TenderDekho Logo
Active GEM

Food Corporation Of India Dehradun Procurement of Inverter AC, LED Lighting & Office Furniture 2026

Bid Publish Date

09-Oct-2026, 6:02 pm

Bid End Date

19-Oct-2026, 7:00 pm

EMD

₹30,000

Progress

Issue09-Oct-2026, 6:02 pm
AwardPending

Tender Overview

Organization: Food Corporation Of India (FCI) – Department Of Food And Public Distribution. Location: Dehradun, Uttarakhand (PIN 248001). Product/Service: broad procurement across categories including Inverter AC, Industrial Exhaust, LED Lighting, Curtains, Tables, Chairs, Aluminium Partition, Almirah, Office Almirah, Metal Overhead Storage, Corner Sink Unit, Modular Workstation, Island Granite Table, Wall Panel, Vinyl Flooring, and Window Blind. Estimated Value: not disclosed; EMD: ₹30,000. Potential quantity variation up to 25% at contract; delivery timelines adapt to quantity changes. Unique clause requires bidder site visit prior to quoting. Tender targets turnkey office fit-out components for FCI facilities in Dehradun. The contract includes phased delivery with option for scale, and post-installation defect liability terms.

Technical Specifications & Requirements

  • No explicit technical specs provided in the tender text. However, bidders must cover full installation and commissioning of listed items, with on-site installation where applicable.
  • Required delivery readiness includes establishing a Functional Service Centre in the state if carry-in warranty applies, or on-site warranty coverage. Service centre setup deadline: within 30 days of award. Documentation must prove functional service capability.
  • BOQ comprises 17 items across furniture, fittings, and equipment; exact itemization not disclosed, but scope includes modular and office hardware with installation.
  • Additional emphasis on turnover: last three years’ average turnover must meet/in line with bid document; CA or audited balance sheets to be uploaded.

Terms, Conditions & Eligibility

  • EMD: ₹30,000.
  • Delivery: delivery period may extend with option clause; minimum extension logic applies.
  • Payment Terms: 90% on successful installation and completion certificate; 10% after 12-month defect liability/maintenance period.
  • Experience: bidders must demonstrate prior work on at least three similar projects; provide experience certificates.
  • Service Centres: required in the consignee’s state; must be established within 30 days post-award if not already existing.
  • Documents: mandatory certificates and documents per bid document and ATC; non-submission leads to rejection.
  • Site Visit: bidder must visit site before quoting.
  • Turnover: average annual turnover for the last 3 years must meet thresholds; provide audited statements.
  • Financial Standing: no liquidation or insolvency; bidder to submit an undertaking.

Key Specifications

  • No explicit technical specs provided; scope includes Inverter AC, Industrial Exhaust, LED Lighting, Curtains, Tables, Chairs, Aluminium Partition, Almirah, Metal Overhead Storage, Corner Sink Unit, Modular Workstation, Island Granite Table, Wall Panel, Vinyl Flooring, Window Blind

  • EMD amount: ₹30,000

  • Delivery flexibility: option to increase quantity up to 25% during contract

  • Service centre requirement: functional in each consignee state or establish within 30 days

  • Payment terms: 90% after installation and completion certificate; 10% after 12-month defect liability period

  • Turnover requirement: average annual turnover over last 3 years as per bid document

Terms & Conditions

  • EMD amount set at ₹30,000 with submission proof

  • Delivery quantities may vary 25% up or down during contract

  • Post-installation payment 90% upfront, 10% after 12-month defect liability

Important Clauses

Payment Terms

90% payment after successful installation and inspection and issue of completion certificate; remaining 10% after 12 months defect liability/maintenance period.

Delivery Schedule

Option to increase quantity by 25% during contract; delivery period adjusts proportionally with minimum 30 days extension.

Site Visit

Bidder must visit the site before quoting to assess installation scope and site-specific requirements.

