Bulb 12V 21W,Lamp 24V,Lamp 24V 21W,Bulb 12V for indicator,Cover Assy
Indian Army
KINNAUR, HIMACHAL PRADESH
Progress
Quantity
1162
Category
1LAMP INDICATOR
Bid Type
Two Packet Bid
Bharat Earth Movers Limited (BEML), under the Department of Defence Production, invites bids for five item categories listed as lamp indicators and lamp assemblies, located in Kolar, Karnataka. Estimated value and EMD are not disclosed. The scope references items such as 1LAMP INDICATOR, 2SWITCH NEUTRAL SAFTY, 3DASH LAMP 24V, 4CHARGE LAMP INDICATOR, 5LAMP ASSY. This project-specific procurement targets approved BEML vendors who have prior experience supplying to BEML/KGF. Key differentiator: project-item status and restricted vendor registration, with delivery terms governed by option clauses and contract quantities.
Product/service names: lamp indicators and lamp assemblies for 24V systems
Quantities: 5 items in BOQ; exact quantities not disclosed
EMD/Estimated value: Not disclosed in tender data
Experience: prior supply to BEML/MKTG DIVISION KGF required
Standards/Testing: Not specified in data; rely on OEM/industry standards applicable to automotive/rail lighting
Delivery: to BEML Limited KGF Marketing Stores Spares, Kolar Gold Fields
Warranty/Support: Not specified in data; rely on standard OEM warranty terms
Brand/OEM: Not specified; vendor registration required via bemlindia.in
Option clause allows 50% quantity variation during contract
Delivery time scales with formula, minimum 30 days
BEML-approved vendor requirement; only registered vendors may quote
Technical bid must detail specifications; price breakups in commercial bid
Delivery address and contact for clarification provided
Not specified in data; payment terms expected per standard BEML practice and contract
Delivery period starts from last date of original delivery order; extended periods based on increased quantity with minimum 30 days
Not specified in data; penalties may be governed by standard contract terms and option clause usage
Must be an approved BEML vendor or registered via bemlindia.in
Experience supplying lamp indicators/lamp assemblies to manufacturing units (preferably BEML/KGF)
Sign and seal all documents; submit with both technical and commercial bids
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
1LAMP INDICATOR , 2SWITCH NEUTRAL SAFTY , 3DASH LAMP 24V , 4CHARGE LAMP INDICATOR , 5LAMP ASSY
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
KOLAR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | KOLAR | KOLAR | - | - | 18 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KINNAUR, HIMACHAL PRADESH
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Air Force
NAGPUR, MAHARASHTRA
Indian Army
ANANTHNAG, JAMMU & KASHMIR
Indian Army
Tender Results
Loading results...
1LAMP INDICATOR
LAMP INDICATOR
2SWITCH NEUTRAL SAFTY
SWITCH NEUTRAL SAFTY
3DASH LAMP 24V
DASH LAMP 24V
4CHARGE LAMP INDICATOR
CHARGE LAMP INDICATOR
5LAMP ASSY
LAMP ASSY
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 1LAMP INDICATOR | LAMP INDICATOR | 18 | pieces | mohan_k@beml | 60 | |
| 2 | 2SWITCH NEUTRAL SAFTY | SWITCH NEUTRAL SAFTY | 147 | pieces | mohan_k@beml | 60 | |
| 3 | 3DASH LAMP 24V | DASH LAMP 24V | 21 | pieces | mohan_k@beml | 60 | |
| 4 | 4CHARGE LAMP INDICATOR | CHARGE LAMP INDICATOR | 32 | pieces | mohan_k@beml | 60 | |
| 5 | 5LAMP ASSY | LAMP ASSY | 944 | pieces | mohan_k@beml | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about KARNATAKA tender market
Bidders must be BEML-approved or register on bemlindia.in, submit technical bid with detailed specifications for the five lamp items, and upload price breakup in the commercial bid. Ensure documents bear firm seal and align with ATC instructions; delivery is to KGF, with potential quantity fluctuations up to 50%.
Required items include GST certificate, PAN, experience certificates, financial statements, EMD as applicable, OEM authorizations, and technical compliance certificates. All documents must be signed and sealed, and related to the five lamp-category items; ensure vendor registration if not approved.
Delivery begins after the original order date; if quantity increases, the extended period is calculated as (increased/original) × original delivery period, with a minimum of 30 days. The purchaser may extend the period up to the original delivery time while exercising the option clause.
Specific standards are not listed in the data; bidders should reference OEM specifications and industry norms for 24V lamp indicators, and provide any applicable certifications (OEM, ISO, or BIS) per the item requirements and ATC guidance.
Only BEML-approved vendors may quote; new vendors must complete vendor registration on the official site. Prior experience supplying to BEML/MKTG DIVISION KGF strengthens eligibility; technical bid should focus on the five lamp items and their compatibility with 24V systems.
Price details must be uploaded in the Commercial bid; the Technical bid should not include prices, to prevent rejection. Ensure the price breakup aligns with itemized components and that the total aligns with the contract value if awarded.
Delivery timelines depend on the last date of the original delivery order and any option-based extensions. The minimum extended period is 30 days, with potential further extension to meet original delivery time when the quantity adjusts under the option clause.
Indian Army
📍 TAWANG, ARUNACHAL PRADESH
Indian Army
📍 BIKANER, RAJASTHAN
Indian Army
📍 Ajmer, RAJASTHAN
Indian Army
📍 UDHAMPUR, JAMMU & KASHMIR
Indian Army
📍 FARIDKOT, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS