Bid Publish Date
31-Aug-2026, 7:23 pm
Bid End Date
10-Sep-2026, 8:00 pm
Location
Progress
The Indian Army, Department Of Military Affairs, invites bids for an AUTOMATIC LPG CYLINDER HOT AIR CAP SEAL SEALING MACHINE WITH INTEGRATED CONVEYOR SYSTEM located in VARANASI, UTTAR PRADESH. Bid scope centers on a complete sealing solution capable of hot air cap sealing for LPG cylinders with an integrated conveyer. The procurement includes an option to increase quantity by 25% at contracted rates and a delivery timeline tied to approval of Detailed Design Drawings. Bidders must align with GST obligations defined by the buyer and establish a functional service center in the consignee state within 30 days of award if not already present. The contract allows modification cycles based on buyer-approved drawings, with delays in drawing approvals extending the delivery period without LD. Unique requirements include mandatory design drawing submissions within 5 days of award and 21 days for modification lists.
Product/service: AUTOMATIC LPG CYLINDER HOT AIR CAP SEAL SEALING MACHINE WITH INTEGRATED CONVEYOR SYSTEM
Delivery terms: Drawing approval within 5 days; modification list within 21 days; delivery period adjusted for drawing approval delays
Quantity flexibility: Up to 25% increase during contract; extended delivery period proportionally calculated with minimum 30 days
Service requirement: Functional Service Centre in consignee state within 30 days; evidence required for payments
Delivery is contingent on timely Detailed Design Drawings approval with 5-day submission window
Quantity may be increased by 25% with rates held; delivery period recalculated accordingly
GST and financial documentation required; service center in consignee state within 30 days
GST compliance per actuals or applicable rates; payment release after service capability evidence
Delivery period linked to drawings approval; delays in drawings extend delivery without LD
LD terms are tied to delivery delays and drawing approvals; explicit LD rate not provided
No liquidation, court receivership, or bankruptcy proceedings
Must upload undertaking confirming financial standing
GST registration and GST compliance required
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
22
Past Performance
10 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
AUTOMATIC LPG CYLINDER HOT AIR CAP SEALING MACHINE WITH INTEGRATED CONVEYOR SYSTEM
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
VARANASI
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | VARANASI | VARANASI | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
GST registration compliance documents
Experience certificates (if any) and financial statements
OEM authorizations (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, EFT mandate, and GST compliance documents. Submit Detailed Design Drawings within 5 days of award, with modification list within 21 days. Ensure service center capability in the state within 30 days and be ready for a 25% quantity option at contracted rates.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, GST proof, and any OEM authorizations if applicable. Include financial statements and prior experience certificates if available. Ensure non-liability declarations to avoid disqualification for liquidation or bankruptcy proceedings.
Delivery period extends automatically based on (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If original period is under 30 days, extension equals the original period; no LD applies during buyer delays in drawing approvals.
GST is to be paid as per actuals or applicable rates, whichever is lower, up to quoted GST. Payment release requires documentary evidence of service capability in the consignee state and GST compliance throughout the contract.
The purchaser may increase or decrease the bid quantity by up to 25% at the time of contract placement and during the currency of the contract at contracted rates, affecting delivery timelines accordingly.
If not already present, a functional service center must be established within 30 days of award. Payment will be released only after documentary evidence showing service capability is submitted.