Balance steel work, roofing work, construction of pit line, flooring work and other misc. associated works in connection......
Bid Publish Date
21-Oct-2025, 12:25 pm
Bid End Date
11-Nov-2025, 1:00 pm
EMD
₹30,000
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
North East Frontier Railway invites bids for the supply of material along with welding, painting and installation of roof of bogie at coach maintenance in Karbi Anglong, Assam 782441. The initiative covers multiple steps from material supply to on-site welding, painting and roof installation on bogies. The estimated scope is implied by the EMD requirement of ₹30,000 and the option clause to adjust quantities by up to 25%. Bidders must ensure OEM authorization, prior railway experience, and full compliance with IRS terms. The contract emphasizes timely delivery, adherence to safety standards, and conformity to the purchaser’s delivery schedule. Unique clauses include quantity variation rights and mandatory compliance with all supplied certificates.
EMD of ₹30,000 is mandatory with bid submission
25% quantity variation rights during and after contracting
OEM authorization required; non-compliance leads to rejection
EMD submitted; payments as per IRS terms; ensure documentation
Delivery begins from last date of original delivery order; extended time rules apply
Not explicitly stated; follow IRS terms and contract standards
Must have railway/public utility project experience
Must provide OEM authorization for the offered item
Must submit all required certificates and EMD
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of material along with welding, painting and installation of roof of bogie at coach maintenan
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates showing railway or public utility experience
Financial statements (past 3 years)
EMD submission proof (receipt/DD online transaction)
Technical bid documents and OEM authorization
Bid-specific authorizations from OEM
Certificates showing compliance with IRS terms
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | DILIP TALUKDAR(MII) Under PMA | Item Categories : Supply of material along with welding, painting and installation of roof of bogie at coach maintena |
Key insights about ASSAM tender market
Bidders must ensure OEM authorization is attached to the bid, submit the ₹30,000 EMD, and provide experience proofs in railway/public utilities. Upload all required certificates per IRS terms, and be prepared for a 25% quantity variation. The on-site scope includes welding, painting and installation at coach maintenance.
Submit GST certificate, PAN, past 3-year financials, railway/public utility experience certificates, EMD receipt, OEM authorization, and all bid-specific certificates. Ensure IRS terms compliance and upload certificates with the bid to avoid rejection.
Delivery starts from the last date of the original order; if quantity increases, extension time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days; further extensions possible within contract rates.
Bidders must quote with bid-specific OEM authorization; absence leads to rejection. Ensure the OEM authorization covers the exact item scope—roof bogie welding, painting and installation—and is current at bid submission.
The EMD amount is ₹30,000. Submit the payment proof with the bid; exemptions apply only as per extant rules. Ensure the EMD is valid during bid validity and contract award.
No explicit LD clause is described in the provided terms; bidders should rely on standard IRS terms and railway procurement penalties, and factor potential delays into delivery planning and performance bonds if applicable.
Scope includes supply of materials plus on-site welding, painting and installation of bogie roof on coaches at the maintenance facility in Karbi Anglong, Assam, following IRS standards and OEM specifications.
Yes, bidders should demonstrate prior railway or public utility execution in similar scope; single-item railway contracts are preferred to avoid rejection, per ATC clauses.
South Eastern Coalfields Limited
📍 KOREA, CHHATTISGARH
Panchayati Raj Department
📍 UDAIPUR, RAJASTHAN
RDD-CEO-BHANDARA
📍 BHANDARA, MAHARASHTRA
Engineer-in-Chief - Water Resources Department
📍 DHAR, MADHYA PRADESH
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS