TenderDekho Logo
GEM

Indian Army Conveyor Belt Tender Tawang Arunachal Pradesh 2025 ISO 9001/IS 550 Compliant Procurement

Bid Publish Date

14-Nov-2025, 7:55 pm

Bid End Date

03-Dec-2025, 1:00 pm

Latest Corrigendum Available

Progress

RA
Issue14-Nov-2025, 7:55 pm
Corrigendum28-Nov-2025
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 11

Tender Overview

The Indian Army, Department Of Military Affairs, seeks a conveyor belt solution for delivery in TAWANG, ARUNACHAL PRADESH 790104. The tender falls under the CONVEYOR BELT category with no BOQ items listed. Key commercial terms include an option to increase/decrease quantities by up to 25%, and a dynamic delivery window tied to original delivery periods. The process requires bidders to meet turnover criteria and OEM turnover prerequisites and to commit to an AMC plan post-warranty at a capped rate. The absence of an explicit estimated contract value or EMD in the available data suggests further clarification will be issued with the official bid package. The tender emphasizes supplier eligibility, including capacity to scale within the option window and post-warranty maintenance commitments.

Technical Specifications & Requirements

  • Product: Conveyor belt systems intended for military logistics applications.
  • Delivery location: TAWANG, ARUNACHAL PRADESH.
  • Standards/certifications: explicit standards not listed in available data; bidders should verify required compliance within the formal bid package.
  • Scope indicators: no BOQ items; bidder must anticipate component-level specs, installation requirements, and system integration needs.
  • Commercial terms: 25% quantity option at contract rates; delivery period adjustments based on option exercise; minimum 30 days for added delivery if original period is insufficient.
  • Warranty/AMC: mandatory AMC for 5 years post-warranty at 2% of contract price per annum; potential renewal by Buyer.
  • OEM considerations: OEM turnover criteria apply; high-value OEM qualification if multiple bidders are involved.
  • Documentation expectations: audited turnover, CA/CA certificate, and related financial disclosures.

Terms, Conditions & Eligibility

  • EMD details are not disclosed in the available data; bidders should prepare to meet the documented EMD criteria in the official tender.
  • Turnover: minimum average annual turnover over the last 3 years; documentary evidence via audited balance sheets or CA/Cost Accountant certificate.
  • OEM turnover: minimum average turnover for the OEM of the offered product over the last 3 years; validate with official turnover documents; for bunch bids, OEM with the highest bid value must meet this criterion.
  • Warranty/AMC: post-warranty AMC for 5 years at up to 2% annually; option to enter into AMC with the successful bidder.
  • Delivery: delivery period to be defined; extension logic applies if option quantities are exercised; minimum 30 days increment for extended delivery.
  • Documentation: GST, PAN, experience certificates, financial statements, EMD submission, technical compliance certificates, OEM authorizations as applicable.
  • Evaluation will consider turnover thresholds, OEM capabilities, and ability to deliver under variable quantities and extended timelines.

Key Specifications

  • Product/service: Conveyor belt system for army logistics

  • Location: Tawang, Arunachal Pradesh

  • Quantity: Not disclosed in BOQ (requires official bid package)

  • Estimated value: Not disclosed in available data

  • Standards/certifications: Not specified in available data; verify in bid package

  • Warranty/AMC: Post-warranty AMC for 5 years at 2% per annum

  • Delivery: Option to increase/decrease quantities by up to 25%; delivery period linked to original delivery period with minimum 30 days

  • OEM requirements: OEM turnover criteria apply; highest bid OEM in bunch bids must meet turnover

Terms & Conditions

  • Option clause allows ±25% quantity changes during and after contract award

  • OEM turnover thresholds must be met by the offered product’s OEM

  • AMC required for 5 years at max 2% of contract price per year

Important Clauses

Payment Terms

EMD details not disclosed; standard government terms apply per bid package; payment conditions to be finalized in the contract.

Delivery Schedule

Delivery period begins after last date of original delivery order; if option clause exercised, extended time follows the formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Any LD/penalty terms will be specified in the final bid documents; mandatory adherence to delivery timelines and AMC obligations.

