TenderDekho Logo
Closed GEM

Numaligarh Refinery Limited FOAM CONCENTRATE FOR MECHANICAL FOAM FIRE FIGHTING IS 4989 Q3 Tender Golaghat Assam 2026

Bid Publish Date

26-Sep-2026, 10:45 am

Bid End Date

14-Oct-2026, 11:00 am

Generate Docs

Progress

Issue26-Sep-2026, 10:45 am
Corrigendum07-Oct-2026
AwardPending

Key Highlights

  • • IS 4989 (Q3) compliant foam concentrate for firefighting
  • • Delivery quantity 10,000 Liters; bid per Liter in GeM
  • • Option to adjust quantity by up to 25% during contract/currency
  • • Pre Bid Meeting scheduled: 1 October 2026 at 3:00 PM (MS Teams)

Tender Overview

Numaligarh Refinery Limited seeks a single-supplier contract for FOAM CONCENTRATE FOR MECHANICAL FOAM FIRE FIGHTING (V2) conforming to IS 4989 (Q3) with a procurement quantity of 10,000 Liters for delivery at Golaghat, Assam. Bidders must quote a per-Liter rate through GeM, with the option to adjust quantity by up to 25% during contract and currency at contracted rates. A Pre Bid Meeting is scheduled via MS Teams on 1 October 2026, 3:00 PM. The ATC emphasizes that Technical specifications via attached documents are final unless corrigenda are issued. This tender prioritizes compliance with IS 4989 and GeM submission requirements.

Technical Specifications & Requirements

  • Product name/category: Foam concentrate for producing mechanical foam fire fighting (V2)
  • Standard: IS 4989 (Q3) compliant formulation
  • Quantity: 10,000 Liters tender quantity; quote per Liter rate
  • Delivery location: Golaghat, Assam 785601
  • Documentation: Signed ATC + Technical Specifications with unpriced bid; corrigenda to be issued via GeM only
  • Pre Bid Meeting: 1 October 2026, 3:00 PM via MS Teams; contact through provided email for link
  • Amendments: Any amendments communicated through corrigendum/addendum in this GeM tender
  • ATC compliance: Final technical specs as per NRL ATC; no unauthorised changes

Terms, Conditions & Eligibility

  • Option clause: Purchaser may increase/decrease quantity up to 25% at contracted rates
  • Delivery timelines: Extended delivery time rules based on quantity variation; minimum 30 days if original period is short
  • Bid submissions: Include filled ATC, Technical Specifications, and Annexures with unpriced bid
  • Bid modality: Quote per liter in GeM; ignore any auto-fetched KG description
  • ATC/documents: Execute and seal all stated ATC and technical annexures
  • Compliance: Bidders must follow all terms and any GeM amendments; delivery and quality must conform to IS 4989 (Q3) specifications

Key Specifications

  • Product: FOAM CONCENTRATE FOR MECHANICAL FOAM FIRE FIGHTING (V2)

  • Standards: IS 4989 (Q3) compliant

  • Quantity: 10,000 Liters

  • Unit price: required as per Liter bid rate

  • Delivery: Golaghat, Assam 785601

  • Documentation: ATC + Technical Specifications with annexures; corrigenda via GeM

Terms & Conditions

  • EMD not specified in summary; ensure GeM ATC compliance

  • Delivery schedule adjustable by 25% quantity variation

  • Pre Bid Meeting on 1 October 2026; MS Teams link via inquiry

  • Final technical specifications governed by NRL ATC documents

Important Clauses

Payment Terms

Payment terms to be as per GeM ATC; per-Liter rate quoted; post-delivery payment terms to be clarified in contract

Delivery Schedule

Delivery period linked to order date; extended time calculated as (Additional quantity / Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Penalty details to be defined in GeM ATC; LD provisions to be specified in final contract

Bidder Eligibility

  • Experience in supplying firefighting foam concentrates compliant with IS 4989 (Q3)

  • Financial stability evidenced by recent financial statements

  • GST and PAN compliant bidder with OEM authorizations if required

Advertisement

Authority & Contact

Office Name

Numaligarh Refinery Limited

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

10000

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

FOAM CONCENTRATE FOR PRODUCING MECHANICAL FOAM FOR FIRE FIGHTING (V2) Conforming to IS 4989 (Q3)

Advisory Bank

AXIS BANK LTD

ePBG Percentage

3%

ePBG Duration (Months)

21

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Golaghat

Delivery Pincodes

785699

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Dibakar Barhoi785699,Numaligarh Refinery Limited, Chief General Manager (Commercial) PO-NRP, Numaligarh Warehouse office 03776-265562GolaghatAssam78569910000180-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASNUMALIGARH REFINERY LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9949653.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 2

Advertisement

Corrigendum Updates

4 Updates
#1

Update

07-Oct-2026
#2

Update

07-Oct-2026

Extended Deadline

14-Oct-2026, 5:30 am

Opening Date

15-Oct-2026, 5:30 am

#3

Update

07-Oct-2026

Extended Deadline

12-Oct-2026, 5:30 am

Opening Date

13-Oct-2026, 5:30 am

#4

Update

30-Sep-2026

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar foam concentrate supply

4

Financial statements demonstrating financial capacity

5

EMD/Security deposit documents (as per GeM ATC requirements)

6

Technical bid documents and OEM authorizations (if applicable)

7

Signed ATC document and Technical Specifications with Annexures

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for the foam concentrate tender in Golaghat Assam 2026?

Bidders must submit ATC and Technical Specifications with an unpriced bid, provide OEM authorizations if applicable, and quote a per Liter rate for the 10,000 Liter quantity. Ensure IS 4989 (Q3) compliance and participate via GeM with the required documents.

What documents are required for the foam concentrate tender in Assam?

Required documents include GST registration, PAN, experience certificates in firefighting foam supply, financial statements, EMD, and signed ATC + Technical Specifications with Annexures; OEM authorizations if applicable and any GeM-specific forms.

What are the key technical standards for IS 4989 foam concentrate?

The tender requires foam concentrate compliant with IS 4989 (Q3), as stated in the ATC. Bidders must ensure product formulation meets firefighting performance criteria under this standard and verify via OEM data sheets.

When is the pre-bid meeting for the Assam foam tender?

The pre-bid meeting is scheduled for 1 October 2026 at 3:00 PM, conducted via MS Teams. Bidders should email the contact to receive the meeting link and share any initial questions.

What is the quantity and pricing format for this GeM tender?

Tender quantity is 10,000 Liters. Bidders must quote a per Liter rate in GeM. The contract allows up to 25% quantity variation with corresponding delivery time adjustments.

What delivery location and terms apply to the foam concentrate contract?

Delivery is to Golaghat, Assam 785601. Delivery timelines follow the option clause and the minimum 30-day rule; any amendments will be posted via GeM corrigenda.

Are there any OEM or brand requirements for the foam concentrate?

The ATC emphasizes adherence to documented technical specifications; OEM authorization may be required if specified in the attached ATC. Verify IS 4989 (Q3) conformity and obtain manufacturer confirmation where needed.

Advertisement