TenderDekho Logo
Closed GEM

Tender Notice for SPARE 1,SPARE 2,SPARE 3,SPARE 4,SPARE 5,SPARE 6,SPARE 7,SPARE 8,SPARE 9,SPARE 10,SPARE 11,SPARE 12, in SONBHADRA, UTTAR PRADESH

Bid Publish Date

19-Aug-2026, 1:54 am

Bid End Date

31-Aug-2026, 11:00 am

EMD

₹6,000

Value

₹5,02,110

Progress

Issue19-Aug-2026, 1:54 am
AwardPending

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow announces a tender for SPARE 1, SPARE 2, SPARE 3, SPARE 4, SPARE 5, SPARE 6, SPARE 7, SPARE 8, SPARE 9, SPARE 10, SPARE 11, SPARE 12, SPARE 13, SPARE 14, SPARE 15, SPARE 16, SPARE 17, SPARE 18, SPARE 19, SPARE 20, SPARE 21, SPARE 22, SPARE 23, SPARE 24, SPARE 25, SPARE 26, SPARE 27, SPARE 28, SPARE 29, SPARE 30, SPARE 31, SPARE 32 in SONBHADRA, UTTAR PRADESH. Quantity: 1125. Submission Deadline: 31-08-2026 11: 00: 00. Last date to apply is approaching fast!

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1125

Category

SPARE 1

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SPARE 1 , SPARE 2 , SPARE 3 , SPARE 4 , SPARE 5 , SPARE 6 , SPARE 7 , SPARE 8 , SPARE 9 , SPARE 10 , SPARE 11 , SPARE 12 , SPARE 13 , SPARE 14 , SPARE 15 , SPARE 16 , SPARE 17 , SPARE 18 , SPARE 19 , SPARE 20 , SPARE 21 , SPARE 22 , SPARE 23 , SPARE 24 , SPARE 25 , SPARE 26 , SPARE 27 , SPARE 28 , SPARE 29 , SPARE 30 , SPARE 31 , SPARE 32

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

20

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231225

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
ADALAT VERMA231225,DTPS, Anpara Thermal Power PlantSonbhadraUttar Pradesh2312252090-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9774368.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 32 Items Sign in for GEM prices

#1

SPARE 1

SS Fitting 1/2inch M NPT by 1/4inch M NPT connector

20 pieces Delivery: 90 days
#2

SPARE 2

SS Fitting 1/4inch M NPT by 1/8inch M NPT connector

20 pieces Delivery: 90 days
#3

SPARE 3

SS Fitting 1/2inch F NPT by 1/4inch OLIVE connector

20 pieces Delivery: 90 days
#4

SPARE 4

SS Fitting 1/2inch F NPT by 1/4inch M NPT connector

20 pieces Delivery: 90 days
#5

SPARE 5

SS Fitting 1/2inch F NPT by 1/2inch M NPT connector

20 pieces Delivery: 90 days
#6

SPARE 6

Various Tube Fittings 1/2inch NPT (M) X 6 mm SS ferrule

20 pieces Delivery: 90 days
#7

SPARE 7

Various Tube Fittings 1/2inch NPT (M) X 6 mm SS ferrule

20 pieces Delivery: 90 days
#8

SPARE 8

SS Fitting 1/2inch M NPT by 1/4inch F NPT connector

20 pieces Delivery: 90 days
#9

SPARE 9

SS Fitting 1/4inch M by 1/4inch OLIVE Straight connector

30 pieces Delivery: 90 days
#10

SPARE 10

Various Tube Fittings 1/2inch NPT (M) X 6 mm SS ferrule

20 pieces Delivery: 90 days
#11

SPARE 11

SS Fitting 1/2inch M NPT by 1/2inch F BSPT connector

30 pieces Delivery: 90 days
#12

SPARE 12

SS Fitting 1/2inch M BSPT by 1/2inch F NPT connector

20 pieces Delivery: 90 days
#13

SPARE 13

SS Fitting 1/4inch M NPT by 1/4inch OLIVE connector

30 pieces Delivery: 90 days
#14

SPARE 14

Nipple 1/2inch by 1/2inch NPT (Total Length-150 mm with thread on both sides)

25 pieces Delivery: 90 days
#15

SPARE 15

SS Fitting 1/2inch NPT (M) by 1/4inch OLIVE connector

100 pieces Delivery: 90 days
#16

SPARE 16

1/2inch OLIVE Equal Tee (SS)

20 pieces Delivery: 90 days
#17

SPARE 17

1/4 inch OLIVE Equal Tee (SS)

30 pieces Delivery: 90 days
#18

SPARE 18

1/4inch to 8mm OLIVE Straight Connector

30 pieces Delivery: 90 days
#19

SPARE 19

Cable Gland 1/2inch NPT (Double Compress)

200 pieces Delivery: 90 days
#20

SPARE 20

Copper Washer (OD-18.3mm, ID-6.8 mm, Thickness-2mm)

300 pieces Delivery: 90 days
#21

SPARE 21

Various Tube Fittings 1/2inch NPT (M) X 6 mm SS ferrule

20 pieces Delivery: 90 days
#22

SPARE 22

6mm OLIVE to 8mm OLIVE connector with ferrule and nut

10 pieces Delivery: 90 days
#23

SPARE 23

6mm OLIVE to 10mm OLIVE connector with ferrule and nut

10 pieces Delivery: 90 days
#24

SPARE 24

6mm OLIVE to 12mm OLIVE connector with ferrule and nut

10 pieces Delivery: 90 days
#25

SPARE 25

1 INCH M NPT X 1/2 INCH F CONNECTOR

10 pieces Delivery: 90 days
#26

SPARE 26

1 INCH M NPT X 3/4 INCH F CONNECTOR

10 pieces Delivery: 90 days
#27

SPARE 27

3/4 INCH M NPT X 1/2 INCH M CONNECTOR

10 pieces Delivery: 90 days
#28

SPARE 28

1/2 INCH M NPT X 1/2 INCH BSP M CONNECTOR

10 pieces Delivery: 90 days
#29

SPARE 29

1/2 INCH M NPT X 1/2 INCH M NPT CONNECTOR

10 pieces Delivery: 90 days
#30

SPARE 30

3/4 INCH M NPT X 3/4 INCH M NPT CONNECTOR

10 pieces Delivery: 90 days
#31

SPARE 31

3/4 INCH M NPT X 1/2 INCH M NPT CONNECTOR

10 pieces Delivery: 90 days
#32

SPARE 32

1/8 INCH M NPT X 1/4 INCH F NPT CONNECTOR

10 pieces Delivery: 90 days

Categories 13

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer