Progress
The Indian Army, Department Of Military Affairs, North Goa (GOA 403001) invites bids for a multi-item procurement including Sub Base Way systems, Polypropylene Tiles, Flood Lights, Chain Link Fencing, and related Accessories Hoop, Rim and Fiber Board. The estimated value is not disclosed; the EMD is ₹50,818. The purchaser reserves a ±25% quantity variation at contract placement and during the contract period, with delivery time adjusted proportionally (minimum 30 days). Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, alongside a data sheet matched to offered products. This tender requires End User Certificate in the buyer’s format and mandates government-style procurement compliance.
EMD amount: ₹50,818
Experience: 3 years in manufacturing/supplying similar govt category products
Categories: Sub Base Way, Polypropylene Tiles, Flood Light, Chain Link Fencing, Accessories Hoop, Rim, Fiber Board
Data Sheet must exactly match offered product specifications
End User Certificate to be provided in buyer’s standard format
GST and PAN verification; EFT mandate
Quantity variation up to 25% with percentage-based delivery time adjustment
EMD ₹50,818; bid must include valid payment instruments
Quantity may vary by ±25% during and after contract
3+ years govt/PSU supply experience with contract copies
GST, EMD handling, and actual reimbursement rules apply; exact payment schedule to be detailed in bid documents
Delivery period calculated from last date of original delivery order; extended time proportional to added quantity with minimum 30 days
Not explicitly stated; penalties to be as per standard govt procurement terms and contract schedule
3+ years experience supplying similar govt/PSU category products
Financial stability with contract copies for relevant work
No liquidation or bankruptcy proceedings; provide undertaking
Quantity
12025
Category
Sub Base Way
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
8
OEM Avg. Turnover
30
Past Performance
50 %
Warranty Period
3 years
Experience Required
3 Year (s)
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Sub Base Way , Polypropylene Tiles , Flood Light , Chain Link Fencing , Accessories Hoop, Rim and Fiber Board
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
41
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
NORTH GOA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | NORTH GOA | NORTH GOA | - | - | 5854 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Sub Base Way
Sub Base Way
Polypropylene Tiles
Polypropylene Tiles
Flood Light
Flood Light
Chain Link Fencing
Chain Link Fencing
Accessories Hoop, Rim and Fiber Board
Accessories Hoop, Rim and Fiber Board
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Sub Base Way | Sub Base Way | 5,854 | sq ft | 3ttracct | 60 | |
| 2 | Polypropylene Tiles | Polypropylene Tiles | 5,854 | sq ft | 3ttracct | 60 | |
| 3 | Flood Light | Flood Light | 1 | set | 3ttracct | 60 | |
| 4 | Chain Link Fencing | Chain Link Fencing | 315 | rft | 3ttracct | 60 | |
| 5 | Accessories Hoop, Rim and Fiber Board | Accessories Hoop, Rim and Fiber Board | 1 | set | 3ttracct | 60 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate (certified by bank)
Data Sheet of offered products
End User Certificate (buyer format, if requested)
Contract copies from prior govt/PSU supply (3 years experience evidence)
Key insights about GOA tender market
To bid, ensure you meet the 3+ year govt supply requirement and submit Data Sheet matched to offered products, PAN, GSTIN, cancelled cheque, and EFT mandate. Include contract copies from prior govt/PSU work and End User Certificate if requested. Ensure EMD of ₹50,818 is prepared.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT mandate, Data Sheet, and End User Certificate (buyer format). Also provide 3+ years govt/PSU supply contracts, and evidence of financial standing per T&Cs.
The EMD is ₹50,818. Payment terms specify GST handling by bidder with reimbursement as actual or capped by quoted rate; exact payment schedule will be detailed in the bid document and contract schedule.
Quantity may vary by up to ±25% of bid quantity at contract placement and during the currency. Delivery time adjusts proportionally to added quantity, with a minimum extension of 30 days.
A Data Sheet of offered products must be uploaded and strictly aligned with the product specifications. Any mismatch may lead to bid rejection; ensure labels, capacities, and materials match the offer exactly.
Bidders must show at least 3 years of regular manufacture/supply of same or similar category products to Central/State Govt or PSU, with copies of relevant contracts submitted along with the bid.
Procurement scope includes Sub Base Way, Polypropylene Tiles, Flood Light, Chain Link Fencing, and related Accessories Hoop, Rim and Fiber Board. Ensure your bid covers all listed categories with matching data sheets.
Delivery begins from the last date of the original delivery order. If the quantity increases, the additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; contractor may extend up to the original delivery period.