ISOLATOR SWITCH,WATER SEPARATOR,FUEL PIPE,KILOMETER CABLE,GEAR LEVER RAPAIR KIT,ACCELERATOR CABLE,R
Indian Army
Ajmer, RAJASTHAN
Bid Publish Date
29-Dec-2025, 5:28 pm
Bid End Date
03-Feb-2026, 6:00 pm
EMD
₹44,000
Value
₹22,09,945
Location
Progress
Quantity
16
Category
Main switch Isolator fixed contact assembly 01 pole equal to 1 Nos consists of 02 PCs of FC assembly
Bid Type
Single Packet Bid
Public procurement opportunity for Nhpc Limited Main switch Isolator fixed contact assembly 01 pole equal to 1 Nos consists of 02 PCs of FC assembly, Main switch Isolator moving contact assembly, Rotating stool base with liver arm or clamp, Main switch phase coupling 32NB GI pipe For Normal Isolator, ISOLATOR OPERATING MECHANISM BOX with MOTOR, Main switch phase coupling 32NB GI pipe For Tandem type Isolator in DARJEELING, WEST BENGAL. Quantity: 16 issued by. Submission Deadline: 03-02-2026 18: 00: 00. View full details and respond.
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Ajmer, RAJASTHAN
Indian Army
NASHIK, MAHARASHTRA
Indian Army
Indian Army
Northern Coalfields Limited
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Main switch Isolator fixed contact assembly 01 pole equal to 1 Nos consists of 02 PCs of FC assembly | MAKE SIEMENS | 3 | nos | 102272w | 168 |
| 2 | Main switch Isolator moving contact assembly | MAKE SIEMENS | 3 | nos | 102272w | 168 |
| 3 | Rotating stool base with liver arm or clamp | MAKE SIEMENS | 3 | nos | 102272w | 168 |
| 4 | Main switch phase coupling 32NB GI pipe For Normal Isolator | MAKE SIEMENS | 3 | nos | 102272w | 168 |
| 5 | ISOLATOR OPERATING MECHANISM BOX with MOTOR | MAKE SIEMENS | 1 | nos | 102272w | 168 |
| 6 | Main switch phase coupling 32NB GI pipe For Tandem type Isolator | MAKE SIEMENS | 3 | nos | 102272w | 168 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
03-Feb-2026, 6:00 pm
Opening Date
03-Feb-2026, 6:30 pm
Extended Deadline
27-Jan-2026, 6:00 pm
Opening Date
27-Jan-2026, 6:30 pm
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS