GEM

BHEL Bhopal Tools Tender 33 Sets PLW Patiala - 20-Item Tool Sets Annex C 6 Weeks 2026

Bid Publish Date

08-Jan-2026, 9:23 am

Bid End Date

19-Jan-2026, 2:00 pm

Progress

Issue08-Jan-2026, 9:23 am
AwardPending
Explore all 3 tabs to view complete tender details

Quantity

33

Key Highlights

  • Tool sets for PLW with 20 items per set, 33 sets total
  • Annexure C itemization and WO number 54719A74908
  • GST-inclusive bid pricing and GST-inclusive PO value
  • Delivery window: 6 weeks from PO, with early delivery accepted
  • Destination: CRX, BHEL, BHOPAL-462022
  • PQR compliance mandatory; TC/GC submission per Annexure B
  • QAP applicable; Indent-specified product description must be followed
  • Payment terms vary by MSME status: 45/60/90 days
  • Conflict of interest prohibitions; independent supplier selection
  • Inspection per Item Acceptance Plan with formal QA/GC requirements

Tender Overview

BHEL Bhopal invites suppliers to supply 33 sets of essential tools for PLW as per Annexure C and WO 54719A74908. Each set contains 20 items, total quantity 33 sets. Delivery schedule is 6 weeks from PO date, with early delivery welcome and destination at CRX, BHEL, BHOPAL-462022. Price should be GST-inclusive; PO value will be GST-inclusive as per tender terms. Scope specifies “Only supply of Goods” and requires compliance with mandatory PQR/TC/GC processes. This procurement targets qualified tool sets for PLW operations with penalties for non-compliance as per company policies.

Technical Specifications & Requirements

  • Item scope: 33 sets of essential tools for PLW, each set comprising 20 items as per Annexure C.
  • WO reference: 54719A74908; detailed itemization in Annexure C.
  • Delivery: 6 weeks from PO date; early deliveries accepted.
  • Destination: CRX, BHEL, BHOPAL-462022.
  • Pricing: Bid price inclusive of GST; GEM PO price inclusive of GST only.
  • Compliance: Mandatory Technical PQR attached; submit along with offer; QAP applies; vendor must describe product per Indent description; TC and GC required as per Annexure B.
  • Quality & tests: TC/GC submission; Guarantee certificate attached to Annexure B; inspection per Item Acceptance Plan.
  • Conflict of interest: Prohibition of collusion; ensure no competing interest with other bidders.

Terms, Conditions & Eligibility

  • EMD: Amount not disclosed in available data; verify with tender documents.
  • Payment terms: 45 days for Udyam registered MSEs, 60 days for Udyam registered MSs, 90 days for non-MSME suppliers, from material receipt and acceptance.
  • Delivery terms: Destination delivery to BHEL, BHOPAL; six-week delivery window, with approval of acceptance.
  • Documentation: Submit PQR compliance with bid; include TC and GC as per Annexure B; provide product description exactly as Indent.
  • Warranty & QC: Submit guarantee certificates; ensure conformity with QAP; no sample items required for this PO.
  • Conflicts of interest: Bidders must avoid any conflict; disqualification for overlap or subsidies from parties.
  • Inspection: Vendor inspected by BHEL BHOPAL as per Item Acceptance Plan; procurement requires strict adherence to terms.

Key Specifications

  • 33 sets of essential PLW tools

  • Each set contains 20 items as per Annexure C

  • WO reference: 54719A74908

  • Delivery: 6 weeks from PO to CRX, BHEL, BHOPAL-462022

  • GST-inclusive pricing; GST-inclusive PO value

  • Mandatory PQR compliance and QAP

  • TC/GC submissions required

Terms & Conditions

  • GST-inclusive bid price and GST-inclusive PO

  • Delivery within 6 weeks to BHEL Bhopal

  • Mandatory PQR compliance and TC/GC submissions

Important Clauses

Payment Terms

Payments: 45 days for Udyam registered MSEs, 60 days for Udyam registered MSys, 90 days for non-MSME from material receipt and acceptance

Delivery Schedule

Delivery within 6 weeks from Purchase Order date; early delivery encouraged and acceptable

Penalties/Liquidated Damages

Penalties per Company policies for non-compliance; details in NIT/ATC and Item Acceptance Plan

Bidder Eligibility

  • Experience in supplying tool sets or similar 20-item tool kits

  • GST registration and financial stability documentation

  • Compliance with PQR and QAP; submission of TC/GC

  • No declared conflicts of interest with other bidders

Documents 6

GeM-Bidding-8811278.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Wiper Motor Assy, Fuel Filter, Chain & Sprocket Kit Procurement Darjeeling West Bengal 2026

Indian Army

DARJEELING, WEST BENGAL

Posted: 7 January 2026
Closed: 17 January 2026
GEM

self starter,AVR,Exhaust Fan,Piston Ring Set,Head Gasket,Tappet Gasket,Big and Cell

Indian Army

POONCH, JAMMU & KASHMIR

Posted: 7 January 2026
Closed: 17 January 2026
GEM

Repair kit,Piston Ring Set,Piston Assy,AMP Meter,Fuel Filter,Fuel Pipe Line 19 19,Fan Belt,Fuel Pip

Indian Army

MEERUT, UTTAR PRADESH

Posted: 7 January 2026
Closed: 17 January 2026
GEM

Indian Army Procurement Tender for Assy Intercooler, Lock, Pump, Output Flange & Brake Shoe Set in Assam 2026

Indian Army

SONITPUR, ASSAM

Posted: 7 January 2026
Closed: 17 January 2026
GEM

UHF Multi-Protocol Transmitter & Receiver set With Batteries

Indian Army

EAST SIANG, ARUNACHAL PRADESH

Posted: 7 January 2026
Closed: 17 January 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar tool-set supply

4

Financial statements (last 2 years) or equivalent

5

EMD/Security deposit documents (if applicable; confirm amount)

6

Technical bid documents demonstrating PQR compliance

7

OEM authorizations or техничal compliance certificates

8

TC and GC (guarantee certificate) per Annexure B

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid for the PLW tool sets tender in Patiala 2026?

To bid, ensure compliance with Annexure C 20-item tool sets, submit PQR compliance with your offer, provide TC/GC per Annexure B, and price GST-inclusive. Deliver to BHEL BHOPAL within 6 weeks from PO; follow MSME-based payment terms (45/60/90 days). Include OEM authorizations if required.

What documents are required for tender submission in BHEL Bhopal?

Submit GST certificate, PAN card, experience certificates for similar tool sets, two years of financial statements, EMD documents if applicable, technical bid showing PQR compliance, OEM authorizations, and TC/GC as per Annexure B; ensure product description matches indent.

What are the delivery terms for the BHEL tool sets procurement?

Delivery must be completed within 6 weeks from the PO date to CRX, BHEL, BHOPAL-462022. Early delivery is acceptable. Ensure GST-inclusive pricing and readiness to demonstrate QA/inspection per Item Acceptance Plan.

What is the payment schedule for MSME suppliers under this tender?

Udyam registered MSEs are paid in 45 days; Udyam registered MSs in 60 days; non-MSME suppliers in 90 days from material receipt and acceptance, subject to material inspection and document verification.

What standards or QA requirements apply to these tool sets?

Compliance with Technical PQR is mandatory; QAP applies; submit TC and GC per Annexure B; product must be described exactly as Indent; inspection is conducted by BHEL BHOPAL as per the Item Acceptance Plan.

How to verify conflict of interest and eligibility for this BHEL tender?

Bidders must declare no common control or financial subsidies with other bidders; any conflict results in disqualification. Ensure you meet experience criteria, have GST registration, and can demonstrate financial stability.

What is included in Annexure C for the 33 tool sets?

Annexure C itemizes 20 tools per set; exact item list, specifications, and quality requirements are described. Ensure each set aligns with the Indent description and provides QA documentation before submission.

Is early delivery rewarded or required for the 33 tool sets?

While not mandatory, early delivery is accepted and may be favored by procurement for faster material acceptance. Plan logistics to meet the 6-week target and provide real-time delivery progress as needed.

Similar Tenders

5 found

Supply of urological hand instrument set in urology department, RIMS, Ranchi

Rajendra Institute of Medical Sciences

📍 RANCHI, JHARKHAND

EMD: ₹3.0 L
⏰ Deadline: 2 months left
🛒 Type: Goods
View EPROCURE

Design, manufacture, testing, supply and installation/demonstration of 1 Set of Insulated Aerial Work Platform and Insulated Scaffolding System for Live line Maintenance system for Transmission Line and Substations upto 400kV voltage class, Hot line

RRVPN - CMD

📍 JODHPUR, RAJASTHAN

EMD: ₹84.3 L
Est: ₹42.1 Cr
⏰ Deadline: 2 months left
🛒 Type: Works
View EPROCURE

Design, manufacture, testing, supply and installation/demonstration of 1 Set of Insulated Aerial Work Platform and Insulated Scaffolding System for Live line Maintenance system for Transmission Line and Substations upto 400kV voltage class, Hot line

RRVPN - CMD

📍 JAIPUR, RAJASTHAN

EMD: ₹80.2 L
Est: ₹40.1 Cr
⏰ Deadline: 2 months left
🛒 Type: Works
View EPROCURE

Borehole Survey Tools

Geological Survey Of India (gsi)

EMD: ₹8.1 L
⏰ Deadline: 5 weeks left
🛒 Type: Goods
View GEM

Provision of 512Mbps Optical Fiber based Internet Lease Line Bandwidth Services at DC, PSPCL, Patiala

Department of Power

📍 PATIALA, PUNJAB

EMD: ₹10,000
⏰ Deadline: 5 weeks left
🛒 Type: Works
View EPROCURE