Sanitary Napkins Incinetator Machine with Smoke Control Unit,Sanitary Napkins Vending Machines
Panchayati Raj Department
DARBHANGA, BIHAR
Progress
Quantity
2
Category
Sanitary Napkins Incinetator Machine with Smoke Control Unit
Bid Type
Two Packet Bid
Purnia District Panchayats in Bihar invites bids for procurements in the Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3) and Sanitary Napkins Vending Machines (Q3). The scope includes a standalone stand-equipped main unit with comprehensive smoke control and automatic temperature/time control features, plus multiple coin acceptance and built-in charging. The project emphasizes SCU with carbon and odour filtration, and a configurable burning capacity per day and per cycle. Delivery terms mirror the option clause for quantity variation up to 25%, with extended delivery time calculations. This procurement targets local deployment in the PURNIA district to enhance waste management and sanitary product access.
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3) specifications
Sanitary Napkins Vending Machines (Q3) specifications
Smoke Control Unit with carbon and odour filtration chambers
Automatic digital controllers for time and temperature
Minimum burn temperature and burning capacity per day
Dimensions: insulation thickness, metal sheet thickness for burning chamber, door, outer housing
Material: external housing, internal burning chamber, insulation materials
Blower RPM and filter counts for carbon control chamber
Maximum storage capacity and loading type
Waste/incineration safety and electrical safety features
Quantity variation up to 25% with scoping and pricing adjustments
Mandatory sample submission and OEM authorization
IS0/ISO certification and GST compliance required
Not explicitly stated; bidders should expect standard government tender payment terms per contract and may refer to ATC for any advance or milestone payments.
Delivery period can be extended with option clause; extended time calculated as (Additional quantity / Original quantity) × Original delivery period, minimum 30 days.
Penalties/LD specifics not provided; ensure compliance with contract terms and potential default remedies per GCC.
Experience in supply of sanitary equipment or incinerator machines
Financial capacity evidenced by turnover certificates for last 2 years
OEM authorization and ISO certification submitted
Main Document
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Panchayati Raj Department
DARBHANGA, BIHAR
Panchayati Raj Department
KATIHAR, BIHAR
Panchayati Raj Department
VAISHALI, BIHAR
Panchayati Raj Department
KATIHAR, BIHAR
Panchayati Raj Department
KATIHAR, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERAL | Stand provided | No |
| DIMENSIONS OF MAIN UNIT | Thickness of thermal Insulation material (mm) | 40.0 |
| DIMENSIONS OF MAIN UNIT | Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) | 5 Or higher |
| DIMENSIONS OF MAIN UNIT | Machine Weight(kg) | 51-250 |
| DIMENSIONS OF MAIN UNIT | Thickness of door including insulation (mm) | 40.0 |
| DIMENSIONS OF MAIN UNIT | Flexible emission Outlet pipe dia (mm) | 76.0 |
| MATERIAL OF MACHINE UNIT | Material of Housing cabinet (External) | Stainless Steel sheet of SS-304 grade |
| MATERIAL OF MACHINE UNIT | Material of Burning chamber (Internal) | Stainless Steel sheet of SS-304 grade |
| MATERIAL OF MACHINE UNIT | Material of Thermal Insulation | High Density Ceramic Board |
| CONTROL & FUNCTIONAL FEATURES | Temperature indicator provided | Yes |
| CONTROL & FUNCTIONAL FEATURES | Minimum Burning temperature (degree C) | 800 |
| CONTROL & FUNCTIONAL FEATURES | Burning Capacity per day (Number of Napkins) | 1000-1250 |
| CONTROL & FUNCTIONAL FEATURES | Burning Capacity at a time (Number of Napkins) | 26-50 |
| CONTROL & FUNCTIONAL FEATURES | Burning time of full capacity Napkins/pads (minutes) (Max) | 60.0 |
| ELECTRICAL AND SAFETY FEATURES | Automatic digital controller for time | Yes |
| ELECTRICAL AND SAFETY FEATURES | Automatic digital controller for temperature | Yes |
| SMOKE CONTROL UNIT (SCU) | Type of SCU (Smoke Control Unit) | Top mounted |
| SMOKE CONTROL UNIT (SCU) | Material of housing of Smoke Control Unit (SCU) | Stainless Steel of SS-304 grade |
| SMOKE CONTROL UNIT (SCU) | Both carbon Control and Foul odour Control Chambers for filteration of smoke emission | Yes |
| SMOKE CONTROL UNIT (SCU) | Number of filters in Carbon control chamber | Three |
| SMOKE CONTROL UNIT (SCU) | Type of filters in Carbon control chamber | Activated Carbon filter |
| SMOKE CONTROL UNIT (SCU) | Number of filters in Odour control chamber | Three |
| SMOKE CONTROL UNIT (SCU) | Blower RPM | 2700 |
| PERFORMANCE REQUIREMENTS | Warranty in Years (Option of comprehensive warranty is available through bidding only, which if opted will supersede normal warranty in the catalogue) | 5 Or higher |
Discover companies most likely to bid on this tender
GST Registration certificate
PAN card
UID/Adhar details (self-attested)
Experience certificates for similar work
Financial statements / Turnover certificates for last 2 years
ISO certificate
GST Return for current year and GSTR-3B
Notarized affidavit confirming not blacklisted
Income Tax Returns for AY 2022-23, 2023-24, 2024-25
Authorization Certificate from OEM (if applicable)
Catalogue/details of items being offered
Previous 5 work completion certificates
Sample submission prior to bid submission
CARC certificate or equivalent (if required)
Key insights about BIHAR tender market
Bidders must submit GST registration, PAN, UID, ISO certificate, and OEM authorization, plus sample, turnover proofs, and prior work certificates. The procurement requires ISO-compliant, SCU-equipped vending and incinerator units; follow 25% quantity variation rules and provide detailed item catalogs.
Required documents include PAN, GST returns (current year and GSTR-3B), ISO certificate, notarized non-blacklist affidavit, last two years turnover certificates, experience certificates for similar work, OEM authorization, product catalog, and prior CARC/completion certificates; sample submission is mandatory.
Key specs include insulation thickness, MS/SS burning chamber thickness, external housing material, burner temperature, daily burning capacity, per-cycle napkin capacity, automatic time and temperature controllers, SCU with carbon and odour filters, blower RPM, and battery backup suitability.
Delivery time extends using the option clause: (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extended time cannot exceed the original delivery period without approval.
A comprehensive warranty option may be bid and, if chosen, will supersede the standard catalogue warranty; bidders should quote accordingly and verify scope with the buyer's terms.
Bidders must provide ISO certification and GST compliance documents; OEM authorization is required if not a direct manufacturer; SAMPLING must be completed before bid submission.
Provide at least two years of turnover evidence, prior similar work completion certificates, and CARC or equivalent project proofs; nearest dealer preference applies for repair support and 2-year warranty considerations.
The buyer reserves a 25% variation in bid quantity during contract execution; the supplier must accommodate this with pricing adjustments at contracted rates and adjust delivery accordingly.
Sign up now to access all documents
Main Document
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS