TenderDekho Logo
Active GEM

Procurement Opportunity: AMINE WATER WASH SETTLER,Site supervision of erection, testing and commissioning,SPENT SOLVENT DEGA in MUMBAI, MAHARASHTRA

Bid Publish Date

18-Sep-2026, 10:34 am

Bid End Date

30-Oct-2026, 2:00 pm

EMD

₹12,01,203

Generate Docs

Progress

Issue18-Sep-2026, 10:34 am
Corrigendum15-Oct-2026
AwardPending

Bharat Petroleum Corporation Ltd invites bids for AMINE WATER WASH SETTLER, Site supervision of erection, testing and commissioning, SPENT SOLVENT DEGASSING DRUM, WATER WASH, OXIDIZER, DISULFIDE SEPARATOR, DISULFIDE SAND FILTER, SUSPECT CONDENSATE ATMOSPHERIC FLASH DRUM, CONDENSATE POT, C3 C4 SPLITER RECEIVER, C3 C4 SPLITTER STEAM REBOILER CONDENSATE POT, AMINE REGENERATOR REBOILER CONDENSATE POT, AMINE REGENERATOR SKIM OFF VESSEL, SUPPLY OF ONLY NOZZLE F 10 IN WITH FLANGE, AMINE BLOWDOWN DRUM, CLOSED BLOWDOWN DRUM, CAUSTIC CLOSED BLOWDOWN DRUM, SUPPLY OF AMINE FLARE KOD, HP INSTRUMENT AIR RECEIVER, Site Work Final Erection including all activities, RICH AMINE FLASH DRUM, AMINE STORAGE VESSEL I, II in MUMBAI, MAHARASHTRA. Quantity: 85. Submission Deadline: 30-10-2026 14: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

85

Category

AMINE WATER WASH SETTLER

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

97359

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

AMINE WATER WASH SETTLER , Site supervision of erection, testing and commissioning , SPENT SOLVENT DEGASSING DRUM , WATER WASH , OXIDIZER , DISULFIDE SEPARATOR , DISULFIDE SAND FILTER , SUSPECT CONDENSATE ATMOSPHERIC FLASH DRUM , CONDENSATE POT , C3 C4 SPLITER RECEIVER , C3 C4 SPLITTER STEAM REBOILER CONDENSATE POT , AMINE REGENERATOR REBOILER CONDENSATE POT , AMINE REGENERATOR SKIM OFF VESSEL , SUPPLY OF ONLY NOZZLE F 10 IN WITH FLANGE , AMINE BLOWDOWN DRUM , CLOSED BLOWDOWN DRUM , CAUSTIC CLOSED BLOWDOWN DRUM , SUPPLY OF AMINE FLARE KOD , HP INSTRUMENT AIR RECEIVER , Site Work Final Erection including all activities , RICH AMINE FLASH DRUM , AMINE STORAGE VESSEL I,II

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

24

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

30-09-2026 15:00:00

Pre-Bid Venue

Venue: Technip Energies India Limited, A - 4, Institutional Area, Block A, Sector 1, Noida, Uttar Pradesh 201301 Online: via Video Conferencing (Preferably Microsoft Teams)

Delivery Details

Max Delivery Days

487

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400074

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vikram Ramkumar Gupta400074,BPCL Mumbai Refinery, Admin building, South block, Second floor, CPO RPP, Mahul, Mumbai - 400074Mumbai SuburbanMaharashtra4000741487-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9898226.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Projects Procurement Mr Mumbai

Grievance Contact

[email protected]

Corrigendum Updates

4 Updates
#1

Update

15-Oct-2026
#2

Update

15-Oct-2026

Extended Deadline

30-Oct-2026, 8:30 am

Opening Date

31-Oct-2026, 8:30 am

#3

Update

05-Oct-2026
#4

Update

05-Oct-2026

Extended Deadline

16-Oct-2026, 8:30 am

Opening Date

17-Oct-2026, 8:30 am

Advertisement

Bill of Quantities (BOQ) 27 Items Sign in for GEM prices

#1

AMINE WATER WASH SETTLER

As per MR

1 lot Delivery: 487 days
#2

Site supervision of erection, testing and commissioning

As per MR

10 lot Delivery: 1,228 days
#3

SPENT SOLVENT DEGASSING DRUM

As per MR

1 lot Delivery: 487 days
#4

WATER WASH

As per MR

1 lot Delivery: 487 days
#5

OXIDIZER

As per MR

1 lot Delivery: 487 days
#6

DISULFIDE SEPARATOR

As per MR

1 lot Delivery: 487 days
#7

DISULFIDE SAND FILTER

As per MR

1 lot Delivery: 487 days
#8

SUSPECT CONDENSATE ATMOSPHERIC FLASH DRUM

As per MR

1 lot Delivery: 487 days
#9

CONDENSATE POT

As per MR

4 lot Delivery: 487 days
#10

C3 C4 SPLITER RECEIVER

As per MR

1 lot Delivery: 487 days
#11

Site supervision of erection, testing and commissioning

As per MR

10 lot Delivery: 1,228 days
#12

C3 C4 SPLITTER STEAM REBOILER CONDENSATE POT

As per MR

1 lot Delivery: 487 days
#13

AMINE REGENERATOR REBOILER CONDENSATE POT

As per MR

1 lot Delivery: 487 days
#14

AMINE REGENERATOR SKIM OFF VESSEL

As per MR

1 lot Delivery: 487 days
#15

SUPPLY OF ONLY NOZZLE F 10 IN WITH FLANGE

As per MR

1 lot Delivery: 487 days
#16

AMINE BLOWDOWN DRUM

As per MR

1 lot Delivery: 487 days
#17

Site supervision of erection, testing and commissioning

As per MR

10 lot Delivery: 1,228 days
#18

CLOSED BLOWDOWN DRUM

As per MR

1 lot Delivery: 487 days
#19

Site supervision of erection, testing and commissioning

As per MR

10 lot Delivery: 1,228 days
#20

CAUSTIC CLOSED BLOWDOWN DRUM

As per MR

1 lot Delivery: 487 days
#21

Site supervision of erection, testing and commissioning

As per MR

10 lot Delivery: 1,228 days
#22

SUPPLY OF AMINE FLARE KOD

As per MR

1 lot Delivery: 487 days
#23

HP INSTRUMENT AIR RECEIVER

As per MR

1 lot Delivery: 487 days
#24

Site Work Final Erection including all activities

As per MR

1 lot Delivery: 1,302 days
#25

RICH AMINE FLASH DRUM

As per MR

1 lot Delivery: 487 days
#26

Site supervision of erection, testing and commissioning

As per MR

10 lot Delivery: 1,228 days
#27

AMINE STORAGE VESSEL I,II

As per MR

2 lot Delivery: 487 days

Categories 35

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement