LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5),LED Luminaire for Flood
Indian Army
Progress
RAQuantity
1
Bid Type
Two Packet Bid
Hindustan Aeronautics Limited (HAL), under the Department Of Defence Production, invites offers for a LED UV-A lamp that complies with ASTM E 3022 requirements. The procurement scope is limited to the supply of goods (no BOQ items listed) with an assumed project-scale in the absence of a disclosed estimated value. The tender emphasizes bilateral terms, GST considerations, and invoicing in the consignee's name with the consignee GSTIN. A key differentiator is the option clause allowing a ±25% quantity adjustment at bid/contract and during the currency of the contract, with delivery timelines linked to the original delivery cycle and extended periods. The tender specifies supplier documentation for vendor code creation and GST-related processes via GeM portal, aligning with standard government procurement practices. The procurement context is a supply contract for LED UV-A lamps meeting ASTM E 3022, with a focus on compliance, invoicing discipline, and risk management through clear termination triggers. The tender lacks a detailed location in the data provided but is positioned within HAL’s defence production procurement framework, signaling high-grade compliance and traceability requirements.
Product: LED UV-A lamp
Standard: ASTM E 3022 compliant
Scope: Supply of Goods (not installation)
Delivery: Delivery period tied to original order; extended via option clause
GST: GST as applicable; invoice in consignee name with consignee GSTIN
Vendor setup: PAN, GSTIN, cancelled cheque, EFT mandate
Commercial: Up to 25% quantity variation allowed at contract placement and during currency
Documentation: GeM vendor code creation documents
Quantity may be increased/decreased by up to 25% at bid/contract and during currency
GST invoicing rules: invoice in consignee name with consignee GSTIN; GST portal payment screenshot
Delivery period adjustments follow original/extended periods; minimum 30 days for additional time
GST compliance; payment per government norms; GST reimbursement as actuals or lower rate
Delivery period starts from last date of original delivery order; option clause may adjust timing
HAL may terminate for non-delivery, misrepresentation, bankruptcy, or failure to comply with material terms
Must provide PAN, GSTIN, and EFT mandate
Must be prepared to supply LED UV-A lamps meeting ASTM E 3022
Must participate via GeM portal with vendor code
Main Document
OTHER
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
Hindustan Aeronautics Limited (hal)
BANGALORE, KARNATAKA
Bharat Dynamics Limited
MEDAK, TELANGANA
Mangalore Refinery And Petrochemicals Limited
Tender Results
Loading results...
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by bank
GST invoice with consignee GSTIN (GeM portal upload)
Start
08-Jan-2026, 12:00 pm
End
12-Jan-2026, 9:00 am
Duration: 93 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AMIT ENGINEERS Under PMA | Make : ITW Model : EV6000 HAND HELD LED UV LAMP Title : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light should meet all the requirements of ASTM E 3022 & ASTM | 04-12-2025 16:09:04 | Qualified |
| 2 | ELECTRO-MAGFIELD CONTROLS & SERVICES Under PMA | Make : Unbrand Model : UV 365HC Title : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light should meet all the requirements of ASTM E 3022 & ASTM | 25-11-2025 17:15:29 | Qualified |
| 3 | GNAT TECHNOLOGIES PRIVATE LIMITED Under PMA | Make : Brand Model : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light Title : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light should meet all the requirements of ASTM E 3022 & ASTM | 20-11-2025 13:39:23 | Qualified |
| 4 | ROMESH & CO Under PMA | Make : Magnaflux Model : EV6000 Title : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light should meet all the requirements of ASTM E 3022 & ASTM | 05-12-2025 16:01:56 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | GNAT TECHNOLOGIES PRIVATE LIMITED( MSE Social Category:General ) Under PMA | ₹1,26,000 | Item Categories : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light should meet all the requirements of ASTM E 3022 & AST |
| L2 | ELECTRO-MAGFIELD CONTROLS & SERVICES Under PMA | ₹1,60,000 | Item Categories : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light should meet all the requirements of ASTM E 3022 & AST |
| L3 | AMIT ENGINEERS Under PMA | ₹3,65,072 | Item Categories : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light should meet all the requirements of ASTM E 3022 & AST |
| L4 | ROMESH & CO Under PMA | ₹3,80,284 | Item Categories : 20-9998-1-LED UV-A LAMP 1. The LED UV-A light should meet all the requirements of ASTM E 3022 & AST |
Key insights about ODISHA tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; GeM portal requires GST invoice with consignee GSTIN and payment screenshot. Ensure lamp meets ASTM E 3022 and that vendor code is created for HAL tender participation.
The contract allows ±25% quantity variation both at bid and during currency. Delivery timing adjusts proportionally with minimum 30 days for any increased time; plan for possible additional orders without changing contracted rates.
Lamps must be ASTM E 3022 compliant; ensure performance and safety requirements align with this standard; verify lab test reports and supplier declarations referencing ASTM E 3022.
Bidders must determine applicable GST; GST reimbursement will be as per actuals or lower rate; invoices must be raised with consignee GSTIN; GST portal payment screenshot is required during invoicing.
Scope is strictly supply of goods; there is no installation work mentioned. Delivery timelines are linked to the original order and may extend per the option clause, with minimum 30 days extension rules.
Submit PAN, GSTIN, cancelled cheque, and EFT Mandate; ensure GST invoice requirements are met; ensure lamp specification aligns with ASTM E 3022 and files uploaded to GeM portal are complete.
Sign up now to access all documents
Main Document
OTHER
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS