Progress
RAIndian Air Force announces a tender for Bullet CCTV Camera, Dome CCTV Camera, 08 CH NVR, 16 CH NVR, HDD 08 TB, HDD 12 TB, Cat -6 cable, POE Switch, SFP Module, PVC Conduit Pipe, HDPE Pipe, 4U Rack, Display 32 inch, Display 43 inch, 2 Core Power Cable, Spike Buster, PVC Box, OFC Cable, HDMI Cable, Network Giga Switch, Wireless Mouse, USB Extn cable, Display Wall Stand, RJ 45 Connectors, 3 KV Invertor with 02 batteries, Invertor Stand, Digging work, Installation and Commisioning Caharge in SIRSA, HARYANA. Quantity: 43429. Submission Deadline: 18-07-2026 21: 00: 00. Last date to apply is approaching fast!
Start
18-Aug-2026, 8:00 pm
End
20-Aug-2026, 10:00 am
Duration: 38 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
43429
Category
Bullet CCTV Camera
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
20
OEM Avg. Turnover
20
Past Performance
70 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Bullet CCTV Camera , Dome CCTV Camera , 08 CH NVR , 16 CH NVR , HDD 08 TB , HDD 12 TB , Cat -6 cable , POE Switch , SFP Module , PVC Conduit Pipe , HDPE Pipe , 4U Rack , Display 32 inch , Display 43 inch , 2 Core Power Cable , Spike Buster , PVC Box , OFC Cable , HDMI Cable , Network Giga Switch , Wireless Mouse , USB Extn cable , Display Wall Stand , RJ 45 Connectors , 3 KV Invertor with 02 batteries , Invertor Stand , Digging work , Installation and Commisioning Caharge
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
26
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
SIRSA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SIRSA | SIRSA | - | - | 53 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Bullet CCTV Camera
5/6 MP Bullet CCTV Camera
Dome CCTV Camera
5/6 MP Dome CCTV Camera
08 CH NVR
NVR
16 CH NVR
NVR
HDD 08 TB
HDD
HDD 12 TB
HDD
Cat -6 cable
Cat-6 UTP cable
POE Switch
08 Port
SFP Module
SFP
PVC Conduit Pipe
PVC Conduit Pipe
HDPE Pipe
Outdoor HDPE Pipe
4U Rack
Weather Proof Rack
Display 32 inch
Commercial LED TV
Display 43 inch
Commercial LED TV
2 Core Power Cable
Power cable
Spike Buster
Suppoprt upto 15 Ampere
PVC Box
Out Door weather proof
OFC Cable
Fiber Cable 8 core
HDMI Cable
5 mtrs
Network Giga Switch
Giga Switch
Wireless Mouse
Optical Mouse
USB Extn cable
USB Extn Cable
Display Wall Stand
SS Wall Stand
RJ 45 Connectors
RJ 45 Connectors
3 KV Invertor with 02 batteries
3 KV Invertor with 02 batteries
Invertor Stand
Invertor Stand
Digging work
Digging work
Installation and Commisioning Caharge
Installation and Commisioning Caharge
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Bullet CCTV Camera | 5/6 MP Bullet CCTV Camera | 53 | pieces | sec-alpha | 30 | |
| 2 | Dome CCTV Camera | 5/6 MP Dome CCTV Camera | 47 | pieces | sec-alpha | 30 | |
| 3 | 08 CH NVR | NVR | 6 | pieces | sec-alpha | 30 | |
| 4 | 16 CH NVR | NVR | 6 | pieces | sec-alpha | 30 | |
| 5 | HDD 08 TB | HDD | 13 | pieces | sec-alpha | 30 | |
| 6 | HDD 12 TB | HDD | 10 | pieces | sec-alpha | 30 | |
| 7 | Cat -6 cable | Cat-6 UTP cable | 6,690 | meters | sec-alpha | 30 | |
| 8 | POE Switch | 08 Port | 58 | pieces | sec-alpha | 30 | |
| 9 | SFP Module | SFP | 68 | pieces | sec-alpha | 30 | |
| 10 | PVC Conduit Pipe | PVC Conduit Pipe | 640 | pieces | sec-alpha | 30 | |
| 11 | HDPE Pipe | Outdoor HDPE Pipe | 12,390 | meters | sec-alpha | 30 | |
| 12 | 4U Rack | Weather Proof Rack | 57 | pieces | sec-alpha | 30 | |
| 13 | Display 32 inch | Commercial LED TV | 4 | pieces | sec-alpha | 30 | |
| 14 | Display 43 inch | Commercial LED TV | 9 | pieces | sec-alpha | 30 | |
| 15 | 2 Core Power Cable | Power cable | 4,790 | meters | sec-alpha | 30 | |
| 16 | Spike Buster | Suppoprt upto 15 Ampere | 38 | pieces | sec-alpha | 30 | |
| 17 | PVC Box | Out Door weather proof | 101 | pieces | sec-alpha | 30 | |
| 18 | OFC Cable | Fiber Cable 8 core | 13,280 | meters | sec-alpha | 30 | |
| 19 | HDMI Cable | 5 mtrs | 14 | pieces | sec-alpha | 30 | |
| 20 | Network Giga Switch | Giga Switch | 6 | pieces | sec-alpha | 30 | |
| 21 | Wireless Mouse | Optical Mouse | 14 | pieces | sec-alpha | 30 | |
| 22 | USB Extn cable | USB Extn Cable | 14 | pieces | sec-alpha | 30 | |
| 23 | Display Wall Stand | SS Wall Stand | 13 | pieces | sec-alpha | 30 | |
| 24 | RJ 45 Connectors | RJ 45 Connectors | 222 | pieces | sec-alpha | 30 | |
| 25 | 3 KV Invertor with 02 batteries | 3 KV Invertor with 02 batteries | 8 | pieces | sec-alpha | 30 | |
| 26 | Invertor Stand | Invertor Stand | 8 | pieces | sec-alpha | 30 | |
| 27 | Digging work | Digging work | 4,770 | meters | sec-alpha | 30 | |
| 28 | Installation and Commisioning Caharge | Installation and Commisioning Caharge | 100 | pieces | sec-alpha | 30 |
Extended Deadline
18-Jul-2026, 3:30 pm
Opening Date
18-Jul-2026, 4:00 pm
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer