TenderDekho Logo
Closed GEM

Contract Bidding Open For Superstructure for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M in KAMRUP, ASSAM

Bid Publish Date

29-Apr-2025, 11:59 pm

Bid End Date

24-May-2025, 9:00 pm

EMD

₹30,00,000

Location

Generate Docs

Progress

RA
Issue29-Apr-2025, 11:59 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

2821

Bid Type

Two Packet Bid

Categories 55

Indian Army announces a tender for Superstructure for 03 x Double Storey Living Shelter 28 Students Capacity of size 24. 596M x 11. 146M in KAMRUP, ASSAM. Quantity: 2821. Submission Deadline: 24-05-2025 21: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7788656.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 75 Items Sign in for GEM prices

#1

Superstructure for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M x 3.00m Height including as per technical specification and drawings attached

Superstructure for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M x 3.00m Height including as per technical specification and drawings attached

3 nos Delivery: 180 days
#2

Superstructure for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification and drawings attached

Superstructure for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification and drawings attached

1 nos Delivery: 180 days
#3

Construction material for 03 x Double Storey Living Shelter 28 Students

Construction material for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M x 3.00m Height including Precast foundation and Plinth Protection and Sewage System and Flooring MS Staging Work Manhole etc as per technical specification and drawings attached

3 nos Delivery: 180 days
#4

Construction material for 01 x Double Storey Living Shelter 36 Students

Construction material for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height including Precast foundation and Plinth Protection and Sewage System and Flooring and MS Staging Work and Manhole etc as per technical specification and drawings attached

1 nos Delivery: 180 days
#5

Ceiling Fans sweep 1400 mm

Ceiling Fans sweep 1400 mm

108 nos Delivery: 180 days
#6

Ceiling Fans regulator

Ceiling Fans regulator

108 nos Delivery: 180 days
#7

LED concealed ceiling light 600mm x 600mm For Cabins

LED concealed ceiling light 600mm x 600mm For Cabins

108 nos Delivery: 180 days
#8

LED Tube Light 600mm For Bath Room

LED Tube Light 600mm For Bath Room

96 nos Delivery: 180 days
#9

LED Light 1200mm For open area including corridor and staircase

LED Light 1200mm For open area including corridor and staircase

90 nos Delivery: 180 days
#10

LED Halogen street light 64 W

LED Halogen street light 64 W

18 nos Delivery: 180 days
#11

Switch socket combination 5 pin 5 Amps cum 15 Amp with concealed metal box

Switch socket combination 5 pin 5 Amps cum 15 Amp with concealed metal box

90 nos Delivery: 180 days
#12

Switch socket combination 5 pin 5 Amps with concealed metal box

Switch socket combination 5 pin 5 Amps with concealed metal box

180 nos Delivery: 180 days
#13

Switch 6 Amp with ISI mark

Switch 6 Amp with ISI mark

318 nos Delivery: 180 days
#14

MCB 10 Amp SP and 240 Volts and B Series

MCB 10 Amp SP and 240 Volts and B Series

24 nos Delivery: 180 days
#15

MCB 20Amp SP and 240 and Volts B Series

MCB 20Amp SP and 240 and Volts B Series

12 nos Delivery: 180 days
#16

MCB 25 Amp SP and 240 Volts B Series

MCB 25 Amp SP and 240 Volts B Series

9 nos Delivery: 180 days
#17

MCB TPN 100 Amp

MCB TPN 100 Amp

3 nos Delivery: 180 days
#18

MCB Distribution box double door SPN 12 way with copper din rail for earth and neutral

MCB Distribution box double door SPN 12 way with copper din rail for earth and neutral

3 nos Delivery: 180 days
#19

MCB Distribution box double door TPN 4 way with copper din rail for earth and neutral

MCB Distribution box double door TPN 4 way with copper din rail for earth and neutral

6 nos Delivery: 180 days
#20

E and M Items for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M x 3.00m Height including as per technical specification attached

E and M Items for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M x 3.00m Height including as per technical specification attached

3 nos Delivery: 180 days
#21

Ceiling Fans sweep 1400 mm

Ceiling Fans sweep 1400 mm

44 nos Delivery: 180 days
#22

Ceiling Fans regulator

Ceiling Fans regulator

48 nos Delivery: 180 days
#23

LED concealed ceiling light 600mm x 600mm For Cabins

LED concealed ceiling light 600mm x 600mm For Cabins

50 nos Delivery: 180 days
#24

LED Tube Light 600mm For Bath Room

LED Tube Light 600mm For Bath Room

40 nos Delivery: 180 days
#25

LED Light 1200mm For open area including corridor and staircase

LED Light 1200mm For open area including corridor and staircase

36 nos Delivery: 180 days
#26

LED Halogen street light 64 W

LED Halogen street light 64 W

8 nos Delivery: 180 days
#27

Switch socket combination 5 pin 5 Amps cum 15 Amp with concealed metal box

Switch socket combination 5 pin 5 Amps cum 15 Amp with concealed metal box

10 nos Delivery: 180 days
#28

Switch socket combination 5 pin 5 Amps with con- ceiled metal box

Switch socket combination 5 pin 5 Amps with con- ceiled metal box

40 nos Delivery: 180 days
#29

Switch 6 Amp with ISI mark

Switch 6 Amp with ISI mark

106 nos Delivery: 180 days
#30

MCB 10 Amp SP and 240 Volts and B Series

MCB 10 Amp SP and 240 Volts and B Series

8 nos Delivery: 180 days
#31

MCB 20Amp SP and 240 Volts B Series

MCB 20Amp SP and 240 Volts B Series

4 nos Delivery: 180 days
#32

MCB 25 Amp SP and 240 Volts and B Series

MCB 25 Amp SP and 240 Volts and B Series

3 nos Delivery: 180 days
#33

MCB TPN 100 Amp

MCB TPN 100 Amp

1 nos Delivery: 180 days
#34

MCB Distribution box double door SPN 12 way with copper din rail for earth and neutral

MCB Distribution box double door SPN 12 way with copper din rail for earth and neutral

1 nos Delivery: 180 days
#35

MCB Distribution box double door TPN 4 way with copper din rail for earth and neutral

MCB Distribution box double door TPN 4 way with copper din rail for earth and neutral

2 nos Delivery: 180 days
#36

E andM Items for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

E and M Items for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

1 nos Delivery: 180 days
#37

Lightning conductor items for 03 x Double Storey Living Shelter 28 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

Lightning conductor items for 03 x Double Storey Living Shelter 28 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

3 nos Delivery: 180 days
#38

Lightning conductor Items for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

Lightning conductor Items for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

1 nos Delivery: 180 days
#39

Earthing Set items for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M x 3.00m Height as per technical specification attached

Earthing Set items for 03 x Double Storey Living Shelter 28 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

3 nos Delivery: 180 days
#40

Earthing Set Items for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

Earthing Set Items for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

1 nos Delivery: 180 days
#41

Ball type fire extinguishers powder type having 2 kg capacity

Ball type fire extinguishers powder type having 2 kg capacity conforming to IS 13849 along with its accessories and fixing arrangements on wall Make Cease Fire and AFO and Elide Fire Ball with ISI marks and having shelf life of minimum one year

70 nos Delivery: 180 days
#42

EWC of size 580mm x 440mm with cistern 10 ltrs

EWC of size 580mm x 440mm with cistern 10 ltrs cap flushing cistern PVC complete with entire accessories as per good engineering practice Make Jaquar and Cera and Hindware and Parryware

24 nos Delivery: 180 days
#43

WHB of size 400mm x 400mm including MS stand and PVC HDPE pipe 32mm dia etc complete Make Jaquar and Cera and Hindware and Parryware

WHB of size 400mm x 400mm including MS stand and PVC HDPE pipe 32mm dia etc complete Make Jaquar and Cera and Hindware and Parryware

42 nos Delivery: 180 days
#44

CP Bib Cock of 15mm bore Short Body Make Jaquar and Hindware and Parryware

CP Bib Cock of 15mm bore Short Body Make Jaquar and Hindware and Parryware

42 nos Delivery: 180 days
#45

CP Stop Cock of 15mm bore Make Jaquar and Hindware and Parryware

CP Stop Cock of 15mm bore Make Jaquar and Hindware and Parryware

72 nos Delivery: 180 days
#46

Shower with wall mixture with bib cock Long Body

Shower with wall mixture with bib cock Long Body

24 nos Delivery: 180 days
#47

CP Soap Dish of 100mm dia

CP Soap Dish of 100mm dia

96 nos Delivery: 180 days
#48

CP Pillar Cock 15mm dia Make Jaquar and Hindware and Parryware

CP Pillar Cock 15mm dia Make Jaquar and Hindware and Parryware

42 nos Delivery: 180 days
#49

PVC insulated connection 15mm dia 450mm long

PVC insulated connection 15mm dia 450mm long

72 nos Delivery: 180 days
#50

Stainless steel jali with hole for waste pipe of 100mm with ISI mark

Stainless steel jali with hole for waste pipe of 100mm with ISI mark

42 nos Delivery: 180 days
#51

Stainless Steel jali without hole for waste pipe of 100mm with ISI mark

Stainless Steel jali without hole for waste pipe of 100mm with ISI mark

24 nos Delivery: 180 days
#52

Geyser of 25 Ltr Capacity Make Havelles and Hindware and Crompton and V Guard and Bajaj

Geyser of 25 Ltr Capacity Make Havelles and Hindware and Crompton and V Guard and Bajaj

24 nos Delivery: 180 days
#53

Decorative oval shape Looking Mirror 5.5mm thick of size 450 x 600mm Make Saint Gobain and Modi Guard and Dura Fit confirming to ISI Standard

Decorative oval shape Looking Mirror 5.5mm thick of size 450 x 600mm Make Saint Gobain and Modi Guard and Dura Fit confirming to ISI Standard

42 nos Delivery: 180 days
#54

Peg set of six fitted with galvanised screws along the internal surface of the walls in the roomsMake Ess Ess and Prayag and Johnson Suisse

Peg set of six fitted with galvanised screws along the internal surface of the walls in the roomsMake Ess Ess and Prayag and Johnson Suisse

96 nos Delivery: 180 days
#55

SS Round Hand Towel Holder length 600mm

SS Round Hand Towel Holder length 600mm

42 nos Delivery: 180 days
#56

PVC water tanks of 1000 Ltr capacity

PVC water tanks of 1000 Ltr capacity

15 nos Delivery: 180 days
#57

PPR Items for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M x 3.00m Height including as per technical specification attatched

PPR Items for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M x 3.00m Height including as per technical specification attatched

3 nos Delivery: 180 days
#58

EWC of size 580mm x 440mm with cistern 10 ltrs cap flushing cistern PVC complete with entire accessories as per good engineering practice Make Jaquar and Cera and

EWC of size 580mm x 440mm with cistern 10 ltrs cap flushing cistern PVC complete with entire accessories as per good engineering practice Make Jaquar and Cera and

10 nos Delivery: 180 days
#59

WHB of size 400mm x 400mm including MS stand and PVC HDPE pipe 32mm dia etc complete Make Jaquar and Cera and Hindware and Parryware

WHB of size 400mm x 400mm including MS stand and PVC HDPE pipe 32mm dia etc complete Make Jaquar and Cera and Hindware and Parryware

18 nos Delivery: 180 days
#60

CP Bib Cock of 15mm bore Short Body

CP Bib Cock of 15mm bore Short Body

18 nos Delivery: 180 days
#61

CP Stop Cock of 15mm bore Make Jaquar and Hindware and Parryware

CP Stop Cock of 15mm bore Make Jaquar and Hindware and Parryware

10 nos Delivery: 180 days
#62

Shower with wall mixture with bib cock Long Body

Shower with wall mixture with bib cock Long Body

10 nos Delivery: 180 days
#63

CP Soap Dish of 100mm dia

CP Soap Dish of 100mm dia

40 nos Delivery: 180 days
#64

CP Pillar Cock 15mm dia Make Jaquar and Hindware and Parryware

CP Pillar Cock 15mm dia Make Jaquar and Hindware and Parryware

18 nos Delivery: 180 days
#65

PVC insulated connection 15mm dia 450mm long

PVC insulated connection 15mm dia 450mm long

30 nos Delivery: 180 days
#66

Stainless steel jali with hole for waste pipe of 100mm with ISI mark

Stainless steel jali with hole for waste pipe of 100mm with ISI mark

18 nos Delivery: 180 days
#67

Stainless Steel jali without hole for waste pipe of 100mm with ISI mark

Stainless Steel jali without hole for waste pipe of 100mm with ISI mark

10 nos Delivery: 180 days
#68

Geyser of 25 Ltr Capacity Make Havelles and Hindware and Crompton and V Guard and Bajaj

Geyser of 25 Ltr Capacity Make Havelles and Hindware and Crompton and V Guard and Bajaj

10 nos Delivery: 180 days
#69

Decorative oval shape Looking Mirror 5.5mm thick of size 450 x 600mm Make Saint Gobain and Modi Guard and Dura Fit confirming to ISI Standard

Decorative oval shape Looking Mirror 5.5mm thick of size 450 x 600mm Make Saint Gobain and Modi Guard and Dura Fit confirming to ISI Standard

18 nos Delivery: 180 days
#70

Peg set of six fitted with galvanised screws along the internal surface of the walls in the rooms Make Ess Ess and Prayag and Johnson Suisse

Peg set of six fitted with galvanised screws along the internal surface of the walls in the rooms Make Ess Ess and Prayag and Johnson Suisse

40 nos Delivery: 180 days
#71

SS Round Hand Towel Holder length 600mm

SS Round Hand Towel Holder length 600mm

18 nos Delivery: 180 days
#72

PVC water tanks of 1000 Ltr capacity Make Sintex and Supreme and Prince and Vectus and Plasto and Ashirvad

PVC water tanks of 1000 Ltr capacity Make Sintex and Supreme and Prince and Vectus and Plasto and Ashirvad

6 nos Delivery: 180 days
#73

PPR Items for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

PPR Items for 01 x Double Storey Living Shelter 36 Students Capacity of size 31.691M x 11.146M x 3.00m Height as per technical specification attached

1 nos Delivery: 180 days
#74

Individual standalone plastic body smoke alarm

Individual standalone plastic body smoke alarm with adequate provision for fixing on wall and ceiling and roof The unit to have sensor capable of covering area 40m2 and actuating an inbuilt alarm with loudness minimum 80 DB smoke alarm be powered by 9 Volt lithium batteries with an arrangement to test the battery and indicator to warn for low battery including supply two Nos of battery Make Fire End and AFO and Safe Guard

90 nos Delivery: 180 days
#75

Individual standalone plastic body heat alarm

Individual standalone plastic body heat alarm with adequate provision for fixing on wall and ceiling and roof The unit to have sensor capable of detecting fixed temperature of 58oC and actuating an inbuilt alarm powered by 9 Volt lithium batteries with an arrangement to test the battery and indicator to warn for low battery including supply two No of battery Make Fire End and AFO and Safe Guard

90 nos Delivery: 180 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

18-May-2025
#2

Update

17-May-2025

Extended Deadline

24-May-2025, 9:00 pm

Opening Date

24-May-2025, 9:30 pm

Reverse Auction Schedule

Completed

Start

29-May-2025, 2:00 am

End

30-May-2025, 10:00 am

Duration: 32 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
ACOBUILD   Under PMA
-24-05-2025 17:50:28
2
EXPERTSOUL LLP   Under PMA
-24-05-2025 18:50:13
3
J R INFRATECH   Under PMA
-24-05-2025 19:56:49
4
M/S SUBHADRA STEEL   Under PMA
-23-05-2025 17:53:50
5
MODERN PREFAB SYSTEMS PRIVATE LIMITED   Under PMA
-23-05-2025 18:30:58
6
NATIONAL INFRAINDUSTRIES LIMITED   Under PMA
-24-05-2025 13:57:37
7
NIPANI INFRA AND INDUSTRIES PRIVATE LIMITED   Under PMA
-24-05-2025 13:48:01
8
SPEED 4 DEFENCE SYSTEMS PRIVATE LIMITED   Under PMA
-24-05-2025 14:10:18

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1NIPANI INFRA AND INDUSTRIES PRIVATE LIMITED(MII)   Under PMA Winner ₹10,99,61,700Item Categories : Superstructure for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M
L2NATIONAL INFRAINDUSTRIES LIMITED (MSE,MII)   Under PMA₹11,25,50,000Item Categories : Superstructure for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M
L3MODERN PREFAB SYSTEMS PRIVATE LIMITED (MSE,MII)   Under PMA₹12,83,65,176Item Categories : Superstructure for 03 x Double Storey Living Shelter 28 Students Capacity of size 24.596M x 11.146M

🎉 L1 Winner

NIPANI INFRA AND INDUSTRIES PRIVATE LIMITED(MII)   Under PMA

Final Price: ₹10,99,61,700

Frequently Asked Questions

Key insights about ASSAM tender market

What are the eligibility requirements for this tender?

The eligibility requirements for participating in this tender include being a registered entity equipped with the necessary licensing for construction activities. Contractors are expected to possess experience in similar project implementations and must meet local content requirements in compliance with the Make in India initiative.

What certificates are required for this tender?

Bidders must submit documents showcasing their registration and licensing for construction. Certificates related to quality assurance, compliance with safety regulations, and any other certifications relevant to the project scope must also be included to ensure eligibility.

What is the registration process for this tender?

Contractors interested in responding to the tender must register their entities on the relevant procurement platform as stipulated by the Department of Military Affairs. This includes creating an account, completing necessary profiling, and ensuring all documentation is uploaded in compliance with submission guidelines.

What formats are accepted for the documentation submission?

All documentation must be submitted in specified formats which typically include PDF for detailed proposals and spreadsheets for financial bids. Bidders are advised to review the tender document for specific formatting instructions to ensure their submissions are compliant.

What are the payment terms outlined for this tender?

Payment terms typically include an initial advance payment post-award, milestone payments based on project progress, and final payment upon satisfactory completion and inspection of the entire work as per the contract terms. Bidders should ensure they clearly understand these terms before submitting their proposals.