Hooghly Cochin Shipyard Limited Power Generation & Distribution System Tender Howrah West Bengal 2026

Bid Publish Date

05-May-2026, 6:32 pm

Bid End Date

23-Jul-2026, 3:00 pm

Generate Docs

Progress

Issue05-May-2026, 6:32 pm
Corrigendum18-Jul-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Categories 6

Tender Overview

Organization: Hooghly Cochin Shipyard Limited (Hcsl) in Howrah, West Bengal, invites bids for a complete design, manufacturing, supply & commissioning package of a Power Generation and Distribution system. The scope is a consolidated procurement package for a turnkey installation in the vendor’s frame, with no BOQ quantity disclosed. The buyer reserves option-based quantity adjustments up to 25% during contract execution, at contracted rates. The delivery timeline will adapt to the extended window from the original delivery order, with minimum time considerations and potential extensions as defined in the option clause. The tender emphasizes a single integrated system build rather than individual sub-items. The opportunity requires bidders to align with the purchaser’s option-quantity and delivery mechanics to ensure schedule alignment and cost control.

Key Specifications

    • Product/service: Power Generation and Distribution system design, manufacture, supply & commissioning
    • Quantity: Not specified (25% variation allowed)
    • Estimated value: Not disclosed
    • Experience required: Not specified
    • Standards: Not disclosed in current data
    • Delivery: Based on option clause with minimum 30 days extra

Terms & Conditions

  • Option clause allows ±25% quantity changes; extended delivery may apply

  • Delivery starts from last date of original order; minimum 30 days for extensions

  • EMD, payment terms, and specific documents are not defined in provided data

Important Clauses

Payment Terms

Not specified in tender data; bidders should await detailed ATC guidance.

Delivery Schedule

Delivery period linked to original delivery order; extended period calculation formula with minimum 30 days.

Penalties/Liquidated Damages

No LD details available in data; refer to ATC for any LD or performance bonds.

Bidder Eligibility

  • Experience in design and commissioning of power generation and distribution systems

  • Financial capability to handle turnkey package projects

  • Capability to manage option-based quantity variations (up to 25%)

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Design, Manufacturing, Supply &Commissioning of Power Generation and Distribution system as a Package

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9288965.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for power generation and distribution projects

4

Financial statements / turnover details

5

EMD submission details (amount not specified in data) and security deposit if required

6

Technical bid documents (design proposals, schematics)

7

OEM authorizations (if applicable)

Corrigendum Updates

15 Updates
#1

Update

18-Jul-2026

Extended Deadline

23-Jul-2026, 3:00 pm

Opening Date

23-Jul-2026, 3:30 pm

#2

Update

15-Jul-2026

Extended Deadline

18-Jul-2026, 3:00 pm

Opening Date

18-Jul-2026, 3:30 pm

#3

Update

13-Jul-2026

Extended Deadline

15-Jul-2026, 3:00 pm

Opening Date

15-Jul-2026, 3:30 pm

#4

Update

08-Jul-2026

Extended Deadline

13-Jul-2026, 3:00 pm

Opening Date

13-Jul-2026, 3:30 pm

#5

Update

30-Jun-2026
#6

Update

30-Jun-2026

Extended Deadline

08-Jul-2026, 3:00 pm

Opening Date

08-Jul-2026, 3:30 pm

#7

Update

25-Jun-2026
#8

Update

25-Jun-2026

Extended Deadline

03-Jul-2026, 3:00 pm

Opening Date

03-Jul-2026, 3:30 pm

#9

Update

19-Jun-2026

Extended Deadline

26-Jun-2026, 3:00 pm

Opening Date

26-Jun-2026, 3:30 pm

#10

Update

12-Jun-2026

Extended Deadline

19-Jun-2026, 3:00 pm

Opening Date

19-Jun-2026, 3:30 pm

#11

Update

04-Jun-2026

Extended Deadline

12-Jun-2026, 3:00 pm

Opening Date

12-Jun-2026, 3:30 pm

#12

Update

01-Jun-2026

Extended Deadline

04-Jun-2026, 3:00 pm

Opening Date

04-Jun-2026, 3:30 pm

#13

Update

29-May-2026

Extended Deadline

01-Jun-2026, 3:00 pm

Opening Date

01-Jun-2026, 3:30 pm

#14

Update

22-May-2026

Extended Deadline

29-May-2026, 3:00 pm

Opening Date

29-May-2026, 3:30 pm

#15

Update

15-May-2026

Extended Deadline

22-May-2026, 3:00 pm

Opening Date

22-May-2026, 3:30 pm

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid for power generation distribution system tender in Howrah?

Bidders should review the ATC document, submit required documents (GST, PAN, experience certificates, financials), and prepare a design+manufacture+commissioning proposal. The tender allows up to 25% quantity variation at contracted rates, with delivery extensions; ensure alignment with option clause and submission of OEM authorizations if applicable.

What documents are required for Hcsl power system bid in West Bengal?

Submit GST registration, PAN card, experience certificates for similar turnkey projects, financial statements, EMD details, technical bid documents, and any OEM authorizations. ATC may specify additional items; ensure all documents are current and properly authenticated before submission.

What are the delivery terms for the Howrah power system tender?

Delivery starts from the last date of the original delivery order. If quantity increases, the extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend up to the original delivery period.

What is the scope of the turnkey power system package tender?

The scope covers design, manufacturing, supply and commissioning of a single integrated power generation and distribution system package. No BOQ items are listed; bidders must submit a cohesive system proposal covering all lifecycle stages from design to commissioning.

What are the key eligibility criteria for bidders in this tender?

Eligible bidders should demonstrate experience in designing and implementing power generation and distribution systems, possess adequate financial stability and turnover, and be capable of handling quantity variation up to 25% as per the option clause.

Where can I find the detailed ATC terms for this bid in Howrah?

The Buyer uploaded an ATC document referenced in the tender data. Access the GEM portal’s ATC link to view all additional conditions, including any technical and commercial requirements, warranty expectations, and submission formats.

What are the submission deadlines and how to prepare the bid?

No definitive dates are provided here. bidders must monitor GEM portal for ATC updates, prepare documents (GST, PAN, experience, financials), and ensure compliance with the option-clause delivery mechanics and potential quantity adjustments during contract placement.

Are there any brand or OEM restrictions for the power system tender?

The tender data does not specify brand or OEM constraints. Review ATC for any required OEM authorizations or brand-specific clauses; otherwise propose compliant, interoperable designs meeting system requirements and integration needs.