TenderDekho Logo
Closed GEM

NTPC Limited Moisture Analyzer Tender in Gautam Buddhanagar Uttar Pradesh 2025

Bid Publish Date

05-Dec-2025, 4:09 pm

Bid End Date

01-Jan-2026, 4:00 pm

Generate Docs

Progress

Issue05-Dec-2025, 4:09 pm
Technical18-12-2025 14:25:06
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirements not specified in the tender data
  • Technical certifications or standards are not listed; bidder should verify GeM ATC
  • Turnkey delivery: installation and commissioning included within 3 months
  • EMD and estimated value are not disclosed; monitor GeM for updates
  • GeM-only communication; centralized tender management
  • Location-specific procurement: Gautam Buddha Nagar, Uttar Pradesh

Categories 3

Tender Overview

NTPC Limited invites bids for procurement of Two Set of Moisture Analyzer to be supplied, installed, and commissioned at Gautam Buddha Nagar, Uttar Pradesh (201301). The delivery, installation, and commissioning period is 03 months. No BOQ items are listed and no definite estimated value or EMD amount is disclosed. All communications shall occur through GeM. This procurement requires bidders to align with GeM terms and ensures a streamlined, centralized tender process. The tender emphasizes timely delivery and complete handover with installation and commissioning included. The unique aspect is the explicit inclusion of installation and commissioning within the 3-month delivery window, indicating a turnkey approach for the moisture analyzers.

Technical Specifications & Requirements

  • Product category: Moisture Analyzer
  • Quantity: 2 sets
  • Delivery/Installation/Commissioning: within 03 months from order
  • Procurement channel: GeM platform; corresponding ATC document available
  • No explicit technical standards, performance metrics, or brand requirements are provided in the data
  • Status indicates a clean procurement path with centralized communication and potential after-sale support through NTPC channels
  • Emphasis on timely site readiness and commissioning to fulfill operational needs at the specified location

Terms, Conditions & Eligibility

  • Delivery window: within 03 months including installation and commissioning
  • Communication channel: exclusively via GeM
  • BOQ: total items listed as 0; no itemized quantities
  • EMD/Estimated value: not disclosed in tender data; bidders should watch GeM notices for updates
  • Additional ATC documents are available; ensure compliance with GeM submission requirements and NTPC procurement norms

Key Specifications

  • Product/service name: Moisture Analyzer

  • Quantity: 2 sets

  • Delivery: 3 months including installation & commissioning

  • Channel: GeM communications only

  • Standards/ certifications: Not specified in tender data

  • Warranty/After-sales: Not specified

Terms & Conditions

  • Delivery within 3 months including installation

  • GeM as sole communication channel

  • No BOQ items; 0 total items

Important Clauses

Payment Terms

Payment details are not disclosed; await GeM ATC for terms

Delivery Schedule

Delivery, installation, and commissioning to be completed within 3 months

Penalties/Liquidated Damages

No LD details provided; refer to GeM terms and NTPC ATC

Bidder Eligibility

  • Experience in supplying/commissioning moisture analyzers

  • Financial capacity to support procurement under NTPC requirements

  • Compliance with GeM procurement processes

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Two Set of Moisture Analyzer

Authority Records

MINISTRY OF POWERNTPC LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8632475.pdf

Main Document

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for prior moisture analyzer supply/installation

4

Financial statements showing liquidity to support procurement

5

EMD/Security deposit details (amount to be disclosed on GeM)

6

Technical compliance documents (if issued in ATC)

7

OEM authorization or dealer authorization (where applicable)

Corrigendum Updates

4 Updates
#1

Update

29-Dec-2025

Extended Deadline

01-Jan-2026, 4:00 pm

Opening Date

01-Jan-2026, 4:30 pm

#2

Update

25-Dec-2025

Extended Deadline

29-Dec-2025, 4:00 pm

Opening Date

29-Dec-2025, 4:30 pm

#3

Update

22-Dec-2025

Extended Deadline

25-Dec-2025, 4:00 pm

Opening Date

25-Dec-2025, 4:30 pm

#4

Update

19-Dec-2025

Extended Deadline

22-Dec-2025, 4:00 pm

Opening Date

22-Dec-2025, 4:30 pm

Technical Results

S.No Seller Item Date Status
1
BIO CORE LAB SOLUTIONS   Under PMA
Make : sartorius Model : MA160-1 Title : Two Set of Moisture Analyzer18-12-2025 14:25:06
2
BIO PACT SCIENTIFIC   Under PMA
Make : aczet Model : MB 200 Title : Two Set of Moisture Analyzer28-12-2025 19:47:55
3
KMV Agrotech and Engineering Works   Under PMA
Make : KMV Model : MA 210.X7.A.WH | Make: RADWAG (Poland) Title : Two Set of Moisture Analyzer01-01-2026 12:07:42
4
PARTH TECH INDIA   Under PMA
Make : RADWAG Model : MA 210.5Y.IC.WH Moisture Analyzer Title : Two Set of Moisture Analyzer19-12-2025 09:39:10

Financial Results

Rank Seller Price Item
L1
BIO CORE LAB SOLUTIONS   Under PMA
Item Categories : Two Set of Moisture Analyzer
L2
PARTH TECH INDIA   Under PMA
Item Categories : Two Set of Moisture Analyzer
L3
BIO PACT SCIENTIFIC   Under PMA
Item Categories : Two Set of Moisture Analyzer

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid on NTPC moisture analyzer tender in Gautam Budh Nagar 2025?

Bidders must register on GeM and follow NTPC ATC. Submit required documents such as GST, PAN, experience certificates, and financials. The tender requires two moisture analyzer sets with installation and commissioning within 3 months. Ensure OEM authorization if applicable and comply with GeM submission timelines.

What documents are required for NTPC moisture analyzer procurement in UP?

Submit GST certificate, PAN, experience certificates for similar supply, financial statements, and any OEM authorizations. Include EMD/security details as directed on GeM, plus technical compliance documents if provided. Ensure all documents are current and match NTPC GeM requirements.

What are the delivery terms for NTPC moisture analyzer tender 2025?

Delivery, installation, and commissioning must complete within 03 months of order. Coordinate with GeM communications for site readiness, delivery scheduling, and installation milestones. Delays may trigger penalties as per NTPC ATC terms available on GeM.

What is the EMD for the NTPC moisture analyzer bid 2025?

The tender data does not disclose an EMD amount; bidders should monitor GeM notices for the exact EMD requirement and acceptable payment method, whether online or DD as specified in ATC.

What standards or certifications are required for moisture analyzers in this tender?

No explicit standards are listed in the provided data. Bidders should review the ATC document on GeM for any required certifications, OEM norms, or performance criteria and ensure their moisture analyzers meet NTPC site compatibility.

How many moisture analyzer sets are required for this procurement in UP?

The tender specifies Two Set of Moisture Analyzer. Bidders must supply two complete sets, including all accessories, with installation and commissioning completed within the 3-month window.

What is the procurement channel for NTPC moisture analyzer bid 2025?

All communications and submission must occur via GeM. Ensure compliance with GeM bid submission guidelines, ATC attachments, and NTPC-specific clauses published on the GeM portal.

When will NTPC publish the final acceptance criteria for the moisture analyzers?

Final acceptance criteria are typically defined in the GeM ATC and NTPC procurement terms. Bidders should await official GeM notices detailing installation, commissioning acceptance, testing procedures, and warranty terms, if any.