Fan Belt,Hand Brake Cable,Suspension Bush Kit,Front RH Wheel Bearing,Coil Spring,Hose Pipe to Radia
Indian Army
BARAMULLA, JAMMU & KASHMIR
Bid Publish Date
14-Jun-2025, 6:52 pm
Bid End Date
31-Jul-2025, 9:00 am
Location
Progress
Quantity
35
Category
ECM Assembly
Bid Type
Two Packet Bid
Indian Army announces a tender for ECM Assembly, Fuel Tank Cap, Suspension Bush Kit, Joint Assembly Universal, Accelerator Cable, IAC Motor, Road Spring, Wind Shield BP Glass, Joint Assembly Universal MPVY, Coolant D1 Pipe, Coolant D2 Pipe, Radiator Hose Pipe Inlet, Radiator Hose Pipe outlet, Head light Assembly, Turbo Charger Hose Pipe S Type, Turbo Charger Hose Pipe L Type, Rear Wheel Hub Bearing, Fuel Pipe Rotary Pump to Tank, Tappet Cover Gasket, Front Brake Shoe Pad, Air Filter element, Fuel Filter 3 Union type, Oil filter, Wiper Blade Front, Wiper Blade Rear in PULWAMA, JAMMU & KASHMIR. Quantity: 35. Submission Deadline: 31-07-2025 09: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
BUDGAM, JAMMU & KASHMIR
Indian Army
POONCH, JAMMU & KASHMIR
Indian Army
BATHINDA, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | ECM Assembly | As per specification ser No 1 | 1 | nos | sachinthomas | 30 |
| 2 | Fuel Tank Cap | As per specification ser No 2 | 2 | nos | sachinthomas | 30 |
| 3 | Suspension Bush Kit | As per specification ser No 3 | 1 | set | sachinthomas | 30 |
| 4 | Joint Assembly Universal | As per specification ser No 4 | 2 | nos | sachinthomas | 30 |
| 5 | Accelerator Cable | As per specification ser No 5 | 2 | nos | sachinthomas | 30 |
| 6 | IAC Motor | As per specification ser No 6 | 1 | nos | sachinthomas | 30 |
| 7 | Road Spring | As per specification ser No 7 | 1 | nos | sachinthomas | 30 |
| 8 | Wind Shield BP Glass | As per specification ser No 8 | 1 | nos | sachinthomas | 30 |
| 9 | Joint Assembly Universal MPVY | As per specification ser No 9 | 2 | nos | sachinthomas | 30 |
| 10 | Coolant D1 Pipe | As per specification ser No 10 | 2 | nos | sachinthomas | 30 |
| 11 | Coolant D2 Pipe | As per specification ser No 11 | 2 | nos | sachinthomas | 30 |
| 12 | Radiator Hose Pipe Inlet | As per specification ser No 12 | 2 | nos | sachinthomas | 30 |
| 13 | Radiator Hose Pipe outlet | As per specification ser No 13 | 1 | nos | sachinthomas | 30 |
| 14 | Head light Assembly | As per specification ser No 14 | 2 | nos | sachinthomas | 30 |
| 15 | Turbo Charger Hose Pipe S Type | As per specification ser No 15 | 1 | nos | sachinthomas | 30 |
| 16 | Turbo Charger Hose Pipe L Type | As per specification ser No 16 | 1 | nos | sachinthomas | 30 |
| 17 | Rear Wheel Hub Bearing | As per specification ser No 17 | 2 | nos | sachinthomas | 30 |
| 18 | Fuel Pipe Rotary Pump to Tank | As per specification ser No 18 | 1 | nos | sachinthomas | 30 |
| 19 | Tappet Cover Gasket | As per specification ser No 19 | 2 | nos | sachinthomas | 30 |
| 20 | Front Brake Shoe Pad | As per specification ser No 20 | 1 | set | sachinthomas | 30 |
| 21 | Air Filter element | As per specification ser No 21 | 1 | nos | sachinthomas | 30 |
| 22 | Fuel Filter 3 Union type | As per specification ser No 22 | 1 | nos | sachinthomas | 30 |
| 23 | Oil filter | As per specification ser No 23 | 1 | nos | sachinthomas | 30 |
| 24 | Wiper Blade Front | As per specification ser No 24 | 1 | set | sachinthomas | 30 |
| 25 | Wiper Blade Rear | As per specification ser No 25 | 1 | nos | sachinthomas | 30 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
31-Jul-2025, 9:00 am
Opening Date
31-Jul-2025, 9:30 am
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | D Q ENTERPRISES Under PMA | - | 29-07-2025 09:26:49 | Qualified |
| 2 | JALAL ENTERPRISES Under PMA | - | 30-07-2025 16:26:23 | Qualified |
| 3 | YAMIN ENTERPRISES Under PMA | - | 28-07-2025 18:39:23 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | JALAL ENTERPRISES(MSE)( MSE Social Category:General ) Under PMA | ₹1,16,566 | Item Categories : ECM Assembly,Fuel Tank Cap,Suspension Bush Kit,Joint Assembly Universal,Accelerator Cable,IAC Motor |
| L2 | YAMIN ENTERPRISES (MSE)( MSE Social Category:General ) Under PMA | ₹1,29,875 | Item Categories : ECM Assembly,Fuel Tank Cap,Suspension Bush Kit,Joint Assembly Universal,Accelerator Cable,IAC Motor |
| L3 | D Q ENTERPRISES (MSE)( MSE Social Category:General ) Under PMA | ₹1,31,730 | Item Categories : ECM Assembly,Fuel Tank Cap,Suspension Bush Kit,Joint Assembly Universal,Accelerator Cable,IAC Motor |
Key insights about JAMMU AND KASHMIR tender market
The eligibility requirements include being a registered entity capable of supplying the listed vehicle parts. Vendors should demonstrate relevant experience, sound financial stability, and compliance with regulations as required by the Ministry of Defence. Adequate documentation affirming these qualifications must be provided with the bid.
Bidders must submit necessary documents endorsing the compliance with technical specifications, including quality control certifications and product safety standards. All certifications submitted should be current and valid, reflecting the capability to supply components that adhere to military and industry regulations.
The registration process involves completing the official registration forms as outlined in the tender documentation. Suppliers must compile all required documentation, including proof of registration as an entity, before submission. We recommend following any specific instructions provided in the tender to ensure compliance with the registration process.
Payment terms generally stipulate that payments will be released upon successful delivery and inspection of the components as specified in the contract. Successful bidders are encouraged to review the payment schedule outlined in the tender documents to ensure alignment with their financial protocols.
Yes, MSEs can benefit from streamlined evaluation processes and support in registration. The tender encourages compliance with 'Make in India' policies, allowing MSEs to capture opportunities by offering competitive pricing and local content, thereby fostering greater participation in government contracts.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS