TenderDekho Logo
Active GEM

Gail India Limited Custom Bid for Services: CIPS and Coating Integrity Surveys for AGARTALA Regional Network Tripura 2026

Bid Publish Date

08-Oct-2026, 10:20 pm

Bid End Date

29-Oct-2026, 3:00 pm

EMD

₹1,01,000

Progress

Issue08-Oct-2026, 10:20 pm
AwardPending

Tender Overview

Organization: Gail India Limited. Project: Hiring of services for combined CIPS and coating integrity surveys of pipeline sections under the AGARTALA Regional Natural Gas Pipeline Network. Location: West Tripura, Tripura – 799001. EMD: ₹101,000. BOQ: No items published. Pre-bid meeting: 16.10.2026 at 15:00 Hrs via Microsoft Teams (link provided in ATC). Estimated value and start/end dates are not disclosed in the tender. This procurement targets qualified survey service providers with experience in pipeline integrity assessment. Unique aspect: single, bundled surveying scope across the specified regional network with formal ATC terms.

Technical Specifications & Requirements

  • Service scope: Combined CIPS (Categorical Internal Coating Survey) and coating integrity surveys for pipeline sections under AGARTALA regional network.
  • Location/coverage: West Tripura, Tripura state; installation/field survey sites within the AGARTALA region.
  • EMD: ₹101,000 (deposit required as per tender terms).
  • BOQ: Not published; no itemized quantities available.
  • ATC/Pre-bid: Attendees must join the 16.10.2026 meeting; ATC document holds the full terms.
  • Standards/Compliance: Not specified in the available data; bidders should rely on ATC for exact regulatory requirements.

Terms & Eligibility

  • EMD: ₹101,000; payment mode as defined in ATC.
  • Pre-bid meeting: 16.10.2026 at 15:00 Hrs via Teams; mandatory attendance recommended.
  • Location constraint: Work site in AGARTALA regional network, West Tripura, Tripura.
  • BOQ/Specifications: No published item list; bidders must review ATC for scope, deliverables, and penalties.
  • Documents: Submit standard bid documents per ATC; OEM authorizations and technical compliance may be required.
  • Delivery/Timeline: Not disclosed; refer to ATC for schedule and penalties if any.

Key Specifications

  • Service category: CIPS survey + coating integrity survey for pipeline sections

  • Estimated value: Not disclosed; EMD: ₹101,000

  • Geographic coverage: AGARTALA regional natural gas pipeline network, West Tripura

  • Documentation: ATC governs terms; pre-bid meeting date 16.10.2026

  • Standards/quality requirements: Not specified in data; rely on ATC for exact standards

Bidder Eligibility

  • Experience in conducting pipeline integrity surveys or related NDT/inspection services

  • Financial capability to mobilize field teams for regional surveys

  • Compliance with ATC terms and ability to attend pre-bid meeting on 16.10.2026

Advertisement

Tender Data

Bid Details

Quantity

1

Similar Category

Hiring of Third-Party Inspection Agency Maintenance and Pigging Service for Oil and Gas Pipelines

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

4 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Custom Bid for Services - HIRING OF SERVICES FOR COMBINED CIPS AND COATING INTEGRITY SURVEYS OF PIPELINE SECTIONS UNDER AGARTALA REGIONAL NATURAL GAS PIPELINE NETWORK

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

7

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

16-10-2026 15:00:00

Pre-Bid Venue

Microsoft Teams meeting Join: https://teams.microsoft.com/meet/476289465690011? p=Kqe0jYGdOK9FkhW0SQ Meeting ID: 476 289 465 690 011 Passcode: 84xu2Um2

Delivery Details

Delivery Locations

1

Delivery Cities

West Tripura

Delivery Pincodes

799005

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pratik Kumar Padhee799005,GAIL(India) Limited, Opp. Radhanagar Bus standWest TripuraTripura799005Project / Lumpsum Based--

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASGAIL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 9

GeM-Bidding-10007499.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Gail India Limited

Office Name

Agartala

Grievance Contact

[email protected]

Categories 10

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for pipeline survey or related integrity projects

4

Financial statements / turnover proof

5

EMD payment receipt or bank instrument (₹101000)

6

Technical bid documents demonstrating capability for CIPS and coating surveys

7

OEM authorizations (if applicable) and service capability certificates

8

Any ATC-specified documents referenced in buyer terms

Frequently Asked Questions

Key insights about TRIPURA tender market

How to bid on the Gail India CIPS coating survey tender in Tripura 2026

Bidders must submit GST and PAN, experience certificates, financials, and EMD of ₹101,000. Prepare a technical bid proving capability for CIPS and coating integrity surveys, and attend the pre-bid meeting on 16 October 2026 via the provided Teams link. Review the ATC for exact deliverables, timelines, and penalties.

What documents are required for Gail India AGARTALA pipeline survey bid

Submit GST certificate, PAN card, company/firm registration, experience certificates for pipeline surveys, financial statements, EMD receipt, OEM authorizations if applicable, and technical compliance documents as specified in the ATC. Ensure all documents align with bid submission guidelines in the ATC.

What are the technical requirements for CIPS and coating surveys in Agartala

The tender specifies combined CIPS and coating integrity surveys across AGARTALA regional network; exact scope and method are defined in the ATC. No numeric technical specs are published here; bidders should reference the ATC for methodology, reporting format, and acceptance criteria.

When is the pre-bid meeting for the Gail AGARTALA tender

The pre-bid meeting is scheduled for 16.10.2026 at 15:00 Hrs via Microsoft Teams. Participation is recommended to clarify scope, deliverables, and any ATC-based queries. Access the Teams link provided in the ATC document.

What is the EMD amount for the Gail India Tripura survey tender

The Earnest Money Deposit (EMD) is ₹101,000. Payment will follow the method outlined in the ATC, and bidders must include the EMD receipt with their bid submission to qualify for evaluation.

Where is the AGARTALA pipeline network survey tender located

The procurement location is the AGARTALA regional natural gas pipeline network in West Tripura, Tripura, with work covering pipeline sections within this geographic scope as defined in the ATC.

What documents prove eligibility for Gail India coating survey contract

Eligibility requires evidence of pipeline survey experience, financial stability, GST and PAN, and OEM authorizations if applicable. Submit experience certificates, financial statements, and technical compliance as per the ATC; attendance at the pre-bid meeting is advantageous.

How will delivery timelines be defined for this Tripura survey

Delivery timelines are not disclosed in the basic tender data; refer to the ATC for schedule, milestones, and penalties. Bidders should prepare a realistic field mobilization plan aligned with ATC terms and potential site access constraints.

Advertisement