TenderDekho Logo
Active GEM

Indian Army Varansi Uttar Pradesh LPG Cylinder Sealing Machine Tender 2026 ISI/AAA TRTL Standards

Bid Publish Date

31-Aug-2026, 7:23 pm

Bid End Date

10-Sep-2026, 8:00 pm

Progress

Issue31-Aug-2026, 7:23 pm
AwardPending

Key Highlights

  • Technical standards/quality controls: No explicit standards listed; look for IS/ISO in subsequent ATC
  • Brand/OEM requirements: Not specified in data
  • Delivery/extension: 25% quantity option, delivery extension rules with minimum 30 days
  • Warranty/AMC: Not specified; service center requirement implies post-sale support

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for an AUTOMATIC LPG CYLINDER HOT AIR CAP SEAL SEALING MACHINE WITH INTEGRATED CONVEYOR SYSTEM located in VARANASI, UTTAR PRADESH. Bid scope centers on a complete sealing solution capable of hot air cap sealing for LPG cylinders with an integrated conveyer. The procurement includes an option to increase quantity by 25% at contracted rates and a delivery timeline tied to approval of Detailed Design Drawings. Bidders must align with GST obligations defined by the buyer and establish a functional service center in the consignee state within 30 days of award if not already present. The contract allows modification cycles based on buyer-approved drawings, with delays in drawing approvals extending the delivery period without LD. Unique requirements include mandatory design drawing submissions within 5 days of award and 21 days for modification lists.

  • Organization: Indian Army / Department Of Military Affairs
  • Location: VARANASI, UTTAR PRADESH
  • Product/Category: AUTOMATIC LPG CYLINDER HOT AIR CAP SEAL SEALING MACHINE WITH INTEGRATED CONVEYOR SYSTEM
  • Estimated Value/EMD: Not specified
  • Key differentiator: 25% quantity option; mandatory Detailed Design Drawings approval process; service center within 30 days

Technical Specifications & Requirements

  • No explicit technical specifications provided in the tender data. However, the BOQ indicates a single integrated machine with an automated hot-air cap sealing function and an integrated conveyor system. The buyer mandates approval of Detailed Design Drawings within 5 days of award, followed by modification lists within 21 days if required.
  • Delivery terms hinge on acceptance of drawings; if buyer delays, the delivery period is re-fixed with no LD for the delay.
  • Serviceability requirement includes establishing a functional service center in the state of the consignee within 30 days of award if not already present, with evidence of operation required for payment release.

Terms, Conditions & Eligibility

  • EMD not specified in the tender data; bidders must prepare for standard government EMD as per DAR terms although explicit amount is not listed.
  • Option clause allows quantity adjustments up to 25% during and after contract; delivery time scales with the formula provided, minimum 30 days.
  • Required documents for vendor code creation include PAN, GSTIN, cancelled cheque, and EFT mandate; GST compliance as per applicable rates.
  • Qualification requires a non-liquidation/ bankruptcy status; bidders must upload an undertaking.
  • Service center requirement: establish within 30 days if not present; payment contingent on submission of evidence of service capability.

Key Specifications

  • Product/service: AUTOMATIC LPG CYLINDER HOT AIR CAP SEAL SEALING MACHINE WITH INTEGRATED CONVEYOR SYSTEM

  • Delivery terms: Drawing approval within 5 days; modification list within 21 days; delivery period adjusted for drawing approval delays

  • Quantity flexibility: Up to 25% increase during contract; extended delivery period proportionally calculated with minimum 30 days

  • Service requirement: Functional Service Centre in consignee state within 30 days; evidence required for payments

Terms & Conditions

  • Delivery is contingent on timely Detailed Design Drawings approval with 5-day submission window

  • Quantity may be increased by 25% with rates held; delivery period recalculated accordingly

  • GST and financial documentation required; service center in consignee state within 30 days

Important Clauses

Payment Terms

GST compliance per actuals or applicable rates; payment release after service capability evidence

Delivery Schedule

Delivery period linked to drawings approval; delays in drawings extend delivery without LD

Penalties/Liquidated Damages

LD terms are tied to delivery delays and drawing approvals; explicit LD rate not provided

Bidder Eligibility

  • No liquidation, court receivership, or bankruptcy proceedings

  • Must upload undertaking confirming financial standing

  • GST registration and GST compliance required

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

22

Past Performance

10 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

AUTOMATIC LPG CYLINDER HOT AIR CAP SEALING MACHINE WITH INTEGRATED CONVEYOR SYSTEM

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

VARANASI

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-VARANASIVARANASI--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9822322.pdf

Main Document

Buyer uploaded ATC document

ATC

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 16

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

GST registration compliance documents

6

Experience certificates (if any) and financial statements

7

OEM authorizations (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the LPG sealing machine tender in Varanasi

Bidders should prepare PAN, GSTIN, cancelled cheque, EFT mandate, and GST compliance documents. Submit Detailed Design Drawings within 5 days of award, with modification list within 21 days. Ensure service center capability in the state within 30 days and be ready for a 25% quantity option at contracted rates.

What documents are required for bidder registration in this tender

Submit PAN, GSTIN, cancelled cheque, EFT mandate, GST proof, and any OEM authorizations if applicable. Include financial statements and prior experience certificates if available. Ensure non-liability declarations to avoid disqualification for liquidation or bankruptcy proceedings.

What is the delivery extension rule if drawings are delayed

Delivery period extends automatically based on (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If original period is under 30 days, extension equals the original period; no LD applies during buyer delays in drawing approvals.

What are the GST requirements and payment terms

GST is to be paid as per actuals or applicable rates, whichever is lower, up to quoted GST. Payment release requires documentary evidence of service capability in the consignee state and GST compliance throughout the contract.

What is the scope of quantity adjustment in the contract

The purchaser may increase or decrease the bid quantity by up to 25% at the time of contract placement and during the currency of the contract at contracted rates, affecting delivery timelines accordingly.

When must the service center be established in the state

If not already present, a functional service center must be established within 30 days of award. Payment will be released only after documentary evidence showing service capability is submitted.