Progress
A tender has been published for Tea Board Solar DCR PV Modules, Solar On Grid PCU Inverter 10 kW 3 Phase, Copper Earthing Rod 1 point 5 Meter, Chemical Earthing Compound 15 Kg, Copper Bonded Lightning Arrestor LA, ACDB 3 Phase, DCDB 3 Phase, Elevated GI Structure for 10 kW Solar System, Balance of System BOS Materials as required for site, installation charges in SONITPUR, ASSAM. Quantity: 31 by. Submission Deadline: 25-09-2026 15: 00: 00. Check eligibility and apply.
Quantity
31
Category
Solar On Grid PCU Inverter 10 kW 3 Phase
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Solar DCR PV Modules , Solar On Grid PCU Inverter 10 kW 3 Phase , Copper Earthing Rod 1 point 5 Meter , Chemical Earthing Compound 15 Kg , Copper Bonded Lightning Arrestor LA , ACDB 3 Phase , DCDB 3 Phase , Elevated GI Structure for 10 kW Solar System , Balance of System BOS Materials as required for site , installation charges
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
6
Pre-Bid Date
16-09-2026 11:00:00
Pre-Bid Venue
vendor will display samples at consignee location at the time of pre bid meeting
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Sonitpur
Delivery Pincodes
784001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ashish Kumar Sen | 784001,Tea Board Regional Office Tezpur (Opposite Election Office) P.O-Tezpur, Dist-Sonitpur | Sonitpur | Assam | 784001 | 18 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Solar DCR PV Modules
AS PER TECHNICAL SPECIFICATION
Solar On Grid PCU Inverter 10 kW 3 Phase
AS PER TECHNICAL SPECIFICATION
Copper Earthing Rod 1 point 5 Meter
AS PER TECHNICAL SPECIFICATION
Chemical Earthing Compound 15 Kg
AS PER TECHNICAL SPECIFICATION
Copper Bonded Lightning Arrestor LA
AS PER TECHNICAL SPECIFICATION
ACDB 3 Phase
AS PER TECHNICAL SPECIFICATION
DCDB 3 Phase
AS PER TECHNICAL SPECIFICATION
Elevated GI Structure for 10 kW Solar System
AS PER TECHNICAL SPECIFICATION
Balance of System BOS Materials as required for site
AS PER TECHNICAL SPECIFICATION
installation charges
AS PER TECHNICAL SPECIFICATION
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Solar DCR PV Modules | AS PER TECHNICAL SPECIFICATION | 18 | nos | rotezpur | 30 | |
| 2 | Solar On Grid PCU Inverter 10 kW 3 Phase | AS PER TECHNICAL SPECIFICATION | 1 | nos | rotezpur | 30 | |
| 3 | Copper Earthing Rod 1 point 5 Meter | AS PER TECHNICAL SPECIFICATION | 3 | nos | rotezpur | 30 | |
| 4 | Chemical Earthing Compound 15 Kg | AS PER TECHNICAL SPECIFICATION | 3 | bags | rotezpur | 30 | |
| 5 | Copper Bonded Lightning Arrestor LA | AS PER TECHNICAL SPECIFICATION | 1 | set | rotezpur | 30 | |
| 6 | ACDB 3 Phase | AS PER TECHNICAL SPECIFICATION | 1 | nos | rotezpur | 30 | |
| 7 | DCDB 3 Phase | AS PER TECHNICAL SPECIFICATION | 1 | nos | rotezpur | 30 | |
| 8 | Elevated GI Structure for 10 kW Solar System | AS PER TECHNICAL SPECIFICATION | 1 | set | rotezpur | 30 | |
| 9 | Balance of System BOS Materials as required for site | AS PER TECHNICAL SPECIFICATION | 1 | lot | rotezpur | 30 | |
| 10 | installation charges | AS PER TECHNICAL SPECIFICATION | 1 | job | rotezpur | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer