Progress
The Indian Army, Department Of Military Affairs, invites bids for a Dual Band Transmitter (NOMAD) in Tinsukia, Assam. No BOQ items exist, but the contract includes an option to increase quantity up to 25% and extend delivery time proportionally, with a minimum extension of 30 days. Bidders must meet ISO 9001 certification and supply a Material Test Certificate at delivery. Both bidders and OEMs require established three-year turnover evidence, aligning with the tender’s financial criteria.
Product/service: Dual Band Transmitter (NOMAD) for military use
Standards: ISO 9001 certified (bidder or OEM)
Quality: Material Test Certificate with delivery, lab-based acceptance
Qualifications: Minimum three-year average turnover (bidder and OEM as applicable)
Delivery: Delivery period per contract with option to increase quantity up to 25% and extend time with a minimum 30 days
Option Clause allows 25% quantity increase and proportional delivery extensions
ISO 9001 certification mandatory for bidder or OEM
Material Test Certificate required; buyer lab results govern acceptance
Not explicitly stated; standard bid terms apply per organization, ensure documentation and compliance with future payment schedule
Delivery period commences from the last date of the original delivery order; extended periods for option quantity, minimum 30 days
Not specified in provided data; expect standard L.D. terms per agency bid terms
ISO 9001 certification for bidder or OEM
Minimum average turnover over last 3 financial years (as per bid doc)
Ability to supply Dual Band Transmitter (NOMAD) and pass Material Test Certificate
Authorized OEM representation or direct OEM bid acceptable
Quantity
4
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
2
Past Performance
10 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Dual Band Transmitter (NOMAD)
Pre-Bid Date
23-10-2026 13:00:00
Pre-Bid Venue
846 FD WKSP COY EME, DINJAN
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Tinsukia
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tinsukia | Tinsukia | - | - | 4 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited balance sheets for last 3 years or CA/CMA turnover certificate
ISO 9001 certification document (bidder or OEM)
Material Test Certificate to accompany supply
OEM authorization letter (if bidding via third party)
Bidder/Company turnover proof for last 3 financial years
Any other certificates requested in bid document or ATC
Key insights about ASSAM tender market
Bidders must meet ISO 9001 certification, provide Material Test Certificate with delivery, and submit three years of audited turnover or CA/CMA certificates. OEM turnover requirements apply and an option to increase quantity by up to 25% may affect delivery timelines. Prepare all required documents before bid submission.
Submit GST certificate, PAN, ISO 9001 certificate (bidder or OEM), Material Test Certificate, three years of audited turnover or CA/CMA certificate, and OEM authorization if applicable. Upload all certifications with the bid as per ATC and corrigendum guidance.
Delivery period can extend with up to 25% increase in quantity; additional time calculated as (increased quantity/original quantity) × original delivery period, with a minimum extension of 30 days, and may extend up to the original delivery period.
Mandatory ISO 9001 certification for bidder or OEM; Material Test Certificate must accompany supply; buyer lab results govern acceptance for all delivered items.
Provide average annual turnover for last 3 financial years ending 31st March of the previous year, certified audited balances or CA/CMA certificate. For new entities, turnover is calculated from completed years post-constitution.
Delivery timeline starts from the last date of the original delivery order; extended delivery periods due to option quantity are calculated and must maintain a minimum 30-day extension.
Yes, OEM authorization is required if bidding through an intermediary; direct OEM bids are acceptable with appropriate turnover proofs and OEM capability demonstrated.
Failure of Material Test Certificate leads to rejection of the supply; ensure all material tests pass per buyer’s laboratory criteria and attach verification documentation with the bid.