Item 1,Item 2,Item 3,Item 4,Item 5
Mod Sectt Establishment
WEST KAMENG, ARUNACHAL PRADESH
Bid Publish Date
30-Dec-2025, 5:08 pm
Bid End Date
14-Jan-2026, 6:00 pm
Location
Progress
Quantity
7
Category
Item 1
Bid Type
Two Packet Bid
The Manipur Pollution Control Board, under the Environment And Forest Department Manipur, invites bids for the supply, installation, testing and commissioning of environmental equipment across five items. The procurement includes a flexible quantity option up to 25% during contract, with delivery timelines tied to the original order and extended by the option clause. Bidders must ensure products are not obsolete and have at least 3 years residual market life. A data sheet must accompany the bid for technical verification. OEM authorization and GST compliance are required, along with demonstrated prior government contracts. The scope emphasizes turnkey delivery, including installation and commissioning to meet government standards.
Key Term 1: Up to 25% quantity variation allowed with corresponding delivery time adjustments
Key Term 2: Regulatory compliance requires 2 years government contract experience and OEM authorization
Key Term 3: Data Sheet upload mandatory; product parameters must match offered specs
GST to be accounted by bidder; reimbursement as actuals or as per applicable rates, whichever is lower
Delivery period commences from last date of original delivery order; extension logic applies for added quantity with minimum 30 days
Not explicitly stated in provided terms; performance penalties may be implied under standard govt contract norms
2 years govt/PSU supply experience for similar category products
OEM authorization form with complete details (name, designation, address, email, phone)
Minimum average financial turnover over the last 3 years (exact threshold not disclosed)
Not obsolescent products; 3 years residual market life
Mod Sectt Establishment
WEST KAMENG, ARUNACHAL PRADESH
Indian Coast Guard
CHENNAI, TAMIL NADU
Bharat Coking Coal Limited
DHANBAD, JHARKHAND
State Bank Of India (sbi)
Indian Navy
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Item 1 | Video Conferencing Camera Set | 1 | pieces | buyer.mpcb | 30 |
| 2 | Item 2 | High End Videography Camera | 1 | pieces | buyer.mpcb | 30 |
| 3 | Item 3 | Speaker with MIC for VC | 1 | pieces | buyer.mpcb | 30 |
| 4 | Item 4 | Hot and Cold AC | 3 | pieces | buyer.mpcb | 30 |
| 5 | Item 5 | Intel Core i7 desktop | 1 | pieces | buyer.mpcb | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about MANIPUR tender market
Bidders must submit the Data Sheet, GST registration, PAN, and OEM authorization. Ensure 2 years govt/PSU supply experience and a minimum 3-year residual life for offered products. The bid should include turnkey delivery covering supply, installation, testing and commissioning, with GST as applicable.
Required documents include GST certificate, PAN, manufacturer authorization, past Govt/PSU contracts as evidence, data sheet matching offered specs, financial statements showing turnover, experience certificates, and any OEM support letters. Ensure data sheet aligns with the offered product parameters.
The scope includes Supply, Installation, Testing and Commissioning of goods. Delivery time is linked to the original delivery order with option-based extensions; additional time is calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.
Bidders must verify applicable GST on their own; reimbursement will be as actuals or as per prevailing rates, whichever is lower, capped at the quoted GST percentage. Ensure GST registration is valid and active.
The bidder or OEM must have regularly manufactured and supplied similar category products to central/state government or PSU for at least 2 years before bid opening, with copies of contracts submitted to demonstrate quantity fulfillment each year.
A Data Sheet detailing product specifications must be uploaded and cross-checked against the offered items. Any mismatch between parameters and the bid can lead to rejection; ensure all technical parameters precisely match the proposed equipment.
Bidders must meet a minimum average annual turnover over the last 3 years ending 31st March of the previous year. The exact turnover threshold is not disclosed publicly, so bidders should ensure their three-year revenue supports the contract value.
Yes. Bidders must offer products with at least 3 years residual market life and must ensure the offered goods will not be declared end-of-life by the OEM during the contract period.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS