TenderDekho Logo
Closed GEM

Bharat Petroleum Corporation Limited Polyethylene Pipes Tender Sangli Maharashtra 2026 IS 14885 (Q3)

Bid Publish Date

29-Sep-2026, 7:17 pm

Bid End Date

09-Oct-2026, 7:00 pm

Progress

Issue29-Sep-2026, 7:17 pm
AwardPending

Key Highlights

  • • IS 14885 (Q3) compliance requirement for polyethylene pipes
  • • Option clause enabling ±25% quantity variation during contract
  • • Delivery-time extension formula: (additional quantity/original quantity) × original delivery period with 30-day minimum
  • • No BOQ items; emphasis on standard compliance and delivery discipline

Tender Overview

Bharat Petroleum Corporation Limited in Sangli, Maharashtra invites bids for Polyethylene Pipes intended for the supply of gaseous fuels, conforming to IS 14885 (Q3). The procurement focuses on piping materials within BPCL’s gas fuel distribution scope, with an emphasis on standard compliance rather than a fixed BOQ. The contract includes an option clause allowing a ±25% quantity adjustment at contract award and during the currency of the contract, with corresponding delivery-time calculations. The opportunity is anchored in BPCL’s ongoing gas infrastructure rollout in the region, with emphasis on timely delivery against contracted rates. The tender offers a clear mechanism to handle changes in demand while maintaining price integrity and delivery discipline. Unique elements include the option to scale quantities up to 25% and the requirement to align with IS 14885 (Q3) for gas pipelines.

Technical Specifications & Requirements

  • Product category: Polyethylene Pipes for gaseous fuels
  • Standard: IS 14885 (Q3) compliance
  • Quantity scope: 0 BOQ items listed; option clause enables 25% variation on bid quantity and contract quantity
  • Delivery terms: Delivery period linked to the last date of the original delivery order; extended-time calculation follows (increase in quantity ÷ original quantity) × original delivery period, min 30 days
  • Contract terms: Right to adjust quantities during contract; prices remain at contracted rates
  • Location relevance: Geared toward BPCL’s gas fuel distribution network in Maharashtra

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% at delivery and during the contract period
  • Delivery time logic: Extended delivery time min 30 days; calculated as described
  • EMD/Financials: Not specified in the provided data; bidders should refer to standard BPCL tender practices and ATC documents
  • Documents: Ensure submission of bidder qualification as per BPCL ATC and IS 14885 (Q3) compliance where applicable
  • Compliance: Align with internal BPCL procurement policies and IS standards for gas pipeline materials

Key Specifications

  • Polyethylene pipes for gaseous fuels

  • IS 14885 (Q3) compliance

  • Delivery within contract terms with option for 25% quantity variation

  • No fixed BOQ quantity; emphasis on supplier capability and timely delivery

  • Location: Sangli, Maharashtra; BPCL gas infrastructure context

Terms & Conditions

  • Option clause allows ±25% quantity change during contract at contracted rates

  • Delivery period adjusts based on quantity change with a 30-day minimum

  • IS 14885 (Q3) standard must be satisfied for pipes used in gas fuels

  • No BOQ items provided; bidder must contemplate variable quantities and delivery

Important Clauses

Payment Terms

Not specified in data; follow BPCL ATC and standard procurement norms

Delivery Schedule

Delivery starts from the last date of original delivery order; extended time based on quantity variation with a 30-day minimum

Penalties/Liquidated Damages

Not specified in data; refer to ATC for LD provisions and performance penalties

Bidder Eligibility

  • Experience in supplying polyethylene pipes for gas/fuel applications

  • Demonstrated capability to meet IS 14885 (Q3) standards

  • Financial stability with supporting turnover documentation

Advertisement

Authority & Contact

Tender Data

Bid Details

Quantity

70000

Category

Polyethylene Pipes For The Supply Of Gaseous Fuels (V2) As Per Is 14885

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

18

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Polyethylene Pipes For The Supply Of Gaseous Fuels (V2) As Per Is 14885 (Q3)

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Sangli

Delivery Pincodes

416416

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
KAUSTUBH NANA MAHIRE416416,Bharat Petroleum Corporation Ltd, Urmila Residency Ambrai road, College CornerSangliMaharashtra4164161000015-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9965158.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 3

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar polyethylene pipe supplies

4

Financial statements or turnover documents

5

EMD/Security deposit as per BPCL ATC (if specified in ATC)

6

Technical bid documents showing IS 14885 (Q3) compliance

7

OEM authorizations or certifications (if required by ATC)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid on polyethylene pipes tender in Sangli BPCL 2026

Bidders should prepare GST, PAN, experience certificates, financial statements, and EMD as per BPCL ATC. Ensure IS 14885 (Q3) compliance, submit OEM authorizations if required, and review the ATC for delivery-time calculations tied to the 25% quantity variation clause.

What documents are required for BPCL gas pipes bid in Maharashtra

Submit GST certificate, PAN, experience certificates for similar pipe supply, financial statements, EMD/Security, technical compliance documents showing IS 14885 (Q3) adherence, and OEM authorizations where applicable per BPCL ATC.

What are the IS 14885 (Q3) requirements for BPCL pipes

IS 14885 (Q3) compliance entails specification and testing criteria for polyethylene pipes used in gas fuel applications; bidders must demonstrate material grade, pressure rating, jointing method, and testing protocols validated to IS 14885 (Q3).

When is the delivery timeframe for BPCL Sangli pipes tender

Delivery begins after the original delivery order date; if quantity increases, extended delivery time is calculated as (increase/original quantity) × original period, with a minimum of 30 days as per option clause.

What is the purpose of the 25% option clause in BPCL tender

The option clause allows BPCL to adjust contract quantities by ±25% during placement and ongoing contract periods, with prices fixed at the contracted rate; bidders must plan scalable capacity and storage margins accordingly.

What are the eligibility criteria for BPCL pipe suppliers

Eligibility requires prior experience in similar pipe supply projects, IS 14885 (Q3) compliance demonstration, valid GST/PAN, and financial credibility evidenced by turnover documents; OEM authorizations may be required per ATC.

How to check ATC requirements for BPCL Maharashtra bids

Access the ATC document referenced in the tender notice; it specifies submission formats, EMD, technical compliance, delivery schedules, and any brand or OEM constraints for BPCL’s Sangli procurement.

What are the payment terms for BPCL gas pipe contracts

Payment terms are defined in the ATC; bidders should expect milestone-based payments aligned with delivery and acceptance, with any advance or security requirements stated in the ATC and substantive contract.

Advertisement