TenderDekho Logo
Closed GEM

Indian Army Tape & Electrical Goods Tender Kargil Jammu & Kashmir 2026 - DC Wire, Soldering Wire, Insulation Tape Procurement

Bid Publish Date

12-Aug-2026, 6:01 pm

Bid End Date

25-Aug-2026, 7:00 pm

Progress

Issue12-Aug-2026, 6:01 pm
AwardPending

Key Highlights

  • Specific brand/category requirements: Tape Double Side, DC Wire, Soldering Wire, Insulation Tape, Fevi Quick, Araldite, M Seal, PVC Jointer, Bunjo Union, Benjo Washer, Clamp, Fuel Pipe; all items fall under electrical/hardware consumables
  • Option clause enabling 25% quantity variation during procurement and currency of contract
  • Supply-only scope; no installation or commissioning services included
  • Delivery time calculations based on formula with minimum 30 days; extended delivery possible

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a supply-only contract in Kargil, Jammu & Kashmir (PIN 194102) for an assortment of electrical consumables including Tape Double Side, DC Wire, Soldering Wire, Insulation Tape, Fevi Quick, Fuel Pipe, Benjo Washer, Araldite, Clamp, M Seal, Bunjo Union, PVC Jointer. The BOQ lists 12 items with unspecified quantities and values, indicating a framework to supply multiple categories under one contract. The buyer reserves quantity variation up to 25% during both initial and extended delivery periods, with delivery time recalculation based on the option clause. This ATC-driven tender focuses on consolidated supply of diverse hardware and bonding supplies, with emphasis on timely fulfillment across the specified rugged terrain of Kargil.

Technical Specifications & Requirements

  • Scope: Supply of Goods only (no installation) per the Bid Price Schedule and ATC.
  • Item categories include: tape products, electrical wires, adhesives (Fevi Quick, Araldite), clamps, seals (M Seal), joins (PVC Jointer), connectors and miscellaneous hardware (Benjo Washer, Bunjo Union, Fuel Pipe).
  • Delivery: Provisions allow up to 25% quantity variation; delivery period adjustments follow the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a 30-day minimum, starting after the last original delivery order.
  • Eligibility: Bidders must comply with the Buyer Added ATC; scope is strictly supply of goods without services.
  • Documentation: ATC document uploaded by the Buyer governs terms; ensure bid submission aligns with these constraints.

Terms, Conditions & Eligibility

  • EMD and estimated value: Not specified in data; bidders should review ATC for exact details.
  • Quantity variation: Up to 25% increase during contract; additional time calculated per rule with minimum 30 days.
  • Payment terms: Not disclosed; submit per ATC guidance in the tender documents.
  • Delivery: Delivery window tied to original order dates; extended periods possible under option clause.
  • Documentation: Prepare standard bidder documents (GST, PAN, experience, financials) as per ATC; OEM authorizations may be required.
  • Warranties & penalties: Not specified in data; refer to ATC for any LD or warranty terms.

Key Specifications

  • Product/service names: Tape Double Side, DC Wire, Soldering Wire, Insulation Tape, Fevi Quick, Fuel Pipe, Benjo Washer, Araldite, Clamp, M Seal, Bunjo Union, PVC Jointer

  • Estimated value/EMD: Not specified; verify in ATC

  • Category: Electrical/Hardware consumables for field deployment

  • Delivery terms: 25% quantity variation allowed; delivery period adjustments with minimum 30 days

  • Quality/standards: Not specified in provided data; refer to ATC for any brand or standard requirements

Terms & Conditions

  • Option Clause allows 25% quantity variation during contract and currency of contract with recalculated delivery period

  • Supply-only scope; no installation; ATC governs bid terms and submission

  • Delivery period adjustments require calculation and minimum 30 days; extended delivery possible

Important Clauses

Payment Terms

Not specified in provided data; payment terms to be clarified in ATC

Delivery Schedule

Delivery period starts from last date of original delivery order; option clause may extend timelines with minimum 30 days

Penalties/Liquidated Damages

Not specified in provided data; refer to ATC for LD terms

Bidder Eligibility

  • Ability to supply electrical/hardware consumables to government/defense sector

  • Compliant with GST, tax, and procurement regulations

  • Demonstrated experience in supplying similar items within secure or remote locations

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Financial Results

Rank Seller Price Item
L1
Universal Traders(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Tape Double Side,DC Wire,Soldering Wire,Insulation Tape,Fevi Quick,Fuel Pipe All Type,Benjo Washer
L2
CHAWLA MACHINERY STORE (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Tape Double Side,DC Wire,Soldering Wire,Insulation Tape,Fevi Quick,Fuel Pipe All Type,Benjo Washer
L3
Moni Enterprises (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Tape Double Side,DC Wire,Soldering Wire,Insulation Tape,Fevi Quick,Fuel Pipe All Type,Benjo Washer

Tender Data

Bid Details

Quantity

212

Category

Tape Double Side

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Tape Double Side , DC Wire , Soldering Wire , Insulation Tape , Fevi Quick , Fuel Pipe All Type , Benjo Washer All Type , Araldite , Clamp all Type , M Seal , Bunjo Union All Type , PVC Jointer all Type

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Kargil

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KargilKargil--515-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9748121.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 12 Items Sign in for GEM prices

#1

Tape Double Side

Tape Double Side

5 pieces Delivery: 15 days
#2

DC Wire

DC Wire

2 roll Delivery: 15 days
#3

Soldering Wire

Soldering Wire

1 roll Delivery: 15 days
#4

Insulation Tape

Insulation Tape

2 pkt Delivery: 15 days
#5

Fevi Quick

Fevi Quick

20 pieces Delivery: 15 days
#6

Fuel Pipe All Type

Fuel Pipe All Type

30 pieces Delivery: 15 days
#7

Benjo Washer All Type

Benjo Washer All Type

6 pkt Delivery: 15 days
#8

Araldite

Araldite

60 pieces Delivery: 15 days
#9

Clamp all Type

Clamp all Type

30 pieces Delivery: 15 days
#10

M Seal

M Seal

6 pkt Delivery: 15 days
#11

Bunjo Union All Type

Bunjo Union All Type

30 pkt Delivery: 15 days
#12

PVC Jointer all Type

PVC Jointer all Type

20 pieces Delivery: 15 days

Categories 13

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply of electrical/hardware goods

4

Financial statements (audited if available)

5

Bid security/EMD submission document (as per ATC)

6

Technical bid documents demonstrating product compliance

7

OEM authorizations (if bidding as an authorized distributor)

8

Any certificates or compliance documents required by ATC

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army electrical consumables tender in Kargil?

Submit bids with all required bidder documents per ATC, including GST, PAN, and experience certificates. Ensure supply of Tape Double Side, DC Wire, Soldering Wire, Insulation Tape, Fevi Quick, Araldite, and related items. Verify 25% quantity variation rights and delivery formula with minimum 30 days extension, and follow ATC submission format.

What documents are required for tender in Kargil electrical supplies?

Prepare GST certificate, PAN card, company financials, past experience certificates, EMD submission proof, OEM authorizations (if applicable), and technical compliance documents as specified in the ATC. Ensure bids reflect supply-only scope and alignment with 25% quantity variation terms.

What are the delivery terms for the Indian Army supply contract in Jammu & Kashmir?

Delivery begins from the last date of original delivery order; option clause permits up to 25% more quantity with adjusted delivery time using the formula (Increased/Original) × Original period, minimum 30 days. Extended delivery possible under contract terms.

What items are included in the services category for this tender?

Items include Tape Double Side, DC Wire, Soldering Wire, Insulation Tape, Fevi Quick, Fuel Pipe, Benjo Washer, Araldite, Clamp, M Seal, Bunjo Union, PVC Jointer. Quantities are not disclosed in the data; refer to BOQ in ATC for item-wise details.

What is the scope of supply for this Indian Army tender?

Scope is strictly supply of goods, not installation or services. Bidders must provide all cost components in the bid price and comply with ATC-defined terms, including delivery timelines and quantity variation provisions.

What are the payment terms for this procurement in Kargil?

Payment terms are not specified in the provided data. Bidders should consult the ATC document for exact payment milestones, timing, and any advance or milestone-based payments tied to delivery of goods.

How will quantity variation affect delivery timelines in this tender?

If quantity increases by up to 25%, delivery time is recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; the purchaser may extend this duration to the original delivery period as needed.

What is the governing document for terms and conditions in this bid?

ATC (Buyer Added Terms and Conditions) governs terms and conditions. Bid submissions must strictly align with the ATC, including scope, variation rights, and any OEM authorizations required for the items listed.