FLOWMETER, MAGNETIC, 8IN, MM: PROMAG 10 L,FLOWMETER, DN80, MM: 10L80-QL0A1AA0B4AA+ Z1,FLOWMETER, MA
Rourkela Steel Plant
SUNDERGARH, ODISHA
Progress
Quantity
4
Category
MAGNETIC FLOWMETER
Bid Type
Two Packet Bid
The opportunity is issued by Indian Oil Corporation Limited (IOCL) – Digboi Refinery for the Magnetic Flowmeter with Site Supervision for Installation & Commissioning. The scope covers Supply, Installation, Testing and Commissioning of the specified flowmeter and related supervision services. While the tender does not publish a project value or start/end dates, it defines a flexible quantity option of ±25% at contracted rates and requires participation with specific vendor documents (PAN, GSTIN, cancelled cheque, EFT mandate). A key differentiator is the mandatory third-party inspection by IOCL-approved agencies, with inspection charges included in prices. The procurement emphasizes adherence to the attached technical specification and ATC documentation. The absence of BOQ items indicates that bidders should closely review the tender technical spec and the ATC for scope clarity, while ensuring readiness for future quantity adjustments during contract execution. The tender highlights emphasize compliance, risk management and regulatory verification through third-party inspection.
Product/service names: Magnetic Flowmeter; Site Supervision for Installation & Commissioning
Quantity/Scope: Supply, Installation, Testing and Commissioning; site supervision
EMD/Value: Not disclosed in data; standard industry practice applies
Experience: Not explicitly stated; must adhere to ATC for declarations
Quality/Compliance: Third-party inspection required; list of approved agencies
Option clause allows ±25% quantity change at contracted rates
Third-party inspection included; agencies listed; no extra charges payable by IOCL
Mandatory vendor documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Payment terms not explicitly disclosed; ATC will specify when bidder references attach documents
Delivery period linked to the original/date of order with option extension; minimum 30 days extension if applicable
Not explicitly stated; IOCL standard penalties may apply as per ATC
Must quote as per attached technical specification
Must submit required PAN, GSTIN, and EFT mandate
Must comply with third-party inspection from IOCL-approved agencies
Main Document
OTHER
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Rourkela Steel Plant
SUNDERGARH, ODISHA
Salem Steel Plant
SALEM, TAMIL NADU
Cement Corporation Of India Limited (cci)
KARBI ANGLONG, ASSAM
Central Power Research Institute (cpri) Bangalore Karnataka
RAIPUR, CHHATTISGARH
Bharat Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
Vendor code creation documents as per ATC
Technical bid documents per attached tender technical specification
OEM authorizations (if applicable) per ATC
Third-party inspection release notes (timely submission) per IOCL requirements
Key insights about ASSAM tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with the bid, quote per attached technical specification, and comply with third-party inspection by IOCL-approved agencies. Ensure delivery terms align with the option to adjust quantity by 25% and include all testing/commissioning costs.
Required documents include PAN card, GSTIN, cancelled cheque, EFT mandate certified by bank, vendor code creation data per ATC, technical bid per attached specification, OEM authorizations if applicable, and third-party inspection release notes to be submitted timely.
IOCL-approved agencies such as Bureau Veritas, SGS, TUV India, Intertek, and others will conduct stage-wise and final inspections. Inspection charges are included in quoted prices, and timely release notes must be submitted with the bid.
Scope covers Supply, Installation, Testing and Commissioning of the Magnetic Flowmeter along with site supervision during installation, as per attached technical specification and ATC formats.
The purchaser may increase or decrease the quantity by up to 25 percent at contract time and during the currency of the contract, at the contracted rates, with delivery extension rules as defined.
Bidders must refer to the Buyer's uploaded ATC document for declaration formats and other data; quote as per attached technical specification and ensure compliance with declared formats.
Inspections occur as per stage-wise and final checks by approved agencies; no time extensions will be granted for delays, and release notes must be provided on time for acceptance.
Prices must be inclusive of all facilities required for testing and inspection; there is no separate BOQ; ensure prices reflect testing, commissioning, and third-party inspection costs.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS