TenderDekho Logo
GEM

Indian Army Pathankot Procurement of Automotive Spare Parts ISO 9001 2024

Bid Publish Date

20-Feb-2026, 7:25 pm

Bid End Date

02-Mar-2026, 8:00 pm

Progress

Issue20-Feb-2026, 7:25 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

26

Category

Assy Rubber Bush Lower

Bid Type

Two Packet Bid

Categories 27

Tender Overview

The Indian Army, Department Of Military Affairs, is conducting a procurement tender in Pathankot, Punjab 143534 for a broad assortment of automotive spare parts including Assy Rubber Bush Lower, Rubber for Vacuum Pump, Assy Pipe Coolant, Steering Pump to Gear, Door Beading, Speedometer Cable, Hose Assy, Engine Speed Sensor, and related components. The BOQ comprises 18 items with unspecified exact quantities, but the contract anticipates a firm bid at a total estimated value to be determined and an EMD not disclosed. A key differentiator is the required ISO 9001 certification for the bidder or OEM, and the option to increase quantity by up to 25% during the contract. The process includes an advance sample approval with a five-day window post award and a potential supply modification cycle if samples deviate from contract specs. The tender emphasizes supplier readiness for bulk manufacturing tied to an approved sample and adherence to supplier code creation prerequisites.

Technical Specifications & Requirements

  • Product categories: automotive spares such as hoses, belts, sensors, drive components, and timing covers; 18 items in the BOQ with no itemized specs disclosed.
  • Certification: ISO 9001 certified bidders or OEMs required.
  • Documentation flow: PAN, GSTIN, cancelled cheque, EFT mandate certified by bank for vendor code creation.
  • Sample process: 2–14/17 samples to be submitted within 5 days of award; approval or modification list provided within 5 days; bulk supply must follow approved sample; if delays in approval occur, delivery period may be reset; non-conforming samples may lead to termination.
  • Delivery considerations: option clause allows quantity adjustments up to 25% during and after contract at contracted rates.
  • Compliance: general terms require adherence to the sample-based framework and advance sample approvals prior to bulk manufacturing.

Terms & Eligibility

  • EMD details: not disclosed; bid must include standard documents for vendor code creation.
  • Documents to submit: PAN, GSTIN, cancelled cheque, EFT mandate; OEM authorization and technical compliance as applicable.
  • Delivery and payment terms: delivery periods and payments aligned with contract framework and option clause; no LD specified beyond standard owner terms.
  • Warranty/after-sales: ISO 9001 ensures quality management; OEM-backed supply and sample approvals implied.
  • Risk: option-based quantity changes; ensure readiness for bulk manufacturing following approved samples.

Key Specifications

  • Product names from tender: Assy Rubber Bush Lower, Rubber for Vacuum Pump, Assy Pipe Coolant, Steering Pump to Gear, Door Beading, Speedometer Cable, Hose Assy, Engine Speed Sensor, Hose, Parts Kit Power Steering, Engagement Clutch, Pinion Drive Self Starter, Hyd Pipe, Chain Sprocket Set, Carburetor BS 29, Fuel Motor, Cover Timing Belt Outside, Speedo Drive Complete Plastic

  • Quantity: 18 items in BOQ, exact quantities not disclosed

  • Standards: ISO 9001 certification required for bidder or OEM

  • Delivery: option to increase quantity by 25% during contract at contracted rates

  • Sample approval: submit 2-14/17 samples within 5 days of award; approval or modification within 5 days; bulk supply as per approved sample

Terms & Conditions

  • Option Clause: up to 25% quantity variation during contract at contracted rates

  • ISO 9001: bidder or OEM must hold ISO 9001 certification

  • Advance sample process: submit samples within 5 days; approval timeline 5 days

Important Clauses

Payment Terms

Payments linked to contract milestones; no explicit LD mentioned; follow standard government terms and sample approval schedule

Delivery Schedule

Delivery begins after final sample approval; additional time adjustments allowed if sample approval is delayed; minimum extensions governed by option clause

Penalties/Liquidated Damages

LD provisions not explicitly stated; contract terms imply adherence to delivery timelines and approved samples

Bidder Eligibility

  • Must hold ISO 9001 certification (bidder or OEM)

  • Must submit PAN, GSTIN, cancelled cheque and EFT mandate

  • Must be capable of bulk manufacturing following approved samples

Documents 4

GeM-Bidding-9021855.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Fuel Motor,Ignition Switch Assy,Solenoid Switch Assy,Pump Steering Pump Assy,Pipe Assy,Rear Chain,B

Indian Army

Pathankot, PUNJAB

Posted: 19 December 2024
Closed: 9 January 2025
GEM

Indian Army Oil Seal & Gasket Goods Tender 2025 | Department Of Military Affairs Supply 15 Items

Indian Army

DARJEELING, WEST BENGAL

Posted: 1 November 2025
Closed: 11 November 2025
GEM

Indian Army Vehicle Spare Parts Tender BhopaL Madhya Pradesh 2025 | ISI/ISO Standards and MSE Preference

Indian Army

BHOPAL, MADHYA PRADESH

Posted: 17 November 2025
Closed: 27 November 2025
GEM

Indian Army Department Of Military Affairs Carburator Assy, Gear Kit & Misc Parts Tender Bikaner Rajasthan 2026

Indian Army

BIKANER, RAJASTHAN

Posted: 10 January 2026
Closed: 20 January 2026
GEM

Indian Army Drive Pinion and Hydraulic Hose Components Tender 2025 Vehicle Spare Parts Procurement

Indian Army

Samba, JAMMU & KASHMIR

Posted: 7 November 2025
Closed: 18 November 2025
GEM

Bill of Quantities (BOQ) 18 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Assy Rubber Bush Lower Assy Rubber Bush Lower 2 nos hemant6002 20
2 Rubber for Vacuum Pump Rubber for Vacuum Pump 1 nos hemant6002 20
3 Assy Pipe Coolant Assy Pipe Coolant 2 nos hemant6002 20
4 Steering Pump to Gear Steering Pump to Gear 1 nos hemant6002 20
5 Door Beading Door Beading 1 nos hemant6002 20
6 Speedometer Cable Speedometer Cable 1 nos hemant6002 20
7 Hose Assy Hose Assy 2 nos hemant6002 20
8 Engine Speed Sensor Engine Speed Sensor 2 nos hemant6002 20
9 Hose Hose 2 nos hemant6002 20
10 Parts Kit Power Steering Parts Kit Power Steering 2 nos hemant6002 20
11 Engagement Clutch Engagement Clutch 1 nos hemant6002 20
12 Pinion Drive Self Starter Pinion Drive Self Starter 1 nos hemant6002 20
13 Hyd Pipe Hyd Pipe 1 nos hemant6002 20
14 Chain Sprocket Set Chain Sprocket Set 1 nos hemant6002 20
15 Carburetor BS 29 Carburetor BS 29 1 nos hemant6002 20
16 Fuel Motor Fuel Motor 1 nos hemant6002 20
17 Cover Timing Belt Outside Cover Timing Belt Outside 2 nos hemant6002 20
18 Speedo Drive Complete Plastic Speedo Drive Complete Plastic 2 nos hemant6002 20

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

Certified EFT mandate

5

Vendor code creation documents

6

ISO 9001 certificate (bidder or OEM)

7

OEM authorization (if applicable)

8

Technical bid documents

9

Experience certificates (if requested)

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid in the Pathankot automotive spares tender 2026 for Indian Army?

Bidders must provide PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation, along with ISO 9001 certification (bidder or OEM). Prepare 5–7 technical documents and ensure samples are ready for 5-day post-award testing; submit 2–14/17 samples within 5 days and await approval or modification list within 5 days.

What documents are required for Indian Army vehicle parts tender in Pathankot?

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, vendor code creation papers, ISO 9001 certificate, OEM authorization (if applicable), and technical bid materials. Ensure all documents are legible, certified, and reflect current details for seamless bid submission.

What is the sample approval process for bulk manufacturing in this tender?

Submit 2–14/17 advance samples within 5 days of contract award. Buyer will approve or request modifications within 5 days; bulk supply must follow the approved sample. Delays in approval may reset the delivery timeline without liquidated damages.

What standards and certifications are mandatory for bidders in this tender?

The bid requires ISO 9001 certification for the bidder or OEM. Ensure you supply an ISO 9001 certificate and related quality management documentation to demonstrate compliance with standard processes for automotive spares.

What is the delivery variation clause for this Indian Army procurement?

The purchaser may increase or decrease the quantity up to 25% during contract and during currency with contracted rates. Delivery time extensions follow a specific calculation and must start from the last date of the original or extended delivery period.

Which items are included in the 18 BOQ components for this tender?

Included items cover a broad range of automotive spares: Assy Rubber Bush Lower, Rubber for Vacuum Pump, Assy Pipe Coolant, Steering Pump to Gear, Door Beading, Speedometer Cable, Hose Assy, Engine Speed Sensor, Hose, Parts Kit Power Steering, Engagement Clutch, Pinion Drive Self Starter, Hyd Pipe, Chain Sprocket Set, Carburetor BS 29, Fuel Motor, Cover Timing Belt Outside, and Speedo Drive Complete Plastic.

What is the location and organization for this procurement tender?

Tender location is Pathankot, Punjab (143534), and the procuring organization is the Indian Army under the Department of Military Affairs. This is a government defense equipment supply tender with ISO 9001 requirements for the supplier.

When is bulk manufacturing allowed after sample approval in this tender?

Bulk manufacturing can commence after advance sample approval; if the buyer delays approval, the delivery period may be reset. If samples deviate, the buyer may request fresh samples or terminate the contract after notifying deviations.