Progress
Gujarat State Electricity Corporation Limited (GSECL), Vadodara, invites bids for the supply of PA FAN LOP FILTER, FD FAN LOP FILTER, ID FAN LOP FILTER, APH LOP FILTER ELEMENT, LUB OIL FILTERS, AIR FILTER CUM BREATHER. The exact quantities are not disclosed in the BoQ; the contract allows a quantity variation up to 25% at the time of order and during the contract period at contracted rates. The procurement references Schedule-B and a yet-to-be-view ATC document for technical specifics. The absence of explicit estimated value and EMD details requires bidders to rely on the Schedule-B terms and ATC. The awardTerms include delivery timelines linked to the last delivery order date and potential extension rules. This tender emphasizes conformance to GSECL ATC and Schedule-B supply conditions, with delivery and pricing flexibility built into the option clause. The location is Vadodara, Gujarat, and the tender targets filtration components for power generation equipment. A distinctive feature is the explicit reservation of ATC finality by GSECL, which governs all technical and contractual interpretations.
Product/service names and categories: PA FAN LOP FILTER, FD FAN LOP FILTER, ID FAN LOP FILTER, APH LOP FILTER ELEMENT, LUB OIL FILTERS, AIR FILTER CUM BREATHER
Quantities: Not disclosed in BoQ; review Schedule-B for itemized quantities
EMD/estimated value: Not specified in tender data
Experience requirements: Not specified; ATC may define technical capability
Quality/standards: Not specified; IS/IS- style compliance to be defined in ATC
Delivery requirements: 25% quantity variation allowed; delivery period starts from last delivery order date
Option Clause: up to 25% quantity increase during contract at contracted rates
Delivery extension: minimum 30 days for any extended period
ATC finality: GSECL ATC governs technical and contractual terms
Schedule-B reliance: All supply terms must conform to Schedule-B and ATC
Not specified in data; to be clarified in Schedule-B/ATC
Delivery period commences from last date of original delivery order; extension rules apply with 30-day minimum when quantity increases
Not specified in data; check ATC for LD/penalty provisions
Compliance with Schedule-B and Buyer Added ATC
Ability to supply PA/FD/ID FAN LOP FILTERS, APH LOP FILTER ELEMENTS, LUB OIL/FILTERS
Experience in supplying filtration components for power generation or similar equipment
Quantity
56
Category
PA FAN LOP FILTER
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PA FAN LOP FILTER , FD FAN LOP FILTER , ID FAN LOP FILTER , APH LOP FILTER ELEMENT , LUB OIL FILTERS , AIR FILTER CUM BREATHER
Advisory Bank
Bank Of Baroda
ePBG Percentage
5%
ePBG Duration (Months)
5
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Tapi
Delivery Pincodes
394680
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pallavkumar Maganbhai Solanki | 394680,GSECL UKAI TPS, UKAI DAM, DIST: TAPI | Tapi | Gujarat | 394680 | 8 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
12-Oct-2026, 9:30 am
Opening Date
13-Oct-2026, 9:30 am
PA FAN LOP FILTER
PA FAN LOP FILTER
FD FAN LOP FILTER
FD FAN LOP FILTER
ID FAN LOP FILTER
ID FAN LOP FILTER
APH LOP FILTER ELEMENT
APH LOP FILTER ELEMENT
LUB OIL FILTERS
LUB OIL FILTERS
AIR FILTER CUM BREATHER
AIR FILTER CUM BREATHER
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | PA FAN LOP FILTER | PA FAN LOP FILTER | 8 | number | con11.gsecl | 90 | |
| 2 | FD FAN LOP FILTER | FD FAN LOP FILTER | 8 | number | con11.gsecl | 90 | |
| 3 | ID FAN LOP FILTER | ID FAN LOP FILTER | 8 | number | con11.gsecl | 90 | |
| 4 | APH LOP FILTER ELEMENT | APH LOP FILTER ELEMENT | 16 | number | con11.gsecl | 90 | |
| 5 | LUB OIL FILTERS | LUB OIL FILTERS | 8 | number | con11.gsecl | 90 | |
| 6 | AIR FILTER CUM BREATHER | AIR FILTER CUM BREATHER | 8 | number | con11.gsecl | 90 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar filter supply
Financial statements / turnover proof
EMD/Security deposit documents (as applicable by Schedule-B)
Technical bid documents and compliance statements
OEM authorizations (if not manufacturer)
Any ATC-specific documents requested in the Buyer Added ATC
Key insights about GUJARAT tender market
Bidders must align with Schedule-B and the Buyer Added ATC, submit GST, PAN, and experience certificates, and ensure compliance with ATC final terms. The tender allows up to 25% quantity variation and requires delivery terms tied to the last delivery order. Verify EMD details in Schedule-B and ATC.
Submit GST certificate, PAN card, experience certificates for filtration supply, financial statements, EMD documentation, technical bid, OEM authorizations if applicable, and ATC-specific documents. Ensure Schedule-B compliance and any additional bidder disclosures requested in ATC.
Technical specifics are defined in Schedule-B and the ATC document. The BoQ lists six filter categories, but exact performance metrics, material norms, and dimensional tolerances are not provided in the data. Refer to ATC for IS/standards and testing criteria.
Delivery starts from the last date of the original delivery order. If the option clause is exercised, extended time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend to the original delivery period.
The EMD amount is not specified in the tender data published here. Bidders should verify EMD requirements in the Schedule-B and ATC documents, and prepare eligible security deposits accordingly.
Standards are defined in the ATC and Schedule-B; the tender data does not specify IS/ISO codes. Bidders must obtain and demonstrate compliance with IS or equivalent filtration standards as per ATC acceptance criteria.
If not a manufacturer, submit OEM authorization letters confirming supply rights for PA/FD/ID LOP FILTERS and APH filter elements. Ensure the ATC recognizes OEM credentials and aligns with Schedule-B product specifications.