TenderDekho Logo
Closed GEM

Government Tender Published for FORK OF PUSH ROD 209,SHAFT 214,SHAFT 216,SHAFT OF ARM OF FROCE BLOCK 221,CONNECTING PLATE WITH SHAF in HOSHANGABAD, MADHYA PRADESH

Bid Publish Date

26-Aug-2026, 10:42 am

Bid End Date

03-Oct-2026, 3:00 pm

Generate Docs

Progress

Issue26-Aug-2026, 10:42 am
Corrigendum25-Sep-2026
AwardPending

A tender has been published for Security Printing And Minting Corporation Of India Limited (spmcil) FORK OF PUSH ROD 209, SHAFT 214, SHAFT 216, SHAFT OF ARM OF FROCE BLOCK 221, CONNECTING PLATE WITH SHAFT 224, BALL BEARING 6204 ZZ C3, SMALL ROLLER 234, BIG SPRING 302, SMALL PISTON ROD 303, BEARING 309, BIG WHEEL 310, BEARING 315, BIG WHEEL SHAFT 316, HYDRAULIC VALVE ASSEMBLY 321, OIL PUMP BODY 322, BIG PISTON ROD 328, PUMP HANDLE BRACKET HLMP30 B, Graded cast iron steering wheel, Polyurethane steering wheel, Cast Nylon steering Wheel HL 28 R NC BB, DOUBLE BALL BEARING HL32 PU BB, DOUBLE BALL BEARING HL 32 NY TR BB, DOUBLE BALL BEARING HL32 AFY BB, PUMP HANDLE PIN HLPT 30 P, FORK ROLLER BRACKET HL 24, PUMP HANDLE SPRING HL MP 10 CS, Tendam Roller HL TRP in HOSHANGABAD, MADHYA PRADESH. Quantity: 212 by. Submission Deadline: 03-10-2026 15: 00: 00. Check eligibility and apply.

Advertisement

Authority & Contact

Organization

Security Printing And Minting Corporation Of India Limited (spmcil)

Office Name

3rd Floor Tower G World Trade Centre Nauroji Nagar

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

212

Category

CONNECTING PLATE WITH SHAFT 224

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

FORK OF PUSH ROD 209 , SHAFT 214 , SHAFT 216 , SHAFT OF ARM OF FROCE BLOCK 221 , CONNECTING PLATE WITH SHAFT 224 , BALL BEARING 6204 ZZ C3 , SMALL ROLLER 234 , BIG SPRING 302 , SMALL PISTON ROD 303 , BEARING 309 , BIG WHEEL 310 , BEARING 315 , BIG WHEEL SHAFT 316 , HYDRAULIC VALVE ASSEMBLY 321 , OIL PUMP BODY 322 , BIG PISTON ROD 328 , PUMP HANDLE BRACKET HLMP30 B , Graded cast iron steering wheel , Polyurethane steering wheel , Cast Nylon steering Wheel HL 28 R NC BB , DOUBLE BALL BEARING HL32 PU BB , DOUBLE BALL BEARING HL 32 NY TR BB , DOUBLE BALL BEARING HL32 AFY BB , PUMP HANDLE PIN HLPT 30 P , FORK ROLLER BRACKET HL 24 , PUMP HANDLE SPRING HL MP 10 CS , Tendam Roller HL TRP

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Hoshangabad

Delivery Pincodes

461005

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Biplab Basak461005,Security Paper Mill ,Narmadapuram , Madhya PradeshHoshangabadMadhya Pradesh461005245-

Authority Records

MINISTRY OF FINANCEECONOMIC AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9756789.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 27 Items Sign in for GEM prices

#1

FORK OF PUSH ROD 209

As per technical Specification

2 ea Delivery: 45 days
#2

SHAFT 214

As per technical Specification

2 ea Delivery: 45 days
#3

SHAFT 216

As per technical Specification

4 ea Delivery: 45 days
#4

SHAFT OF ARM OF FROCE BLOCK 221

As per technical Specification

8 ea Delivery: 45 days
#5

CONNECTING PLATE WITH SHAFT 224

As per technical Specification

4 ea Delivery: 45 days
#6

BALL BEARING 6204 ZZ C3

As per technical Specification

50 ea Delivery: 45 days
#7

SMALL ROLLER 234

As per technical Specification

20 ea Delivery: 45 days
#8

BIG SPRING 302

As per technical Specification

8 ea Delivery: 45 days
#9

SMALL PISTON ROD 303

As per technical Specification

2 ea Delivery: 45 days
#10

BEARING 309

As per technical Specification

20 ea Delivery: 45 days
#11

BIG WHEEL 310

As per technical Specification

10 ea Delivery: 45 days
#12

BEARING 315

As per technical Specification

4 ea Delivery: 45 days
#13

BIG WHEEL SHAFT 316

As per technical Specification

2 ea Delivery: 45 days
#14

HYDRAULIC VALVE ASSEMBLY 321

As per technical Specification

2 ea Delivery: 45 days
#15

OIL PUMP BODY 322

As per technical Specification

1 ea Delivery: 45 days
#16

BIG PISTON ROD 328

As per technical Specification

2 ea Delivery: 45 days
#17

PUMP HANDLE BRACKET HLMP30 B

As per technical Specification

4 ea Delivery: 45 days
#18

Graded cast iron steering wheel

As per technical Specification

4 ea Delivery: 45 days
#19

Polyurethane steering wheel

As per technical Specification

20 ea Delivery: 45 days
#20

Cast Nylon steering Wheel HL 28 R NC BB

As per technical Specification

4 ea Delivery: 45 days
#21

DOUBLE BALL BEARING HL32 PU BB

As per technical Specification

4 ea Delivery: 45 days
#22

DOUBLE BALL BEARING HL 32 NY TR BB

As per technical Specification

12 ea Delivery: 45 days
#23

DOUBLE BALL BEARING HL32 AFY BB

As per technical Specification

4 ea Delivery: 45 days
#24

PUMP HANDLE PIN HLPT 30 P

As per technical Specification

4 ea Delivery: 45 days
#25

FORK ROLLER BRACKET HL 24

As per technical Specification

4 ea Delivery: 45 days
#26

PUMP HANDLE SPRING HL MP 10 CS

As per technical Specification

7 ea Delivery: 45 days
#27

Tendam Roller HL TRP

As per technical Specification

4 ea Delivery: 45 days
Advertisement

Categories 24

Corrigendum Updates

1 Update
#1

Update

25-Sep-2026

Extended Deadline

03-Oct-2026, 9:30 am

Opening Date

04-Oct-2026, 9:30 am

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement