Bid Publish Date
19-Jul-2026, 11:27 am
Bid End Date
01-Aug-2026, 9:00 am
Location
Progress
Quantity
25
Category
Title1
Bid Type
Single Packet Bid
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow seeks a procurement tender for electrical equipment (title-related categories unspecified). The BOQ lists 10 items, with no itemized quantities or unit measures disclosed. The start and end dates are not published, and the estimated value and EMD are not specified. A key differentiator is the contract’s option clause allowing a ±25% quantity variation, with blended delivery timelines calculated from the original delivery period. This creates potential scale-up or scale-down opportunities during contract execution, at contracted rates. The procurement is positioned under Uttar Pradesh Energy Department’s oversight, but explicit product names or standards are not provided in the available data.
Product/service names: Not specified
Quantities: 10 items, N/A quantities in BOQ
Estimated value: Not disclosed
Experience: Prior experience in electrical equipment procurement recommended
Standards/certifications: Not specified in data
Delivery: Options clause up to 25% variation; minimum 30 days for added time
EMD amount not disclosed in tender data
Quantity variation up to 25% during contract
Delivery period tied to original order date with calculation method
BOQ items listed as N/A; no explicit technical specs provided
Purchaser may increase or decrease the quantity by up to 25% at the time of contract placement and during the contract currency at the contracted rates.
Additional delivery time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Purchaser may extend calculated delivery duration up to the original delivery period when exercising the option clause.
Proven track record in supplying electrical equipment procurement
Compliance with option-quantity and delivery-time clauses
Ability to submit required bidder documents (GST, PAN, financials, experience)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
18
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Aligarh
Delivery Pincodes
202127
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Bijai Kumar Tiwari | 202127,Harduaganj Thermal Power Plant, P.O. Kasimpur | Aligarh | Uttar Pradesh | 202127 | 2 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Title1
SOLENOID VALVE Part Number 1089 0590 21 Make Atlas Copco Model NO ZR275
Title2
SOLENOID VALVE Part Number 1089 0428 14 Make Atlas Copco S ZR145 8 6 50 160KW IE3MOTOR HSN 84818050
Title3
SOLENOID VALVE Part Number 1089 0640 64 Make Atlas Copco Model NO ZR275
Title4
VALVE Part Number 1089 9439 16 Make Atlas Copco Model NO ZR275 SOV
Title5
VALVE Part Number 1089 9439 18 Make Atlas Copco Model NO ZR275 SOV
Title6
TEMPERATURE SENSOR Part Number 1089 0574 70 Make Atlas Copco Model NO ZR275
Title7
PRESSURE SENSOR Part Number 1089 9625 12 Make Atlas Copco Model NO ZR275
Title8
PRESSURE SENSOR Part Number 1089 9625 16 Make Atlas Copco Model NO ZR275
Title9
PRESSURE SENSOR Part Number 1089 9625 18 Make Atlas Copco Model NO ZR275
Title10
LEVEL SENSOR Part Number 1089 0659 57 Make Atlas Copco Model NO ZR275
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | SOLENOID VALVE Part Number 1089 0590 21 Make Atlas Copco Model NO ZR275 | 2 | pieces | con2.uprvunl.lko | 60 | |
| 2 | Title2 | SOLENOID VALVE Part Number 1089 0428 14 Make Atlas Copco S ZR145 8 6 50 160KW IE3MOTOR HSN 84818050 | 3 | pieces | con2.uprvunl.lko | 60 | |
| 3 | Title3 | SOLENOID VALVE Part Number 1089 0640 64 Make Atlas Copco Model NO ZR275 | 3 | pieces | con2.uprvunl.lko | 60 | |
| 4 | Title4 | VALVE Part Number 1089 9439 16 Make Atlas Copco Model NO ZR275 SOV | 3 | piece | con2.uprvunl.lko | 60 | |
| 5 | Title5 | VALVE Part Number 1089 9439 18 Make Atlas Copco Model NO ZR275 SOV | 3 | pieces | con2.uprvunl.lko | 60 | |
| 6 | Title6 | TEMPERATURE SENSOR Part Number 1089 0574 70 Make Atlas Copco Model NO ZR275 | 3 | pieces | con2.uprvunl.lko | 60 | |
| 7 | Title7 | PRESSURE SENSOR Part Number 1089 9625 12 Make Atlas Copco Model NO ZR275 | 2 | pieces | con2.uprvunl.lko | 60 | |
| 8 | Title8 | PRESSURE SENSOR Part Number 1089 9625 16 Make Atlas Copco Model NO ZR275 | 2 | pieces | con2.uprvunl.lko | 60 | |
| 9 | Title9 | PRESSURE SENSOR Part Number 1089 9625 18 Make Atlas Copco Model NO ZR275 | 2 | pieces | con2.uprvunl.lko | 60 | |
| 10 | Title10 | LEVEL SENSOR Part Number 1089 0659 57 Make Atlas Copco Model NO ZR275 | 2 | pieces | con2.uprvunl.lko | 60 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar electrical equipment procurement
Financial statements (audited, if available)
EMD/Security deposit document (amount not disclosed in data)
Technical bid documents (format not specified in data)
OEM authorization or distributor certificates (if applicable)
Bidders should prepare GST registration, PAN, experience certificates, and financial statements, then submit the technical bid along with OEM authorizations if applicable. The tender allows a 25% quantity variation and requires adherence to the delivery-time calculation method. Ensure compliance with the organization’s instruction to accept quantity changes.
Required documents include GST certificate, PAN, experience certificates for electrical equipment procurement, financial statements, EMD/security deposit details, and technical bid documents. OEM authorizations or distributor certificates may be needed depending on the item and supplier profile.
Delivery terms permit a 25% quantity variation at contract and during the currency. Additional delivery time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum 30 days. Extensions can be limited to the original delivery period.
No specific technical specifications are disclosed in the current tender data. Ensure readiness to align with any future itemized specifications or standards requested by uprvunl during bid submission and contract execution.
The tender data does not disclose the EMD amount. Bidders should monitor the official tender portal for exact EMD requirements, or contact the procurement office for clarity before submission.
The BOQ lists 10 items, but all items are shown as N/A in quantity and unit, indicating placeholders. Bidders should await itemized specifications or request clarification on item details before bidding.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS