TenderDekho Logo
GEM

Director General Of National Cadet Corps Hybrid Bicycle 700C Tender 2025 - 700C Bicycle Procurement by DGNCC

Bid Publish Date

22-Nov-2025, 2:19 pm

Bid End Date

02-Dec-2025, 3:00 pm

EMD

₹10,000

Progress

RA
Issue22-Nov-2025, 2:19 pm
Reverse Auction05-Dec-2025, 2:00 pm
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

24

Bid Type

Two Packet Bid

Categories 2

Tender Overview

Director General Of National Cadet Corps (DGNCC) invites bids for a Hybrid Bicycle 700C under a supply, installation, testing and commissioning scope. The tender includes an EMD of ₹10,000 and requires bidders to demonstrate minimum financial turnover as outlined in the bid document. The procurement involves a flexible quantity clause up to 25% increase/decrease, with delivery timing governed by the option clause. No BOQ items are listed, signaling a focused bike procurement with potential OEM considerations and ongoing supply commitments.

Technical Specifications & Requirements

  • Product: Hybrid Bicycle 700C (Category: Bicycle) with no detailed technical specs provided in the tender data.
  • Scope: Supply, Installation, Testing and Commissioning of Goods as per Agreement.
  • Financials: EMD ₹10,000; turnover criteria with three-year average turnover required; OEM turnover criteria specified.
  • Compliance: Bidders must ensure products are not end-of-life within at least five years residual market life; GST handling is bidder responsibility.
  • Documentation: Required documents include PAN, GSTIN, Cancelled Cheque, EFT Mandate; vendor code creation details to be uploaded.
  • Delivery & Risk: Option clause allows ±25% quantity adjustment; delivery period tied to original/extended delivery timelines with calculation rules.
  • Validity: No explicit technical standards listed; bidders must rely on general procurement norms and OEM survivability.

Terms, Conditions & Eligibility

  • EMD: ₹10,000 (tender security)
  • Turnover: Minimum average annual turnover over last 3 years as per bid document; include audited statements or CA certificate
  • Delivery: Delivery period governed by option clause (adjustment up to 25%); extended duration formula applies
  • GST: Bidder bears GST calculation; reimbursement as actuals or applicable rate (whichever is lower)
  • Documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate; vendor code creation documents
  • Products lifecycle: Offered bicycle must have at least 5 years residual market life; not declared end-of-life by OEM
  • Qualification: Not in liquidation or bankruptcy; provide undertaking with bid

Key Specifications

  • Product/service: Hybrid Bicycle 700C

  • EMD: ₹10,000

  • Scope: Supply, Installation, Testing and Commissioning

  • Life-cycle: product must have ≥5 years residual market life

  • Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate

  • Turnover: minimum average annual turnover over last 3 years (as per bid document)

  • GST: bidders responsible for GST; reimbursement as actuals or capped rate

Terms & Conditions

  • EMD of ₹10,000 required with bid submission

  • Quantity may vary ±25% at contract; delivery timelines linked to original/extended period

  • Notional BOQ items; scope includes installation and commissioning

Important Clauses

Payment Terms

GST shall be borne by bidder; reimbursement as actuals or allowable rates; payment terms not detailed; follow standard government terms

Delivery Schedule

Delivery period determined by option clause; additional time calculated as (increased quantity ÷ original quantity) × original delivery period, min 30 days

Penalties/Liquidated Damages

Not specified in the extract; implied LDs may apply per standard contract rules

Bidder Eligibility

  • Not under liquidation or court receivership

  • Minimum average turnover as per bid document (last 3 years)

  • OEM authorization if required for Hybrid Bicycle 700C

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Hybrid Bicycle 700C

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENTDIRECTOR GENERAL OF NATIONAL CADET CORPS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8622796.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

BIDDER SUBMISSION documents as per Terms and Conditions

2

PAN Card copy

3

GSTIN copy

4

Cancelled Cheque copy

5

EFT Mandate certified by Bank

6

Audited Balance Sheets or CA certificate confirming turnover (last 3 years)

7

OEM authorization (if applicable)

8

Proof of non-liquidation/court proceedings declaration

Reverse Auction Schedule

Completed

Start

05-Dec-2025, 2:00 pm

End

06-Dec-2025, 2:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
NEEL CART SERVICES   Under PMA
Make : OEM Model : Hellfire 700C Title : Hybrid Bicycle 700C01-12-2025 14:47:46
2
NKTECH SOLUTION   Under PMA
Make : OEM Model : avanti fm1 giro Title : Hybrid Bicycle 700C02-12-2025 13:15:38
3
Nktronics   Under PMA
Make : OEM Model : Montra Downtown Title : Hybrid Bicycle 700C01-12-2025 15:50:41

Financial Results

Rank Seller Price Item
L1
NKTECH SOLUTION(MII)   Under PMA
Item Categories : Hybrid Bicycle 700C
L2
Nktronics (MII)   Under PMA
Item Categories : Hybrid Bicycle 700C
L3
NEEL CART SERVICES (MII)   Under PMA
Item Categories : Hybrid Bicycle 700C

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid for the Hybrid Bicycle 700C tender in 2025 with DGNCC?

Bidders must submit PAN, GSTIN, Cancelled Cheque and EFT Mandate; provide three-year turnover evidence (audited balance sheets or CA certificate); ensure the bicycle meets at least five years residual life and complies with OEM availability. Include EMD ₹10,000 and complete scope: supply, installation, testing and commissioning.

What documents are required for DGNCC bicycle tender submission 2025?

Required documents include PAN, GSTIN, Cancelled Cheque, EFT Mandate, turnover certificates, OEM authorizations if applicable, and vendor code creation documents. Ensure GST treatment is as per applicable rates and submit turnover proof for last three financial years.

What is the EMD amount for the DGNCC bicycle procurement?

The EMD for this tender is ₹10,000. Submit via the prescribed electronic or bank guarantee channel with bid; ensure validity as per tender timeline. EMD acts as security until successful contract award or rejection.

What are the delivery terms for the Hybrid Bicycle 700C tender?

Delivery is governed by the option clause enabling ±25% quantity change; calculate additional delivery time as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days, and extendable within original delivery period.

Which turnover criteria apply to bidders for this bicycle tender?

Bidders must demonstrate minimum average annual turnover over the last three years as specified in the bid document, supported byAudited Balance Sheets or CA certificate; if the company is <3 years old, use completed years turnover post-incorporation.

Are OEM authorizations required for the Hybrid Bicycle tender 2025?

Yes, OEM authorization may be required for the offer; ensure that the bidding bicycle is not end-of-life within five years of the bid date and that OEM support is demonstrable through proper documentation.

What is the scope of supply for the DGNCC bicycle contract?

Scope includes Supply, Installation, Testing and Commissioning of the Hybrid Bicycle 700C; the price must cover all cost components, with delivery and commissioning aligned to contract terms.

What technical standards apply to the bicycle tender in 2025?

No explicit technical standards are listed in the tender extract; bidders should ensure compliance with general procurement norms and OEM specifications, plus ensure the bicycle remains active in the market for at least five years post-bid.