TenderDekho Logo
Closed GEM

Contract Bidding Open For CFW0111236 160202060 WASHER SPRING,110CS11449 NUT,110FD11024 1502112130 BOLT REAMER,116CS91775 BEAR in WEST DELHI, DELHI

Bid Publish Date

30-May-2025, 3:06 pm

Bid End Date

02-Jul-2025, 5:00 pm

Progress

RA
Issue30-May-2025, 3:06 pm
Reverse Auction19-Jul-2025, 9:00 am
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

5746

Category

CFW0111236 160202060 WASHER SPRING

Bid Type

Two Packet Bid

Categories 43

Indian Army has released a public tender for CFW0111236 160202060 WASHER SPRING, 110CS11449 NUT, 110FD11024 1502112130 BOLT REAMER, 116CS91775 BEAR in WEST DELHI, DELHI. Quantity: 5746. Submission Deadline: 02-07-2025 17: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7876290.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 167 Items Sign in for GEM prices

#1

CFW0111236 160202060 WASHER SPRING

CFW0111236 160202060 WASHER SPRING

642 nos Delivery: 150 days
#2

110CS11449 NUT

110CS11449 NUT

6 nos Delivery: 150 days
#3

110FD11024 1502112130 BOLT REAMER

110FD11024 1502112130 BOLT REAMER

24 nos Delivery: 150 days
#4

116CS91775 BEARING TAPER ROLLER

116CS91775 BEARING TAPER ROLLER

3 nos Delivery: 150 days
#5

116CS51258 SHAFT BEVEL GEAR

116CS51258 SHAFT BEVEL GEAR

2 nos Delivery: 150 days
#6

116CS02041 1542112340 TUBE

116CS02041 1542112340 TUBE

2 nos Delivery: 150 days
#7

116CS02058 1542112220 TUBE

116CS02058 1542112220 TUBE

2 nos Delivery: 150 days
#8

116CS11487 1502123111 PLATE

116CS11487 1502123111 PLATE

210 nos Delivery: 150 days
#9

116CS61456 1542113120 RING SEAL

116CS61456 1542113120 RING SEAL

30 nos Delivery: 150 days
#10

125CS91028 175221140 DISC

125CS91028 175221140 DISC

240 nos Delivery: 150 days
#11

116CS91394 1752211240 RING SEAL

116CS91394 1752211240 RING SEAL

30 nos Delivery: 150 days
#12

116CS11381 1352113170 LOCK

116CS11381 1352113170 LOCK

15 nos Delivery: 150 days
#13

CFK0200413 401000413 KEY

CFK0200413 401000413 KEY

15 nos Delivery: 150 days
#14

CFS0131220 SCREW

CFS0131220 SCREW

18 nos Delivery: 150 days
#15

CFB1121890 BOLT

CFB1121890 BOLT

72 nos Delivery: 150 days
#16

CFP0401024 PIN DOWEL

CFP0401024 PIN DOWEL

21 nos Delivery: 150 days
#17

116CS11413 1752211170 RING SNAP

116CS11413 1752211170 RING SNAP

6 nos Delivery: 150 days
#18

116CS31437 PISTON

116CS31437 PISTON

3 nos Delivery: 150 days
#19

116CS11421 PLATE RING

116CS11421 PLATE RING

2 nos Delivery: 150 days
#20

116CS11519 1752211180 SPRING

116CS11519 1752211180 SPRING

8 nos Delivery: 150 days
#21

116CS31364 PLATE PRESSURE

116CS31364 PLATE PRESSURE

2 nos Delivery: 150 days
#22

525400030000 SEAL BEARING

525400030000 SEAL BEARING

30 nos Delivery: 150 days
#23

116BR71488 SEAT

116BR71488 SEAT

30 nos Delivery: 150 days
#24

116BR11296 WASHER

116BR11296 WASHER

30 nos Delivery: 150 days
#25

116BR71528 GASKET

116BR71528 GASKET

30 nos Delivery: 150 days
#26

116BR71536 GASKET

116BR71536 GASKET

30 nos Delivery: 150 days
#27

CFS0131016 BOLT

CFS0131016 BOLT

45 nos Delivery: 150 days
#28

CFB0721850 BOLT

CFB0721850 BOLT

120 nos Delivery: 150 days
#29

CFN1921613 150041613 NUT

CFN1921613 150041613 NUT

90 nos Delivery: 150 days
#30

CFP0104025 4050004025 PIN COTTER

CFP0104025 4050004025 PIN COTTER

135 nos Delivery: 150 days
#31

125BR11035 1003313120 SPRING

125BR11035 1003313120 SPRING

12 nos Delivery: 150 days
#32

116BR11336 BOLT ADJUSTING

116BR11336 BOLT ADJUSTING

9 nos Delivery: 150 days
#33

116BR11214 YOKE

116BR11214 YOKE

6 nos Delivery: 150 days
#34

CFY0121664 YOKE

CFY0121664 YOKE

6 nos Delivery: 150 days
#35

116BR11271 ROD

116BR11271 ROD

6 nos Delivery: 150 days
#36

524391003400 1500913150 BEARING NEEDLE

524391003400 1500913150 BEARING NEEDLE

3 nos Delivery: 150 days
#37

CFR0600511 441200511 RIVET

CFR0600511 441200511 RIVET

90 nos Delivery: 150 days
#38

116BR21072 1543311131 LINING BRAKE

116BR21072 1543311131 LINING BRAKE

18 nos Delivery: 150 days
#39

116BR02004 BAND ASSY

116BR02004 BAND ASSY

3 nos Delivery: 150 days
#40

116BR11369 PIN

116BR11369 PIN

6 nos Delivery: 150 days
#41

116BR51237 LEVER

116BR51237 LEVER

2 nos Delivery: 150 days
#42

116BR51342 END BRAKE BAND

116BR51342 END BRAKE BAND

2 nos Delivery: 150 days
#43

116BR11499 COVER

116BR11499 COVER

2 nos Delivery: 150 days
#44

CFS0130835 BOLT

CFS0130835 BOLT

45 nos Delivery: 150 days
#45

CFP0211235 PIN

CFP0211235 PIN

59 nos Delivery: 150 days
#46

CFN2021610 150141608 NUT

CFN2021610 150141608 NUT

6 nos Delivery: 150 days
#47

505400060000 612203504 SEAL BEARING

505400060000 612203504 SEAL BEARING

90 nos Delivery: 150 days
#48

CFP0104022 PIN COTTER

CFP0104022 PIN COTTER

45 nos Delivery: 150 days
#49

CFS0130812 BOLT

CFS0130812 BOLT

18 nos Delivery: 150 days
#50

CFP0211438 42051438 PIN

CFP0211438 42051438 PIN

12 nos Delivery: 150 days
#51

CFB0121245 BOLT

CFB0121245 BOLT

6 nos Delivery: 150 days
#52

116CO12075 1544411820 SPRING

116CO12075 1544411820 SPRING

6 nos Delivery: 150 days
#53

116CO02266 BEARING

116CO02266 BEARING

2 nos Delivery: 150 days
#54

140701070000 BEARING

140701070000 BEARING

2 nos Delivery: 150 days
#55

CBN0103520 612003520 BEARING

CBN0103520 612003520 BEARING

5 nos Delivery: 150 days
#56

CFN2021408 NUT

CFN2021408 NUT

9 nos Delivery: 150 days
#57

116CO02282 1544411721 PAWL

116CO02282 1544411721 PAWL

3 nos Delivery: 150 days
#58

CFY0121456 420111456 YOKE

CFY0121456 420111456 YOKE

9 nos Delivery: 150 days
#59

CFK0200728 KEY

CFK0200728 KEY

3 nos Delivery: 150 days
#60

116CO02299 1544411730 STOPPER

116CO02299 1544411730 STOPPER

2 nos Delivery: 150 days
#61

116CO02411 1544411520 SHAFT

116CO02411 1544411520 SHAFT

2 nos Delivery: 150 days
#62

116CV71176 GASKET

116CV71176 GASKET

30 nos Delivery: 150 days
#63

CHS0113030 O RING

CHS0113030 O RING

45 nos Delivery: 150 days
#64

CHS0600025 SEAL OIL

CHS0600025 SEAL OIL

30 nos Delivery: 150 days
#65

CHS0113020 O RING

CHS0113020 O RING

135 nos Delivery: 150 days
#66

CFB0221200 BOLT

CFB0221200 BOLT

75 nos Delivery: 150 days
#67

116CV01004 1542101011 10 13 CONTROL VALVE ASSY STR CONT

116CV01004 1542101011 10 13 CONTROL VALVE ASSY STR CONT

5 nos Delivery: 150 days
#68

CFL0213515 RING SNAP

CFL0213515 RING SNAP

12 nos Delivery: 150 days
#69

CFK0200519 KEY

CFK0200519 KEY

3 nos Delivery: 150 days
#70

110MC01014 PUMP ASSY STEERING

110MC01014 PUMP ASSY STEERING

8 nos Delivery: 150 days
#71

CFS0111030 SCREW

CFS0111030 SCREW

6 nos Delivery: 150 days
#72

CFB0111295 BOLT

CFB0111295 BOLT

12 nos Delivery: 150 days
#73

116PS02024 1541911250 MAGNET

116PS02024 1541911250 MAGNET

15 nos Delivery: 150 days
#74

116PS91133 1541911142 SCREEN

116PS91133 1541911142 SCREEN

15 nos Delivery: 150 days
#75

CHS0113120 700003120 O RING

CHS0113120 700003120 O RING

15 nos Delivery: 150 days
#76

CHS0401621 GASKET

CHS0401621 GASKET

15 nos Delivery: 150 days
#77

125PT11147 PLUG

125PT11147 PLUG

3 nos Delivery: 150 days
#78

524300450001 1541912130 ELEMENT FILTER

524300450001 1541912130 ELEMENT FILTER

15 nos Delivery: 150 days
#79

CHS0113098 O RING

CHS0113098 O RING

15 nos Delivery: 150 days
#80

CHH1112005 711501205 HOSE

CHH1112005 711501205 HOSE

15 nos Delivery: 150 days
#81

CHH2201006 HOSE

CHH2201006 HOSE

15 nos Delivery: 150 days
#82

CHH2201204 710200604 HOSE

CHH2201204 710200604 HOSE

15 nos Delivery: 150 days
#83

CHH2201004 710200504 HOSE

CHH2201004 710200504 HOSE

15 nos Delivery: 150 days
#84

CCA0413036 NIPPLE

CCA0413036 NIPPLE

3 nos Delivery: 150 days
#85

CFG0320052 73710250 FLANGE

CFG0320052 73710250 FLANGE

24 nos Delivery: 150 days
#86

116PS02195 1501925310 CLAMP

116PS02195 1501925310 CLAMP

18 nos Delivery: 150 days
#87

116PS02202 CLAMP

116PS02202 CLAMP

3 nos Delivery: 150 days
#88

116PS02243 CLAMP

116PS02243 CLAMP

6 nos Delivery: 150 days
#89

116PS02316 CLAMP

116PS02316 CLAMP

3 nos Delivery: 150 days
#90

116PS12125 CLAMP

116PS12125 CLAMP

6 nos Delivery: 150 days
#91

CPF01810522 ELBOW

CPF01810522 ELBOW

1 nos Delivery: 150 days
#92

CPF1510524 ELBOW

CPF1510524 ELBOW

1 nos Delivery: 150 days
#93

116PS02276 TUBE

116PS02276 TUBE

1 nos Delivery: 150 days
#94

116PS02292 TUBE

116PS02292 TUBE

1 nos Delivery: 150 days
#95

116PS02349 1501918212 TUBE

116PS02349 1501918212 TUBE

1 nos Delivery: 150 days
#96

116TF61905 GASKET

116TF61905 GASKET

30 nos Delivery: 150 days
#97

125TF63451 SEAL

125TF63451 SEAL

60 nos Delivery: 150 days
#98

CFW0112472 WASHER SPRING

CFW0112472 WASHER SPRING

18 nos Delivery: 150 days
#99

CFB0222400 104132400 BOLT

CFB0222400 104132400 BOLT

12 nos Delivery: 150 days
#100

116TF11741 PIN DOWEL

116TF11741 PIN DOWEL

6 nos Delivery: 150 days
#101

125TF15515 BUSHING

125TF15515 BUSHING

3 nos Delivery: 150 days
#102

116TF02037 1543011272 SUPPORT RH

116TF02037 1543011272 SUPPORT RH

2 nos Delivery: 150 days
#103

116TF02045 1543011282 SUPPORT LH

116TF02045 1543011282 SUPPORT LH

2 nos Delivery: 150 days
#104

116TF02264 COVER LH

116TF02264 COVER LH

1 nos Delivery: 150 days
#105

116TF02272 COVER RH

116TF02272 COVER RH

1 nos Delivery: 150 days
#106

116TF02053 1543011323 COVER

116TF02053 1543011323 COVER

2 nos Delivery: 150 days
#107

116TF02061 1543011362 COVER

116TF02061 1543011362 COVER

2 nos Delivery: 150 days
#108

CHS0115070 700005070 O RING

CHS0115070 700005070 O RING

30 nos Delivery: 150 days
#109

CHS0115100 700005100 O RING

CHS0115100 700005100 O RING

30 nos Delivery: 150 days
#110

110TF91181 1503013530 SEAT GREASE FILLER

110TF91181 1503013530 SEAT GREASE FILLER

30 nos Delivery: 150 days
#111

116TF71552 1503013430 SEAL

116TF71552 1503013430 SEAL

60 nos Delivery: 150 days
#112

116TF72598 PACKING

116TF72598 PACKING

30 nos Delivery: 150 days
#113

116TF71852 1543011211 GASKET

116TF71852 1543011211 GASKET

30 nos Delivery: 150 days
#114

116TF91568 1503013441 GASKET

116TF91568 1503013441 GASKET

30 nos Delivery: 150 days
#115

116TF71585 1503013470 RING BACK UP

116TF71585 1503013470 RING BACK UP

30 nos Delivery: 150 days
#116

116TF21542 1503013340 BUSHING

116TF21542 1503013340 BUSHING

24 nos Delivery: 150 days
#117

116TF11911 WASHER

116TF11911 WASHER

24 nos Delivery: 150 days
#118

116TF11928 LOCK

116TF11928 LOCK

24 nos Delivery: 150 days
#119

116TF02029 1543011141 CYLINDER

116TF02029 1543011141 CYLINDER

18 nos Delivery: 150 days
#120

116TF11539 RING SNAP

116TF11539 RING SNAP

18 nos Delivery: 150 days
#121

110TF11363 1503013520 PLUG GREASE DISCHARGE

110TF11363 1503013520 PLUG GREASE DISCHARGE

15 nos Delivery: 150 days
#122

116TF11596 1503013480 RING

116TF11596 1503013480 RING

15 nos Delivery: 150 days
#123

116TF91576 1503013460 RING SNAP

116TF91576 1503013460 RING SNAP

15 nos Delivery: 150 days
#124

116TF51789 1543011132 ROD

116TF51789 1543011132 ROD

6 nos Delivery: 150 days
#125

116TFB0108 1543000150 PISTON ASSY

116TFB0108 1543000150 PISTON ASSY

3 nos Delivery: 150 days
#126

116TF31805 COVER

116TF31805 COVER

2 nos Delivery: 150 days
#127

116TF02012 1503012321 SPRING RUBBER COATED

116TF02012 1503012321 SPRING RUBBER COATED

120 nos Delivery: 150 days
#128

116TFB0149 1503000035 SEAL RING ASSY

116TFB0149 1503000035 SEAL RING ASSY

60 nos Delivery: 150 days
#129

CHS0115105 700005105 O RING

CHS0115105 700005105 O RING

60 nos Delivery: 150 days
#130

CHS013058 O RING

CHS013058 O RING

105 nos Delivery: 150 days
#131

116TF11482 SPRING WASHER LM

116TF11482 SPRING WASHER LM

96 nos Delivery: 150 days
#132

CFS0131625 104031625 BOLT

CFS0131625 104031625 BOLT

60 nos Delivery: 150 days
#133

116TF11506 1503012310 SEAT

116TF11506 1503012310 SEAT

60 nos Delivery: 150 days
#134

116TF12121 BOLT

116TF12121 BOLT

30 nos Delivery: 150 days
#135

CFS0132045 104032045 BOLT

CFS0132045 104032045 BOLT

585 nos Delivery: 150 days
#136

CFN0111615 NUT

CFN0111615 NUT

99 nos Delivery: 150 days
#137

116TF02004 1503022115 IDLER FRONT

116TF02004 1503022115 IDLER FRONT

6 nos Delivery: 150 days
#138

116TF43315 BEARING FRONT IDLER

116TF43315 BEARING FRONT IDLER

6 nos Delivery: 150 days
#139

116TF22158 BUSHING FRONT IDLER

116TF22158 BUSHING FRONT IDLER

6 nos Delivery: 150 days
#140

116TF31513 524300380001 GUIDE SPRING

116TF31513 524300380001 GUIDE SPRING

6 nos Delivery: 150 days
#141

116TF32615 BRACKET LH

116TF32615 BRACKET LH

3 nos Delivery: 150 days
#142

116TF32623 BRACKET RH

116TF32623 BRACKET RH

3 nos Delivery: 150 days
#143

116TF52071 SHAFT IDLER FRONT

116TF52071 SHAFT IDLER FRONT

3 nos Delivery: 150 days
#144

116TF02142 SCRAPER LH

116TF02142 SCRAPER LH

3 nos Delivery: 150 days
#145

116TF02159 SCRAPER RH

116TF02159 SCRAPER RH

3 nos Delivery: 150 days
#146

116TF02134 YOKE

116TF02134 YOKE

3 nos Delivery: 150 days
#147

116TFB0124 1543000072 FRONT IDLER ASSY

116TFB0124 1543000072 FRONT IDLER ASSY

3 nos Delivery: 150 days
#148

116TF11944 SHIM 06mm

116TF11944 SHIM 06mm

30 nos Delivery: 150 days
#149

116TFB0173 1543000301 CARRIER ROLLER ASSY

116TFB0173 1543000301 CARRIER ROLLER ASSY

60 nos Delivery: 150 days
#150

116TFB0181 1543000400 TRACK ROLLER ASSY DF

116TFB0181 1543000400 TRACK ROLLER ASSY DF

60 nos Delivery: 150 days
#151

116TFB0198 1543000500 TRACK ROLLER ASSY SF

116TFB0198 1543000500 TRACK ROLLER ASSY SF

120 nos Delivery: 150 days
#152

CFN0412218 150332418 NUT

CFN0412218 150332418 NUT

120 nos Delivery: 150 days
#153

116TF11693 SPACER

116TF11693 SPACER

120 nos Delivery: 150 days
#154

524391002830 BOLT

524391002830 BOLT

120 nos Delivery: 150 days
#155

116TF02094 1543011416 GUARD INNER RH

116TF02094 1543011416 GUARD INNER RH

3 nos Delivery: 150 days
#156

116TF02101 GUARD INNER LH

116TF02101 GUARD INNER LH

3 nos Delivery: 150 days
#157

116TF02118 1543011435 GUARD OUTER RH

116TF02118 1543011435 GUARD OUTER RH

3 nos Delivery: 150 days
#158

116TF02126 1543011445 GUARD INNER LH

116TF02126 1543011445 GUARD INNER LH

3 nos Delivery: 150 days
#159

521300000633 BRACKET

521300000633 BRACKET

9 nos Delivery: 150 days
#160

116TF52096 1543012140 GUIDE

116TF52096 1543012140 GUIDE

2 nos Delivery: 150 days
#161

116CT01007 1543201001 TRACK SHOE ASSY

116CT01007 1543201001 TRACK SHOE ASSY

30 nos Delivery: 150 days
#162

116CT11108 1543211190 PIN MASTER

116CT11108 1543211190 PIN MASTER

30 nos Delivery: 150 days
#163

116CT91097 1543211260 SEAL DUST MASTER

116CT91097 1543211260 SEAL DUST MASTER

60 nos Delivery: 150 days
#164

116EB02031 1545011192 PAD RUBBER

116EB02031 1545011192 PAD RUBBER

60 nos Delivery: 150 days
#165

CHS0115080 O RING

CHS0115080 O RING

30 nos Delivery: 150 days
#166

CFB0122075 104042075 BOLT

CFB0122075 104042075 BOLT

24 nos Delivery: 150 days
#167

116EB02015 PIN CENTRE

116EB02015 PIN CENTRE

2 nos Delivery: 150 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

20-Jun-2025

Reverse Auction Schedule

Completed

Start

19-Jul-2025, 9:00 am

End

21-Jul-2025, 12:35 pm

Duration: 52 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-30-06-2025 10:54:38
2
**********   Under PMA
-29-06-2025 22:50:07
3
**********   Under PMA
-19-06-2025 18:58:08
4
**********   Under PMA
-19-06-2025 18:23:59
5
**********   Under PMA
-17-06-2025 13:32:47

Frequently Asked Questions

Key insights about DELHI tender market

What are the eligibility requirements for GEM/2025/B/6263511?

The eligibility requirements entail that bidders must be registered entities with a valid business license and relevant experience in similar procurements. Financial stability is essential, and bidders are advised to present proof of capability in supplying the required machinery. Compliance with technical specifications and quality assurance standards is also mandatory for all submissions.

What certifications are required for bidding on GEM/2025/B/6263511?

Bidders must possess appropriate certifications that may include ISO certifications, compliance with military standards, and any relevant local governmental approvals. These required certificates are crucial to demonstrate that the offered machinery meets rigorous safety and quality metrics established for military equipment.

What documentation is needed for the registration process of GEM/2025/B/6263511?

The registration process requires a completed form alongside supporting documents such as company profile, financial statements, technical proposals, and mandatory certifications. It is imperative to ensure that all documents are submitted in the correct format as outlined in the tender to avoid disqualification.

What are the accepted document formats for submissions in GEM/2025/B/6263511?

Bidders should ensure that all submissions adhere to the accepted formats which typically include PDF for documentation, Excel for pricing tables, and other specified formats in the tender guidelines. Ensuring the correct document formats will facilitate smoother submission evaluation processes.

What are the payment terms and evaluation criteria for GEM/2025/B/6263511?

The payment terms generally stipulate upfront payments and subsequent milestones linked to delivery and acceptance of goods. The evaluation considers total costs, technical adherence, delivery schedules, and post-delivery support services. A transparent scoring system will be applied to ensure fairness in the selection and award process.