Bidder Eligibility

  • Minimum average turnover over the last 3 years as specified in the bid package

  • OEM turnover criteria met for the offered conveyor belt system

  • Ability to scale quantities by up to 25% and deliver within extended timelines

Documents 3

GeM-Bidding-8522476.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Conveyor Belt

Nmdc Steel Limited

BASTAR, CHHATTISGARH

Posted: 5 April 2025
Closed: 21 April 2025
GEM

Armed Forces Tribunal Conveyor Belt Procurement Tender 2025 Rajasthan/J&K - OEM Installation Standards

Armed Forces Tribunal

Posted: 24 December 2025
Closed: 10 January 2026
GEM

Conveyor Belt

Indian Army

AMRITSAR, PUNJAB

Posted: 17 February 2025
Closed: 10 March 2025
GEM

Indian Army Conveyor Belt Tender Bikaner Rajasthan 2026 - IS 550/IS0 Standards Compliance and EFT Bank Mandate

Indian Army

BIKANER, RAJASTHAN

Posted: 17 January 2026
Closed: 27 January 2026
GEM

CONVEYOR BELT

National Aluminium Company Limited, Bhubaneswar

ANGUL, ODISHA

Posted: 30 July 2025
Closed: 20 August 2025
GEM

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for the last 3 years

4

CA/Cost Accountant turnover certificates

5

EMD submission proof (as applicable)

6

Technical bid documents

7

OEM authorization letters (if bidding as an OEM partner)

8

Experience certificates for similar conveyor belt projects

9

Supplier registration and relevant tax compliance documents

Corrigendum Updates

2 Updates
#1

Update

28-Nov-2025

Extended Deadline

03-Dec-2025, 1:00 pm

Opening Date

03-Dec-2025, 1:30 pm

#2

Update

28-Nov-2025

Extended Deadline

29-Nov-2025, 1:00 pm

Opening Date

29-Nov-2025, 1:30 pm

Reverse Auction Schedule

Completed

Start

06-Dec-2025, 5:00 pm

End

08-Dec-2025, 5:00 pm

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1Subhajeet Biswas & Associates(MSE,MII)   Under PMA Winner ₹3,79,299Item Categories : CONVEYOR BELT
L2PRODIGIZON (OPC) PRIVATE LIMITED (MSE,MII)   Under PMA₹4,40,400Item Categories : CONVEYOR BELT

🎉 L1 Winner

Subhajeet Biswas & Associates(MSE,MII)   Under PMA

Final Price: ₹3,79,299

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid for the conveyor belt tender in Tawang Arunachal Pradesh 2025?

To bid, prepare audited financial statements for the last 3 years, CA turnover certificates, GST and PAN, experience certificates for similar projects, and OEM authorizations. Submit technical bids with compliance checks for the conveyor belt system and confirm OEM turnover thresholds as required by the tender package.

What documents are required for the conveyor belt procurement in Arunachal Pradesh?

Required documents include GST registration, PAN card, 3-year turnover proof, audited balance sheets, CA certificates, experience certificates for similar belts, OEM authorization, and EMD submission proof. Also include technical bid and any quality certifications relevant to conveyor belts.

What are the delivery terms for the conveyor belt contract in Tawang?

Delivery begins after the original delivery order; if quantities increase by up to 25%, the extended delivery time is computed as (Increase/Original) × Original period, with a minimum of 30 days. Ensure compliance with post-warranty AMC terms at 2% per year.

What AMC commitments are required for the conveyor belt bid in 2025?

Bidders must commit to AMC for 5 years after warranty, with a rate not exceeding 2% of the contract price per annum. The buyer may negotiate AMC terms post-warranty on the successful bidder’s proposal.

What are the OEM turnover requirements for the belt system tender?

OEMs must meet the minimum average turnover for the last 3 years; if the bidding is a bunch, the OEM related to the primary product with the highest bid value must meet this criterion, supported by audited statements or CA/cost accountant certificates.

How to verify compliance with standards for the conveyor belt tender in Arunachal?

Official bid documents will specify required standards; bidders should prepare to show ISI/IS 550 or other military-grade certifications if mandated, along with OEM certifications and product test reports aligned to military logistics requirements.

When is the price and quantity adjustment permitted in this tender?

Quantity can be adjusted by up to 25% during award and within the contract’s currency. The exact pricing remains at contracted rates; any extension follows the defined delivery time calculation and minimum 30-day rule.

What is the minimum eligibility for bidders offering conveyor belts to the Indian Army?

Eligibility requires demonstrated turnover compliance, at least 3 years of relevant belt delivery experience, OEM authorization, ability to meet the option-based quantity changes, and readiness to commit to a 5-year AMC post-warranty with specified annual pricing.