Contract Bidding Open For Civil work for synthetic hockey court with sub base for hockey court,Laying of Artificial grass wit in ALMORA, UTTARAKHAND

Bid Publish Date

25-May-2026, 10:55 am

Bid End Date

04-Jun-2026, 11:00 am

EMD

₹81,000

Progress

RA
Issue25-May-2026, 10:55 am
Reverse Auction23-Jun-2026, 9:00 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

24145

Category

Civil work for synthetic hockey court with sub base for hockey court

Bid Type

Two Packet Bid

Categories 67

Indian Army announces a tender for Civil work for synthetic hockey court with sub base for hockey court, Laying of Artificial grass with installation of Artificial Grass, Provision of Hockey goal post, Chain link fencing, Floodlights in ALMORA, UTTARAKHAND. Quantity: 24145. Submission Deadline: 04-06-2026 11: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Civil work for synthetic hockey court with sub base for hockey court , Laying of Artificial grass with installation of Artificial Grass , Provision of Hockey goal post , Chain link fencing , Floodlights

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9343132.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Civil work for synthetic hockey court with sub base for hockey court

Civil work for synthetic Hockey court Soil Treatment Excavation of ground up to a depth of 06 inch from the ground stop Removing all weeds and grass from its roots of the ground area stop Removing of excavated soil bracket start if required bracket stop Full treatment of soil with anti-termite chemical bracket start Making 9 inch deep holes spaced 12 inch apart bracket closed and injecting the approve chemicals and plugging the holes with cement mortar stop Sub base for Hockey Court Supply and rolling on aggregate stone dust compacted with 8 ton roller. Stone size isto 60 - 40 mm comma 20-12-6 mm stop Total thickness 6 inch comma Providing and fixing of 6 inch rating oblique to wall 1 inch height comma 3 inch above the floor level stop Wall skirting all around the Volleyball court Providing open saucer drain 6 inch to 9 inch width in slope on the lower side for water drainage stop Appropriate slope for water flow inside the court stop Grading of area up to 7 ft around outside the court along the curbing with filling of soil and gradual slope stop The base should be protected with foundation wall to avoid wash away stop

10,585 sqft Delivery: 180 days
#2

Laying of Artificial grass with installation of Artificial Grass

Laying of Artificial grass Laying of Artificial grass of as per FIH standards fifteen mm artificial grass having straight monofilament with silica sand and joint by sewn seams bracket start Including all markings bracket closed Marking as applicable comma Installation of Artificial grass Spreading of the turf Sewing of the Joint Turf is ninety nine percent sewn installation comma Gluing of rolls shall not be acceptable comma Minimum gluing will only be permitted to repair problem areas stop All seems shall be sewn using double bagger stitches and polyester thread or comma in the case of gluing comma adhered using seaming tape and high grade adhesive bracket start per the manufactures standard procedures bracket closed stop Seams shall be flat comma tight and permanent with no separation of frying comma Specification of Infill Material Silica Sand The turf is to be filled with a dressing layer of rubber and silica sand infill stop The infill should be combination of rubber granules and silica sand layered between the turf fibers and backing stop River sand is not to be used as it breaks down to powder after prolonged use Size Specifications for Silica Sand zero point five mm less than D five zero less than zero point seven mm comma or zero point 37mm less than D ten less than zero point 45mm one point 35 less than D six o oblique D ten less than one point sixty five zero point ninety less than D 230 less than one point ten D one zero D six zero Where D multiply represents the grain size for which multiply percentage of the bracket vi bracket closed rubber is smaller that is comma if D five zero isiqulato zero point seven mm comma this means that 50 percentage of grains bracket start by weight bracket closed are smaller than zero point seven mm point

10,585 sqft Delivery: 180 days
#3

Provision of Hockey goal post

Provision of Hockey goal post Made of mild steel pipe 75mm x 50mm thick. Upright and cross bars all poly enamel coated white. Upright and cross bars feature mild steel retaining rood to ensure met is held firmly at position. Complete with Net supports, lifting handles and top back bar made of 25-50mm mild steel. 460mm x 18mm thick strong wood or water proof ply wood back boards. Mild steel bolts throughout. Size of goal post- 3.66m x 2.13m x 1.22m Net- Nylon Size- 3.7m(W) X 1.2m(D) X 21.M (H) Type- Box type twisted

1 set Delivery: 180 days
#4

Chain link fencing

Proving to fabricate and creating of GI chain link fencing with 75mm x 75mm 10 gauge hexagonal shape. Height of chain link fencing is 5 ft supported by 1 inch dia pipe space 10 ft apart point Top and Bottom supported by 1 inch x 1 inch pipe with the provision of One oblique Two gates complete with primer and enamel paints point

2,970 sqft Delivery: 180 days
#5

Floodlights

Four poles twenty five feet point high MS medium pipe electric poles stop Making a square frame of MS pipe and installing it on the top of the poles stop Putting steps on each of the poles so that maintenance can be easier stop Putting one point five mm three core wire from the top of the pole to the bottom for each LED light stop Installing MCB and other electrical switches for 100 watt LED Lights in an electrical box one each for one pole and one main box where all these four poles boxes come stop Installing 12 LED Lights of 100 watt

4 nos Delivery: 180 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

23-Jun-2026, 9:00 am

End

24-Jun-2026, 9:00 am

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-03-06-2026 16:45:30
2
**********   Under PMA
-03-06-2026 17:27:11
3
**********   Under PMA
-03-06-2026 18:21:00
4
**********   Under PMA
-03-06-2026 20:20:35
5
**********   Under PMA
-03-06-2026 16:26:26
6
**********   Under PMA
-03-06-2026 16:58:53
7
**********   Under PMA
-03-06-2026 12:20:01
8
**********   Under PMA
-03-06-2026 19:29:46
9
**********   Under PMA
-03-06-2026 17:00:11
10
**********   Under PMA
-03-06-2026 18:17:15
11
**********   Under PMA
-03-06-2026 10:34:08
12
**********   Under PMA
-31-05-2026 11:11:20
13
**********   Under PMA
-04-06-2026 10:26:32
14
**********   Under PMA
-02-06-2026 22:12:42