TenderDekho Logo
GEM

Contract Bidding Open For Main Power house 750 KVA DG set 1 for First year,Main Power house 750 KVA DG set 2 for First year,M in DIBRUGARH, ASSAM

Bid Publish Date

21-Mar-2025, 8:08 pm

Bid End Date

31-Mar-2025, 9:00 pm

Value

₹1,09,37,774

Progress

Issue21-Mar-2025, 8:08 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

212

Bid Type

Two Packet Bid

Categories 28

Airports Authority Of India invites bids for Main Power house 750 KVA DG set 1 for First year, Main Power house 750 KVA DG set 2 for First year, Main Power house 750 KVA DG set 3 for First year, Main Power house 750 KVA DG set 1 for Second year, Main Power house 750 KVA DG set 2 for Second year, Main Power house 750 KVA DG set 3 for Second year, Main Power house 750 KVA DG set 1 for Third year, Main Power house 750 KVA DG set 2 for Third year, Main Power house 750 KVA DG set 3 for Third year, DWR 125 KVA DG set for First year, DWR 125 KVA DG set for second year, DWR 125 KVA DG set for Third year, ATC substation 750KVA DG set 1 for first year, ATC substation 750KVA DG set 2 for first year, ATC substation 750KVA DG set 1 for second year, ATC substation 750KVA DG set 2 for second year, ATC substation 750KVA DG set 1 for Third year, ATC substation 750KVA DG set 2 for Third year, ATC substation750 KVA B Check, Main Power house 750KVA D check, ATC substation 750KVA D check, DWR 125 KVA D check in DIBRUGARH, ASSAM. Quantity: 212. Submission Deadline: 31-03-2025 21: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Main Power house 750 KVA DG set 1 for First year , Main Power house 750 KVA DG set 2 for First year , Main Power house 750 KVA DG set 3 for First year , Main Power house 750 KVA DG set 1 for Second year , Main Power house 750 KVA DG set 2 for Second year , Main Power house 750 KVA DG set 3 for Second year , Main Power house 750 KVA DG set 1 for Third year , Main Power house 750 KVA DG set 2 for Third year , Main Power house 750 KVA DG set 3 for Third year , DWR 125 KVA DG set for First year , DWR 125 KVA DG set for second year , DWR 125 KVA DG set for Third year , ATC substation 750KVA DG set 1 for first year , ATC substation 750KVA DG set 2 for first year , ATC substation 750KVA DG set 1 for second year , ATC substation 750KVA DG set 2 for second year , ATC substation 750KVA DG set 1 for Third year , ATC substation 750KVA DG set 2 for Third year , ATC substation750 KVA B Check , Main Power house 750KVA D check , ATC substation 750KVA D check , DWR 125 KVA D check

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7670112.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 22 Items Sign in for GEM prices

#1

Main Power house 750 KVA DG set 1 for First year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 1 For First Year

12 months Delivery: 1,096 days
#2

Main Power house 750 KVA DG set 2 for First year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 2 For First Year

12 month Delivery: 1,096 days
#3

Main Power house 750 KVA DG set 3 for First year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 3 For First Year

12 month Delivery: 1,096 days
#4

Main Power house 750 KVA DG set 1 for Second year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 1 For Second Year

12 month Delivery: 1,096 days
#5

Main Power house 750 KVA DG set 2 for Second year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 2 For SecondYear

12 month Delivery: 1,096 days
#6

Main Power house 750 KVA DG set 3 for Second year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 3 For Second Year

12 month Delivery: 1,096 days
#7

Main Power house 750 KVA DG set 1 for Third year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 1 For Third Year

12 month Delivery: 1,096 days
#8

Main Power house 750 KVA DG set 2 for Third year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 2 For Third Year

12 month Delivery: 1,096 days
#9

Main Power house 750 KVA DG set 3 for Third year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required Main Power House DG set 3 For Third Year

12 month Delivery: 1,096 days
#10

DWR 125 KVA DG set for First year

Annual Maintenance Contract of 125 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required DWR DG set For First Year

12 month Delivery: 1,096 days
#11

DWR 125 KVA DG set for second year

Annual Maintenance Contract of 125 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required DWR DG set For Second Year

12 month Delivery: 1,096 days
#12

DWR 125 KVA DG set for Third year

Annual Maintenance Contract of 125 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required DWR DG set For Third Year

12 month Delivery: 1,096 days
#13

ATC substation 750KVA DG set 1 for first year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required ATC Substation DG set 1 For First Year after DLP

6 month Delivery: 1,096 days
#14

ATC substation 750KVA DG set 2 for first year

Annual Maintenance Contract of 750 KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required ATC Substation DG set 2 For First Year after DLP

6 month Delivery: 1,096 days
#15

ATC substation 750KVA DG set 1 for second year

Annual Maintenance Contract of 750KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required ATC Substation DG set 1 For second Year

12 month Delivery: 1,096 days
#16

ATC substation 750KVA DG set 2 for second year

Annual Maintenance Contract of 750KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required ATC Substation DG set 2 For second Year

12 month Delivery: 1,096 days
#17

ATC substation 750KVA DG set 1 for Third year

Annual Maintenance Contract of 750KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required ATC Substation DG set 1 For Third Year

12 month Delivery: 1,096 days
#18

ATC substation 750KVA DG set 2 for Third year

Annual Maintenance Contract of 750KVA Cummins Make DG Sets along with Panel inside the DG by OEM or OEM Authorised Service Dealer carrying out Routine Preventive Maintenance on Monthly Visit Basis attending All Breakdown Maintenance Calls carrying out B and C Check of Engines and attending minor faults of Equipments ensuring 100 percent Serviceability and Satisfactory Working Condition of the Systems as per Standard Manufacturers Practices including Supply of Spares and Accessories as per Special Terms and Conditions and Maintenance of Service Records and Reporting etc as required ATC Substation DG set 2 For Third Year

12 month Delivery: 1,096 days
#19

ATC substation750 KVA B Check

Carrying out B check maintenance of 750 KVA DG set of ATC Tower Substation For First Year

2 job Delivery: 1,096 days
#20

Main Power house 750KVA D check

Carrying out D check maintenance of following DG sets including supplying and replacement of required spares and consumables as specified in contract agreement complete as per manufacture recommendations general conditions and special conditions of contract agreement as and when required during the three years of contract period. Main Power house 750 KVA DG set

3 job Delivery: 1,096 days
#21

ATC substation 750KVA D check

Carrying out D check maintenance of following DG sets including supplying and replacement of required spares and consumables as specified in contract agreement complete as per manufacture recommendations general conditions and special conditions of contract agreement as and when required during the three years of contract period. ATC substation 750 KVA DG set

2 job Delivery: 1,096 days
#22

DWR 125 KVA D check

Carrying out D check maintenance of following DG sets including supplying and replacement of required spares and consumables as specified in contract agreement complete as per manufacture recommendations general conditions and special conditions of contract agreement as and when required during the three years of contract period. For 125 KVA DG set of DWR

1 job Delivery: 1,096 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about ASSAM tender market

What are the eligibility requirements for participating in this tender?

The eligibility requirements for this tender include being a registered entity such as a corporation or partnership. Additionally, bidders must provide proof of experience in maintaining power generating equipment and demonstrate qualified personnel familiar with Cummins products.

What certifications are required to bid on this project?

Bidders must provide relevant certifications that demonstrate their capability in handling maintenance of DG sets. This may include qualifications in electrical engineering or specific training in Cummins equipment maintenance.

How can I register to submit a bid?

The registration process typically requires bidders to complete an application form, provide necessary legal documents, and submit proof of their experience in the relevant field. Detailed registration guide can be found within the tender documents.

What formats are accepted for document submission?

Documents must be submitted in specified formats, which usually include PDF or Word files, as outlined in the bid submission guidelines. It is crucial to adhere to these requirements to ensure compliance.

What are the terms regarding the Earnest Money Deposit (EMD)?

The EMD details indicate the amount required to secure a bid, which is withheld until the selection process is complete. Bidders must submit this deposit along with their documents, as outlined in the tender instructions.