Bidder Eligibility

  • Minimum average annual turnover in last 3 years as per bid document

  • Not under liquidation, receivership, or bankruptcy; provide undertaking

  • Experience certificates for at least three similar office-fit-out projects

Advertisement

Tender Data

Bid Details

Quantity

1317

Category

Inverter AC

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Inverter AC , Industrial Exhaust , LED Lighting , Curtains , Tables , Chair , Aluminium Partition , Almirah , OFFICE ALMIRAH , METAL OVERHEAD STORAGE , CORNER SINK UNIT , MODULAR WORKSTATION , ISLAND GRANITE TABLE , wall panel , vinyl flooring , window blind

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Dehradun

Delivery Pincodes

248001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Prakhar Rana248001,FCI, REGIONAL OFFICE, 1ST FLOOR, UCF SADAN, NEAR PRASAR BHARTI OFFICE, HARIDWAR BYPASS ROAD, DEHRADUNDehradunUttarakhand248001115-

Authority Records

MINISTRY OF CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTIONFOOD AND PUBLIC DISTRIBUTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9999234.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

Inverter AC

1.5 Ton

1 pieces Delivery: 15 days
#2

Industrial Exhaust

16 inch

1 pieces Delivery: 15 days
#3

LED Lighting

NaN

20 pieces Delivery: 15 days
#4

Curtains

9 FIT

5 pieces Delivery: 15 days
#5

Tables

4 X 3

2 pieces Delivery: 15 days
#6

Chair

Revolving

10 pieces Delivery: 15 days
#7

Aluminium Partition

150 sq ft

150 sqft Delivery: 15 days
#8

Almirah

910 X 480X1980

2 pieces Delivery: 15 days
#9

OFFICE ALMIRAH

910X480X1980

6 pieces Delivery: 15 days
#10

METAL OVERHEAD STORAGE

WITH 1 SHELF 900X350X775

3 pieces Delivery: 15 days
#11

CORNER SINK UNIT

WITH GRANITE TOP INCLUDED BOTTOM STORAGE WITH 1 SHITTER 900X900

1 pieces Delivery: 15 days
#12

MODULAR WORKSTATION

W1200Xd600Xh750/1220 PROVIDING AND PLACING MODULAR WORKSTATION

4 pieces Delivery: 15 days
#13

MODULAR WORKSTATION

W1800Xd600Xh750/1220 PROVIDING AND PLACING MODULAR WORKSTATION

1 pieces Delivery: 15 days
#14

ISLAND GRANITE TABLE

WITH STORAGE AND LEGSPACE AND REGENT RACK

1 pieces Delivery: 15 days
#15

wall panel

750sqft

750 sqft Delivery: 15 days
#16

vinyl flooring

340sqft

340 sqft Delivery: 15 days
#17

window blind

20sqft

20 sqft Delivery: 15 days
Advertisement

Categories 31

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for the last 3 years or CA certificate detailing turnover

4

Experience certificates of similar projects (minimum 3 completed works)

5

EMD submission proof (receipt or payment confirmation)

6

Technical bid documents and compliance certificates

7

OEM authorization certificate (if applicable)

8

Declaration of no insolvency or liquidation status

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for the Dehradun FCI office furniture tender in 2026?

Bidders must submit GST, PAN, audited turnover for last 3 years, and experience certificates for at least three similar projects. Provide EMD ₹30,000, OEM authorizations if required, and site-visit confirmation. Ensure 90% payment on installation and 10% after 12-month defect liability period.

What documents are required for the Dehradun procurement by FCI?

Required documents include GST certificate, PAN card, audited financials or CA certificate for turnover, experience certificates, EMD proof, technical bid, OEM authorization (if applicable), and an undertaking of no insolvency. Site-visit completion proof may be needed.

What are the delivery terms for the Dehradun furniture tender?

Delivery terms allow up to 25% quantity variation at contract; delivery period scales with quantity. Minimum extension is 30 days, with extensions possible up to the original delivery period while exercising the option clause.

What is the payment schedule for installation in this tender?

Payment is structured as 90% on successful installation and completion certificate, with the remaining 10% released after a 12-month defect liability/maintenance period, subject to contractual validation.

What turnover criteria must bidders meet for the Dehradun bid?

Bidders must show average annual turnover for the last three years as specified in the bid document, supported by audited balance sheets or CA certificates; if the company is less than 3 years old, use post-incorporation years.

Are service centers required in the consignee's state for this tender?

Yes. A functional service center must exist in each consignee state or be established within 30 days of award for carry-in warranty items; payment release hinges on evidence of service capability.

What items are included under the FCI Dehradun office furniture scope?

The scope includes Inverter AC, Industrial Exhaust, LED Lighting, Curtains, Tables, Chairs, Aluminium Partition, Almirah, Metal Overhead Storage, Corner Sink Unit, Modular Workstation, Island Granite Table, Wall Panel, Vinyl Flooring, and Window Blind.

What is the significance of the 25% option clause in this tender?

The option clause allows quantity adjustments up to 25% during contract and at extended periods; bidders should plan scalable production, maintain supply chain readiness, and price accordingly to minimize risk of scope changes.