500 above MSL of altitude at 25 degree celcius, Indirect injection (IDI) Fuel System |
| Alternator | Conformity to Indian Standard For Alternator | Generally conforming to IS:13364 (Part-2) latest (Above 20 KVA) |
| Alternator | Voltage Regulation Grade | VG 1, VG 2, VG 3 Or higher |
| Control Panel | Type of Control Panel | Manual Control Panel, AMF Control Panel |
| Battery | Battery Type | "Low Maintenance free to IS: 14257 for high cranking performance" |
| Trailer | Availability of Trailer | NA for Fixed/Skid Mounted Power Generator |
| Installation Requirement | Scope of installation for diesel generating set when offered by the vendor - inclusive in the scope of supply (Part-1) | a) Installation of Power Generator when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Power Generator and its constituent parts shall be generally conforming to CPWD General Specification for Electrical Works, Part - VII - latest. b) Foundation shall be constructed by the seller. Foundation shall be of PCC type with the ratio of 4:2:1. The length and breadth of the foundation shall be 300 mm more from the respective length and breadth of the Power Generator. The height of the foundation shall be 400 mm, i.e., 200 mm below and 200 mm above the ground level. All the materials / labour required for foundation work shall be supplied by the seller. |
| Installation Requirement | Scope of installation for diesel generating set when offered by the vendor - inclusive in the scope of supply (Part-2) | c) Supply, laying and termination of interconnecting power and control cable shall be done by the seller. The cable supplied shall be ISI marked heavy duty PVC insulated, armoured cable, with PVC outer Sheath of Type ST-2 (FR Grade, Category C1), with aluminium conductor having insulation of PVC compound type -C, suitable for rated voltage upto and including 1100 volts and conforming to IS: 1554 (Part-1) latest. For 3-Phase Power Generators, 3.5 core or higher core cables shall be used. Total length of the cable supplied by the seller shall be within 30 meters for each Power Generator with manual control panel and within 60 metres for each Power Generator with AMF control panel. The current rating of the cables shall be as indicated below: 2C, 6 Sq mm for Single Phase, 3.5 & 5.0 KVA 2C, 10 Sq mm for Single Phase, 7.5 & 10 KVA 2C, 25 Sq mm for Single Phase, 15 KVA 2C, 35 Sq mm for Single Phase, 20 KVA 2C, 70Sq mm for Single Phase, 25 KVA 2C, 95Sq mm for Single Phase, 30 KVA 2C, 120Sq mm for Single Phase, 40 KVA 4C, 4 Sq mm for Three Phase, |
| Installation Requirement | Scope of installation for diesel generating set when offered by the vendor - inclusive in the scope of supply (Part-3) | d) 10 KVA 4C, 6 Sq mm for Three Phase, 15 KVA 4C, 10 Sq mm for Three Phase, 20 & 25 KVA 4C, 16 Sq mm for Three Phase, 30 KVA 3.5C, 25 Sq mm for Three Phase, 40 KVA 3.5C, 35 Sq mm for Three Phase, 50 KVA 3.5C, 70 Sq mm for Three Phase, 62.5 & 75 KVA 3.5C, 95 Sq mm for Three Phase, 82.5 KVA 3.5C, 120 Sq mm for Three Phase, 100 KVA 3.5C, 185 Sq mm for Three Phase, 125 KVA 3.5C, 300 Sq mm for Three Phase, 160 KVA 3.5C, 2 Run of 120 Sq mm for Three Phase, 180 KVA 3.5C, 2 Run of 150 Sq mm for Three Phase, 200 KVA 3.5C, 2 Run of 185 Sq mm for Three Phase, 225 KVA 3.5C, 2 Run of 240 Sq mm for Three Phase, 250 & 275 KVA 3.5C, 3 Run of 185 Sq mm for Three Phase, 320 KVA 3.5C, 3 Run of 240 Sq mm for Three Phase, 380 & 400 KVA 3.5C, 4 Run of 240 Sq mm for Three Phase, 500, 600 & 750 KVA 3.5C, 6 Run of 240 Sq mm for Three Phase, 900 KVA |
| Installation Requirement | Scope of installation for diesel generating set when offered by the vendor - inclusive in the scope of supply (Part-4) | e) Construction of suitable earthing station and necessary connections shall be done by the seller. All the materials / labour required for construction of earthing station shall be supplied by the seller. The total number of earthing pits/stations shall be 4, i.e., 2 for neutral and 2 for body-earthing. Netutral earthing shall be done with copper Plate and Body earthing shall be done with G.I. plate / Copper. The consignee should choose installation site in such a way that the earthing stations can be made within 10 metres of the Power Generator. Earthing station shall be typically constructed as per prevalent standard practices and shall be generally conforming to CPWD General specification for Electrical Works, Part - VII & Part - I - latest. e) Installation of Fuel Tank including foundation / stand shall be done by the seller. f)The warranty is applicable upto specified value of month/hours whichever occurs first's. |
