Progress
Armoured Vehicles Nigam Limited (Defence Production) has issued a limited tender for the procurement of GASKET 765-10-2381. Scope is limited to the supply of goods, with a focus on compliant packing and correct product marking. The tender targets established suppliers and requires mandatory vendor code creation documentation (PAN, GST, cancelled cheque, EFT mandate). The bid process enforces ATC compliance on the technical sheet and warns against late submissions due to no manual extensions. The procurement emphasizes pre-auction screening and strict qualification through the vendor’s ability to meet packing, marking, and delivery standards. This opportunity is location-agnostic in the notice, but represents AVNL’s ongoing gaskets supply for defense manufacturing lines.
GASKET 765-10-2381
Scope: Supply of Goods only
Packing to prevent transit/storage damage
Marking: Firm name to be printed on packaging
Inspection: Post receipt inspection at consignee site (CGM/OFMK or authorized representative)
ATC: Mandatory vendor sign-off on Technical Compliance Sheet
Limited tender only for established suppliers
Mandatory vendor code creation documents required
No manual extension; adhere to TOD and ATC terms
GST reimbursement as per actuals or applicable rate, whichever is lower, subject to quoted GST; no explicit payment schedule provided
Delivery period defined via ATC; additional time mechanism available only through option clause with minimum 30 days
Not explicitly stated; delivery and acceptance governed by AVNL terms and post-receipt inspection results
Eligible suppliers with established track record in defense gasket supply
Must submit PAN, GST, and banking EFT mandate
Must sign Technical Compliance Sheet and meet ATC conditions
Quantity
781
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
GASKET 765-10-2381
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Medak
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Medak | Medak | - | - | 781 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Key insights about TELANGANA tender market
Submit PAN, GST, cancelled cheque, and EFT mandate; sign the Technical Compliance Sheet; comply with the limited tender for established suppliers; ensure packing, marking, and post-receipt inspection readiness; follow TOD guidelines and TOD timelines to avoid disqualification.
Required documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by the bank. Additionally, bidders must complete Vendor Code Creation and sign the Technical Compliance Sheet to participate in the AVNL procurement.
Contractor must ensure proper packing to prevent transit/storage damage and mark packaging with the firm name as specified. The markings should aid identification during inspection and avoid misdelivery at AVNL's site.
Delivery period is governed by the ATC; no fixed date given in the notice. The option clause allows quantity variation up to 50% with adjusted timelines; minimum initial delivery period is defined by TOD constraints.
Post-receipt inspection is conducted at the consignee site by CGM/OFMK or an authorized representative. Pre-dispatch inspection is not applicable unless specified in ATC; suppliers must be ready for site acceptance checks.
Submit PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate. This enables vendor code creation and participation in the AVNL procurement process; ensure documents align with their ATC and TOD timelines.
The tender explicitly states it is issued for established suppliers; quotations from other vendors will not be considered for evaluation, emphasizing prior experience and compliance with ATC requirements.