Bid Publish Date
14-Nov-2026, 12:14 pm
Bid End Date
24-Nov-2026, 1:00 pm
Progress
Indian Army seeks procurement of multiple automotive assemblies including Tail Light Assembly (TaiL Light Assy), Door Bidding, Wiper Assembly (Wiper Assy), Door Hinge, Head Light Assembly (Head light Assy), and refurbishment of Rear Door, along with Crown Wheel Pinion and Front Wind Screen BP. Scope covers supply, installation, testing, commissioning, and operator training, with statutory clearances if required. The bid includes 8 items in the BOQ and emphasizes flexible quantity management up to 25% plus extensions while maintaining contracted rates. Key differentiator is the approval of Detailed Design Drawings within 21 days post-award, else revised delivery timelines apply. Delivery expectations hinge on approved drawings and option clause mechanics.
Product categories: Tail Light Assembly, Door Assembly, Wiper Assembly, Door Hinge, Head Light Assembly, Rear Door refurbishment, Crown Wheel Pinion, Front Wind Screen BP
Estimated value: Not specified
Delivery: Based on approved drawings; option to extend delivery up to original period; minimum extension 30 days
Quality/inspection: Pre-dispatch inspection at seller premises; external lab testing fees borne by Buyer
Drawings: Detailed Design Drawings approved within 21 days of award; modification list provided within 21 days if required
Option Clause allows ±25% quantity variation at contract award and during currency
Detailed Design Drawings must be approved within 21 days post-award
Pre-dispatch inspection required with Buyer or external agency; external testing costs borne by Buyer
Delivery period adjustments apply if drawing approvals are delayed; no LD for buyer delays in drawing approvals
Delivery periods linked to last date of original delivery order; additional time calculation based on (increased quantity / original quantity) × original delivery period, minimum 30 days
Not explicitly stated; delivery extensions permitted with option clause; LD terms not detailed
Experience in supplying automotive assemblies for military or government sectors
Financial stability evidenced by 2-3 years of financial statements
Ability to provide OEM authorizations and service/support lines
Quantity
14
Category
TaiL Light Assy
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
5 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TaiL Light Assy , Door Bidding , Wiper Assy , Door Hinge , Head light Assy , Refurbishment of Rear Door , Crown Wheel Pinion , Front Wind Screen BP
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
GANDERBAL
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | GANDERBAL | GANDERBAL | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
TaiL Light Assy
TaiL Light Assy for Veh
Door Bidding
Door Bidding for Veh
Wiper Assy
Wiper Assy for Veh
Door Hinge
Door Hinge for Veh
Head light Assy
Head light Assy for Veh
Refurbishment of Rear Door
Refurbishment of Rear Door for Veh
Crown Wheel Pinion
Crown Wheel Pinion for Veh
Front Wind Screen BP
Front Wind Screen BP for Veh
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | TaiL Light Assy | TaiL Light Assy for Veh | 1 | pieces | 2ic_24rr | 15 | |
| 2 | Door Bidding | Door Bidding for Veh | 1 | pieces | 2ic_24rr | 15 | |
| 3 | Wiper Assy | Wiper Assy for Veh | 1 | pieces | 2ic_24rr | 15 | |
| 4 | Door Hinge | Door Hinge for Veh | 6 | pieces | 2ic_24rr | 15 | |
| 5 | Head light Assy | Head light Assy for Veh | 2 | pieces | 2ic_24rr | 15 | |
| 6 | Refurbishment of Rear Door | Refurbishment of Rear Door for Veh | 1 | pieces | 2ic_24rr | 15 | |
| 7 | Crown Wheel Pinion | Crown Wheel Pinion for Veh | 1 | pieces | 2ic_24rr | 15 | |
| 8 | Front Wind Screen BP | Front Wind Screen BP for Veh | 1 | pieces | 2ic_24rr | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar automotive assembly supply
Financial statements (last 2-3 years)
EMD/Security deposit documents (if required by buyer)
Technical bid documents
OEM authorization certificates (if applicable)
Any statutory clearances or QC/test reports (if available)
Bidders must submit GST, PAN, and experience certificates, plus financial statements. Ensure OEM authorization if required and provide Technical bid documents. The scope includes supply, installation, testing, commissioning, and operator training with pre-dispatch inspection. Drawing approvals within 21 days of award are mandatory to avoid schedule shifts.
Submit GST certificate, PAN, experience certificates in similar automotive projects, financial statements for last 2-3 years, EMD documents if applicable, technical bid, and OEM authorizations. Include pre-dispatch inspection readiness and any relevant QC reports; ensure drawings are ready for buyer approval within 21 days.
The purchaser may increase or decrease quantity up to 25% at contract placement and during currency. Delivery time extends based on a formula, with a minimum 30-day extension; original delivery period may be preserved in certain cases as per option clause.
Pre-dispatch inspection is mandatory at seller premises; inspection by Buyer or nominated agency; external lab testing costs borne by Buyer; in-house testing facility provided by seller at no extra charge; readiness communicated by seller via email.
Submit Detailed Design Drawings within 21 days of award; Buyer will approve or provide modification list within 21 days; non-approval may trigger delivery timeline adjustments with no LD for Buyer delay.
Bid price must cover supply, installation, testing, commissioning, operator training, and statutory clearances if any; includes post-installation support and warranty/AMC terms as specified by the buyer.
The contract requires dedicated/OEM service support line, with post-installation service arrangements; detailed warranty terms are aligned to buyer specifications and may be part of the final contract and vendor obligations.