TenderDekho Logo
Closed GEM

Bids are Invited For CONTACTOR as per attached TS,CONTACTOR as per attached TS,CONTACTOR as per attached TS,CONTACTOR as in BARAMULLA, JAMMU & KASHMIR

Bid Publish Date

19-Sep-2026, 10:55 am

Bid End Date

05-Oct-2026, 11:00 am

EMD

₹23,000

Value

₹11,61,568

Progress

Issue19-Sep-2026, 10:55 am
AwardPending

Public procurement opportunity for N/a CONTACTOR as per attached TS, CONTACTOR RELAY as per attached TS, THERMAL OVERLOAD RELAY as per attached TS, OVERLOAD RELAY WITH SPP PROTECION as per attached TS, BIMETAL THERMAL OVERLOAD RELAY as per attached TS, LED INDICATOR RED as per attached TS, AUX CONTACTOR as per attached TS, POWER CONTACTOR as per attached TS, NON ILLUMINATED PUSH BUTTON as per attached TS, POWER CONTACTOR 73A as per attached TS, AUX CONTACT BLOCK FOR POWER CONTACTORas per attached TS, E START PUSH BUTTON as per attached TS, ON DELAY TIMER as per attached TS, RESISTOR as per attached TS in BARAMULLA, JAMMU & KASHMIR. Quantity: 262 issued by. Submission Deadline: 05-10-2026 11: 00: 00. View full details and respond.

Advertisement

Authority & Contact

Organization

N/a

Department

NA

Office Name

Nhpc Ltd

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

262

Category

CONTACTOR as per attached TS

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CONTACTOR as per attached TS , CONTACTOR RELAY as per attached TS , THERMAL OVERLOAD RELAY as per attached TS , OVERLOAD RELAY WITH SPP PROTECION as per attached TS , BIMETAL THERMAL OVERLOAD RELAY as per attached TS , LED INDICATOR RED as per attached TS , AUX CONTACTOR as per attached TS , POWER CONTACTOR as per attached TS , NON ILLUMINATED PUSH BUTTON as per attached TS , POWER CONTACTOR 73A as per attached TS , AUX CONTACT BLOCK FOR POWER CONTACTORas per attached TS , E START PUSH BUTTON as per attached TS , ON DELAY TIMER as per attached TS , RESISTOR as per attached TS

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

15

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Baramulla

Delivery Pincodes

193123

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ghanshyam Jatav193123,Uri-II Power Station, NHPC Limited, Nowpora, Tehsil - UriBaramullaJammu And Kashmir193123490-

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9899812.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 25 Items Sign in for GEM prices

#1

CONTACTOR as per attached TS

CONTACTOR as per attached TS

4 nos Delivery: 90 days
#2

CONTACTOR as per attached TS

CONTACTOR as per attached TS

3 nos Delivery: 90 days
#3

CONTACTOR as per attached TS

CONTACTOR as per attached TS

6 nos Delivery: 90 days
#4

CONTACTOR as per attached TS

CONTACTOR as per attached TS

6 nos Delivery: 90 days
#5

CONTACTOR RELAY as per attached TS

CONTACTOR RELAY as per attached TS

50 nos Delivery: 90 days
#6

CONTACTOR RELAY as per attached TS

CONTACTOR RELAY as per attached TS

30 nos Delivery: 90 days
#7

THERMAL OVERLOAD RELAY as per attached TS

THERMAL OVERLOAD RELAY as per attached TS

5 nos Delivery: 90 days
#8

THERMAL OVERLOAD RELAY as per attached TS

THERMAL OVERLOAD RELAY as per attached TS

5 nos Delivery: 90 days
#9

OVERLOAD RELAY WITH SPP PROTECION as per attached TS

OVERLOAD RELAY WITH SPP PROTECION as per attached TS

5 nos Delivery: 90 days
#10

THERMAL OVERLOAD RELAY as per attached TS

THERMAL OVERLOAD RELAY as per attached TS

5 nos Delivery: 90 days
#11

BIMETAL THERMAL OVERLOAD RELAY as per attached TS

BIMETAL THERMAL OVERLOAD RELAY as per attached TS

5 nos Delivery: 90 days
#12

THERMAL OVERLOAD RELAY as per attached TS

THERMAL OVERLOAD RELAY as per attached TS

5 nos Delivery: 90 days
#13

THERMAL OVERLOAD RELAY as per attached TS

THERMAL OVERLOAD RELAY as per attached TS

5 nos Delivery: 90 days
#14

CONTACTOR as per attached TS

CONTACTOR as per attached TS

5 nos Delivery: 90 days
#15

LED INDICATOR RED as per attached TS

LED INDICATOR RED as per attached TS

30 nos Delivery: 90 days
#16

AUX CONTACTOR as per attached TS

AUX CONTACTOR as per attached TS

5 nos Delivery: 90 days
#17

POWER CONTACTOR as per attached TS

POWER CONTACTOR as per attached TS

10 nos Delivery: 90 days
#18

NON ILLUMINATED PUSH BUTTON as per attached TS

NON ILLUMINATED PUSH BUTTON as per attached TS

20 nos Delivery: 90 days
#19

POWER CONTACTOR 73A as per attached TS

POWER CONTACTOR 73A as per attached TS

7 nos Delivery: 90 days
#20

AUX CONTACT BLOCK FOR POWER CONTACTORas per attached TS

AUX CONTACT BLOCK FOR POWER CONTACTORas per attached TS

20 nos Delivery: 90 days
#21

CONTACTOR as per attached TS

CONTACTOR as per attached TS

3 nos Delivery: 90 days
#22

E START PUSH BUTTON as per attached TS

E START PUSH BUTTON as per attached TS

12 nos Delivery: 90 days
#23

ON DELAY TIMER as per attached TS

ON DELAY TIMER as per attached TS

10 nos Delivery: 90 days
#24

RESISTOR as per attached TS

RESISTOR as per attached TS

3 nos Delivery: 90 days
#25

RESISTOR as per attached TS

RESISTOR as per attached TS

3 nos Delivery: 90 days

Categories 14

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement