Bharat Heavy Electricals Limited (BHEL) invites bids for nickel base alloy powder intended for the thermal spray process and an oxy-acetylene powder delivery system or torch kit, to be executed at Haridwar, Uttarakhand. The procurement involves items within HW7799902507 and HW7799902515 categories, with potential quantity adjustments up to 25% and contract delivery terms linked to the original delivery schedule. The scope appears to target specialized thermal spray tooling and consumables for high-temperature coating processes. The key differentiator is the option clause enabling mid-term quantity variability and a delivery timeframe anchored to the last delivery order date, ensuring project flexibility within regulated procurement. This tender emphasizes equipment compatibility and process-specific material provision under BHEL’s heavy industry context.
EMD amount and exact estimated value are not provided; bidders must verify GEM terms and prepare typical EMD documentation.
Quantity flexibility allows ±25% adjustment during contract execution with delivery timing linked to the last delivery order date.
Delivery extensions are calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Option clause enables ±25% quantity changes during contract and currency; delivery period extensions follow a formula with a 30-day minimum.
Bidders must review and comply with the Buyer Added ATC terms; ATC document is hosted separately.
No BOQ items available in current data; bidders should anticipate item-specific specifications in the final tender.
Experience in supplying nickel-based powders or thermal spray consumables to heavy industry sectors
Ability to meet safety and material handling standards for high-temperature coatings
Capability to deliver within Haridwar, Uttarakhand or near-site supply chain
Quantity
153
Category
HW7799902507 NICKEL BASE ALLOY POWDER FOR THERMAL SPRAY PROCESS
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Group wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HW7799902507 NICKEL BASE ALLOY POWDER FOR THERMAL SPRAY PROCESS , HW7799902515 OXY- ACETYLENE POWDER DELIVERY SYSTEM OR TORCH KIT FOR THERMAL SPRAY PROCESS
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Haridwar
Delivery Pincodes
249403
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Paras | 249403,Shipping Section, Central Plant Stores, HEEP, BHEL, Haridwar-249403 Uttarakhand | Haridwar | Uttarakhand | 249403 | 150 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about UTTARAKHAND tender market
Bidders should register on GEM, obtain the ATC document, prepare EMD per GEM norms, and submit technical and financial bids with OEM authorizations. Ensure compliance with option clause and delivery extension rules. Verify exact itemization and safety certifications in the final bid package.
Prepare GST registration, PAN, experience certificates, financial statements, prior supplier performance, EMD deposit, technical compliance documents, and OEM authorization letters. Ensure up-to-date certificates accompany the bid and align with ATC requirements in the tender package.
Delivery begins from the last date of the original delivery order. If quantities increase by up to 25%, the extended period is calculated as (Increased/Original) × Original days, with a minimum of 30 days. Acceptance hinges on timely performance and contract rate stability.
Standards are not specified in the available data; bidders should provide ISI/ISO certifications and material safety data in the final submission, along with supplier quality records and conformity statements from the OEM.
ATC documents set bidder-specific terms and additional conditions. Bidders must view and comply with the ATC terms for the final submission, including any special handling or packaging requirements for nickel-based powders.
The option clause allows a 25% quantity variance at contract placement and during currency. Price remains at contracted rates; bidders should plan for volume flexibility and update pricing in case of scope changes.
With no BOQ items listed, bidders must await the final itemization; in the interim, prepare generic pricing structures, confirm powder grade, packaging, delivery terms, and OEM support commitments to align with anticipated specifications.