| Installation Requirement | Above Scope of Installation for the Diesel Generating Set, when offered by the vendor, has been seen, read, understood, and agreed to Comply | Yes |
| Warranty/Services | Warranty (in Running Hours) | 5000.0 - 5000.0 Or higher |
| Warranty/Services | Number of Preventive Maintenance Visits Offered in an Year During Warranty Period (Supply of all consumables is the buyer's responsibilty) | 2, 1 |
| Test Reports | Type of lab which carried out test of complete product to prove the conformity of product specification | Certificates required as per CPCB, Govt Lab, NABL accredited lab, NA |
| Test Reports | Test Report Available For (Test/approval) | Type Approval Certificate for the specified rating of the Power Generator from any of the designated agency authorized by CPCB, COP Certificate for engine, Type test report and Endurance test report for Engine as per IS: 10001 latest / IS: 10002 latest, Type test report for Alternator as per IS:13364 (Part-1) latest / IS:13364 (Part-2) latest to prove conformity to the specifications |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar DG set projects
Financial statements demonstrating financial capacity
EMD/Security deposit as applicable
Technical bid documents clearly showing compliance with CPWD DG Set specs
OEM authorization and service center details
Laboratory test reports or conformity certificates for generator and alternator
Extended Deadline
09-Jul-2026, 1:00 pm
Opening Date
09-Jul-2026, 1:30 pm
Key insights about KERALA tender market
Bidders must meet eligibility criteria including CPWD DG Set compliance, IS conformity for alternator, and service center availability in the consignee state. Prepare GST, PAN, experience certificates, financials, EMD, OEM authorizations, and technical bid documents demonstrating 900 KVA DG set compliance and installation capability.
Submit GST certificate, PAN, experience certificates for similar DG sets, financial statements, EMD, technical bid with CPWD DG Set compliance, OEM authorization, and service center details. Ensure laboratory test conformity certificates and installation capability statements are included.
Installation must follow CPWD DG Set Part VII, including on-site wiring, control panel integration, battery alignment, and trailer if applicable. Testing requires lab-conducted conformity reports and final commissioning with operator training and statutory clearances as needed.
The option clause allows ±25% quantity variation; delivery time extends using (increased quantity/original quantity) × original delivery period, with a minimum of 30 days; extensions may not exceed the original delivery period.
Defects must be rectified within 3 days of notification; penalties are 0.5% of unit price per week of delay, capped at 10% of total contract value; penalties may be recovered from PBG or paid directly with potential alternate sourcing rights.
The DG set must comply with CPWD DG Set specifications, IS conformity for the alternator, IS 550 or equivalent ratings where specified, and provide test conformity reports from a recognized lab to prove standard compliance.
Bidders must provide a dedicated toll-free service line and an escalation matrix; a functional service center should be established in the consignee state within 30 days of award; payment hinges on evidence of the service center's operation.
Bid price must cover supply, installation, testing, commissioning, operator training, and statutory clearances; ensure consumables are buyer-borne, with appropriate warranties and PM visits outlined in the contract.
Rural Development Department Ghazipur
📍 GHAZIPUR, UTTAR PRADESH
N/a
📍 SOUTH ANDAMAN, ANDAMAN & NICOBAR
N/a
📍 SOUTH ANDAMAN, ANDAMAN & NICOBAR
Odisha Police
📍 CUTTACK, ODISHA
Odisha Police
📍 CUTTACK, ODISHA
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS