Progress
Quantity
4
Category
RIGID COUPLING
Bid Type
Single Packet Bid
Product/service names: RIGID COUPLING, SOLID SHAFT
Quantities: (Not specified in data) – subject to 25% variation
Estimated value: Not disclosed
Experience/eligibility: Basic documentation for Vendor Code creation (PAN, GSTIN, EFT mandate)
Quality/standards: Not specified; adherence to ATC terms and GeM contract
Delivery/install: Consignee-based delivery, correct tagging, GeM contract addresses
Warranty/AMC: Not specified
GeM-based supply with option to upsize/downsized by 25%
GST handling and invoice submission on GeM portal
Mandatory vendor documentation for registration and delivery
GST-inclusive invoicing; payment via GeM portal with GST confirmation; reimbursement as actuals or lower rate
Delivery period starts from the last date of original delivery order; extension period minimum 30 days; quantity variation up to 25%
Not explicitly stated; bidders should anticipate standard GeM penalties for non-compliance
Submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation
Provide GST invoice and GST portal payment proof during bid generation
Adhere to GeM ATC terms and consignee-specific delivery instructions
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RIGID COUPLING , SOLID SHAFT
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
GST invoice and GST portal payment screenshot
Any certificates/documents sought in Bid document/ATC/Corrigendum
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | MEGHNA KON ENGINEERING( MSE Social Category:General ) Under PMA | Item Categories : RIGID COUPLING,SOLID SHAFT | |
| L2 | P K ENGINEERING WORKS( MSE Social Category:General ) Under PMA | Item Categories : RIGID COUPLING,SOLID SHAFT | |
| L3 | RADHEY MACHINE TOOLS( MSE Social Category:General ) Under PMA | Item Categories : RIGID COUPLING,SOLID SHAFT | |
| L4 | FLEXITECH INDUSTRIES(MSE)( MSE Social Category:General ) Under PMA | Item Categories : RIGID COUPLING,SOLID SHAFT | |
| L5 | ANGEL ENGG. CO.( MSE Social Category:General ) Under PMA | Item Categories : RIGID COUPLING,SOLID SHAFT | |
| L6 | STANDARD MATERIALS AGENCIES PRIVATE LIMITED Under PMA | Item Categories : RIGID COUPLING,SOLID SHAFT | |
| L7 | C D ENGINEERING CO( MSE Social Category:General ) Under PMA | Item Categories : RIGID COUPLING,SOLID SHAFT | |
| L8 | ISPAT SHILPA Under PMA | Item Categories : RIGID COUPLING,SOLID SHAFT |
Please sign in or create an account to view contract details and download result documents.
Key insights about KERALA tender market
Bidders should register on GeM, upload PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation; submit GST invoice and GST payment screenshot; ensure compliance with ATC terms and consignee-specific delivery instructions to participate.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by Bank, and GST invoice with payment screenshot; ensure all certificates listed in ATC/Corrigendum are uploaded for bid acceptance.
The contract allows up to 25% increase or decrease in quantity during placement and currency; additional delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders must comply with buyer-added ATC clauses, GeM Contract terms, and ensure consignee-specific tagging and accurate delivery to designated addresses; follow GST and invoice procedures within GeM.
Payment follows GeM portal procedures; invoices must include GST details and a GST payment screenshot; reimbursement is as actuals or at the lower applicable rate as per GST norms.
Segregate materials with consignee tags and deliver strictly to the predefined consignee addresses; FACT may reject materials delivered to wrong consignees and may transfer only at additional transport costs.
GST is to be determined by the bidder; reimbursement will be based on actuals or the lower rate; ensure GST invoice is uploaded and GST portal payment confirmation is provided during bid.
Bids without required certificates and documents specified in Bid document/ATC/Corrigendum are liable for rejection; ensure all requested certificates are uploaded before bid submission.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS