TenderDekho Logo
Closed GEM

Nuclear Power Corporation Of India Limited Life Jacket Tender Thane Maharashtra - SOLAS MSC 74 Compliance 2025

Bid Publish Date

05-Nov-2025, 12:12 pm

Bid End Date

01-Dec-2025, 12:00 pm

Generate Docs

Progress

Issue05-Nov-2025, 12:12 pm
Technical17-11-2025 11:55:42
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

30

Bid Type

Two Packet Bid

Categories 4

Tender Overview

Nuclear Power Corporation Of India Limited, Department Of Atomic Energy, seeks life jackets compliant with Resolution MSC 48 (66) and SOLAS 74 for procurement at Thane, Maharashtra. The bid covers the supply of goods with a flexible quantity option (up to 25% increases during contract) and delivery terms tied to the original schedule. The tender specifies that unloading is the buyer’s responsibility, and price should reflect all costs. ATC documents have been uploaded on GeM. The scope emphasizes compliance with safety standards for marine equipment and a single-sourcing approach to aquatic safety gear. The absence of explicit itemized quantities indicates a potentially variable demand profile across related maritime safety kits, requiring precise vendor capability.

Technical Specifications & Requirements

  • Product category: Life jacket meeting SOLAS 74 and MSC 48 (66) standards.
  • Scope: Only supply of goods; unloading to be borne by the buyer.
  • Delivery flexibility: Option to increase quantity by up to 25% during contract; delivery period adjusted proportionally with a minimum of 30 days.
  • ATC considerations: Compliance with additional specifications per item; ensure proper documentation is provided with bid.
  • Tender environment: GeM ATC clauses govern bids; two-part tender handling requires separate price submissions for technical/commercial and price.
  • Key risk: Absence of detailed item specifications; bidders must demonstrate SOLAS/MSC 74 readiness and certification.

Terms & Eligibility

  • Unloading: Buyer bears unloading costs; quoted prices must exclude unloading.
  • Delivery timing: Increased quantity delivery timing calculated from original delivery period; minimum 30 days; extension possible within original delivery window.
  • EMD/financials: No explicit EMD amount published in data; bidders should prepare typical security deposits per GeM norms.
  • Documentation: Ensure compliance with GeM ATC; submission of technical and commercial documents upfront; clarify any deviations in specification parameters.
  • Bid integrity: Do not mix price details between Part I and Part II bids; adhere to ATC instructions.
  • _post-submission: Communications must follow GeM portal workflows for clarifications and negotiations.

Key Specifications

    • Product: Life jacket
    • Standards: SOLAS 74; MSC 48 (66)
    • Scope: Only supply of Goods; unloading by buyer
    • Delivery flexibility: 25% quantity increase option; minimum delivery window 30 days
    • Documentation: Ensure ATC compliance and item-specific parameters
    • Packaging/brand: Not explicitly specified; confirm OEM requirements during bid

Terms & Conditions

  • Delivery terms permit up to 25% quantity variation at contract award and during currency, with delivery window adjusted accordingly

  • Unloading charges to be borne by buyer; quoted price excludes unloading

  • Two-part tenders require strict separation of price and technical/commercial bids to avoid rejection

  • ATC compliance and item-specific specifications must be confirmed in bid submissions

  • GeM portal communications govern clarification, price negotiation, and bid changes

Important Clauses

Option Clause

Purchaser may increase/decrease quantity up to 25% at contract or during currency; delivery time adjusts proportionally with minimum 30 days

Unloading Responsibility

Unloading is the buyer's responsibility; unloading charges excluded from quoted prices

Bid Submission Integrity

Avoid mixing price data between Part-I and Part-II; strict adherence to GeM ATC format

Communication Protocol

All bid-related communications to be conducted strictly via GeM portal per ATC

Bidder Eligibility

  • Demonstrated experience supplying life jackets or equivalent marine safety gear

  • Compliance with SOLAS 74 and MSC 48 (66) standards

  • Financial capacity and GST registration, with verifiable turnover in related gear delivery

  • OEM authorization or approved distributor status where applicable

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Life Jacket (Resolution MSC 48 (66) and Solas 74) (Q2)

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8547878.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar life jacket supply

4

Financial statements (last 2-3 years)

5

EMD/Security deposit as per GeM norms

6

Technical bid documents confirming SOLAS 74 and MSC 48 (66) compliance

7

OEM authorization certificate (if applicable)

8

Product technical specifications and certifications (ISI/ISO if required)

Corrigendum Updates

2 Updates
#1

Update

24-Nov-2025

Extended Deadline

01-Dec-2025, 12:00 pm

Opening Date

01-Dec-2025, 12:30 pm

#2

Update

17-Nov-2025

Extended Deadline

24-Nov-2025, 12:00 pm

Opening Date

24-Nov-2025, 12:30 pm

Technical Results

S.No Seller Item Date Status
1
MARINE MARKETING SERVICES   Under PMA
Make : ULTRASAFE Model : ULTRASAFE JA17-11-2025 11:55:42

Financial Results

Rank Seller Price Item
L1
MARINE MARKETING SERVICES(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Life Jacket (Resolution MSC 48 (66) and Solas 74)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for the life jacket tender in Thane Maharashtra 2025?

Bidders should register on GeM, upload all required documents (GST, PAN, experience certificates, financials), and submit a two-part bid per ATC. Ensure SOLAS 74 and MSC 48 (66) compliance is proven with certifications. Prepare for potential 25% quantity variation and unloading by the buyer.

What documents are required for NPCIL life jacket procurement in Thane?

Required documents include GST certificate, PAN, two to three years of financial statements, experience certificates for related supply, EMD details as per GeM norms, technical bid confirming SOLAS 74/MSC 48(66) compliance, and OEM authorization if applicable.

What standards must life jackets meet for this tender in Maharashtra?

Life jackets must be SOLAS 74 compliant and MSC 48 (66) compliant. Provide certification proof and ensure the product meets marine safety gear requirements and any related ISI/ISO certifications requested in ATC documents.

What is the delivery timeframe for quantity variations in this bid?

The option allows up to 25% quantity variation; delivery period for additional quantity is calculated as (additional/original) × original period with a minimum of 30 days, and extended within the original delivery window.

What are the unloading responsibilities for this life jacket bid?

Unloading is the buyer’s responsibility; quoted prices must exclude unloading charges. Bid submissions should explicitly state this allocation to avoid disputes at contract award.

How are price bids evaluated for two-part tenders in this procurement?

Price bids must be kept separate from technical/commercial bids. Any mixing of data across parts may lead to bid rejection; adhere strictly to GeM ATC structure for evaluation integrity.

What is the scope of supply for this NPCIL tender in Thane?

Scope is limited to the supply of life jackets; unloading is excluded from price. The ATC requires compliance with SOLAS 74 and MSC 48(66) standards and any additional item specifications.

What is the role of GeM ATC in this life jacket tender?

GeM ATC governs additional specifications, compliance evidence, and post-submission communications. Vendors must attach ATC-compliant documentation, respond to clarifications, and align with price negotiation procedures via GeM portal.