Progress
Quantity
84
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for plastic pallets to be supplied to Dhemaji, Assam 786110. The tender scope references plastic pallets with no itemized BOQ entries. Key constraints include a flexible quantity clause allowing up to 25% adjustment, and requirement to obtain Detailed Design Drawings approval from the buyer within 5 days of award. The contract emphasizes durability of offered pallets and vendor financial stability, with emphasis on non-obsolescence and minimum market life. The opportunity targets suppliers familiar with government procurement and capable of rapid design alignment post-award.
Plastic pallets for government logistics use
2+ years govt-supply experience required
Minimum 2 years residual market life; not OEM end-of-life
Submit Detailed Design Drawings within 5 days of award
GST handling as per bidder; reimbursement rules specified
Quantity may vary up to 25% during contract
Detailed Design Drawings due within 5 days of award
GST payable by bidder; reimbursement rules apply
2+ years govt pallet supply experience required
Quantity flexibility up to 25%; extension logic based on original and extended delivery periods with minimum 30 days.
Submit Detailed Design Drawings within 5 days; buyer response within 5 days; delays may adjust delivery without LD.
GST reimbursement based on actuals or applicable rate; bidder bears GST costs per quoted percentage.
2+ years of regular govt pallet manufacturing/supply
No liquidation or bankruptcy; provide undertaking
Pallets must have minimum 2-year residual life
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Plastic pallets
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
12
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Dhemaji
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Dhemaji | Dhemaji | - | - | 84 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque
EFT Mandate certified by Bank
Evidence of OEM authorization (if applicable)
Proof of prior government pallet supply (2+ years)
undertaking that bidder is not in liquidation or bankruptcy
Key insights about ASSAM tender market
Bidders should confirm eligibility: 2+ years govt pallet supply, non-liquidation status, and 2-year residual OEM life. Prepare PAN, GSTIN, cancelled cheque, EFT mandate, and any OEM authorizations. Submit Detailed Design Drawings within 5 days of award; ensure 25% quantity adjustment readiness and delivery planning.
Required documents include PAN Card copy, GSTIN copy, cancelled cheque, EFT mandate certified by bank, and evidence of OEM authorization if applicable. Also provide experience proofs of prior govt pallet supply and undertaking not in liquidation or bankruptcy.
Delivery can be increased up to 25% of bid quantity; delivery period adjusts using (increased quantity/original quantity) × original period, minimum 30 days. Original delivery period and any extensions must be aligned with buyer approvals and drawings.
GST is bidder-determined; reimbursement will be as per actuals or applicable rates, whichever is lower, limited to the quoted GST percentage. Bidders must manage GST compliance and invoicing accordingly.
Within 5 days of award, bidders must submit Detailed Design Drawings; buyer will approve or provide modification lists within 5 days; delays to approvals may pause delivery with no LD during the drawing phase.
Bidders or their OEMs must have regularly manufactured and supplied similar pallets to Central/State Govt/PSUs for at least 2 years before bid opening, with copies of relevant contracts to support eligibility.
Offered pallets must have at least 2 years residual market life and should not be declared end-of-life by the OEM during that period; this ensures ongoing support and availability.
The purchaser may increase or decrease quantity up to 25% at contract rates; extended delivery times apply, and the additional time is calculated with a minimum 30 days under the option clause.
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS