TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Regimental Police Statute Electric Clothes Dryer Tender 2026

Bid Publish Date

09-Aug-2026, 10:15 am

Bid End Date

25-Aug-2026, 11:00 am

Progress

Issue09-Aug-2026, 10:15 am
AwardPending

Key Highlights

  • • Make In India certificate required
  • • Sample submission deadline: 19 Aug 2026
  • • Quantity adjustment right up to 50% during contract
  • • Delivery acceptance contingent on CRAC and user verification

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for electric clothes dryer units under the REGIMENTAL POLICE (RP) category. The procurement scope includes electric clothes dryers for Regimental Police operations, with sample submission required by 19 Aug 2026 at Near K K resort, 9 Corps Zone Wksp, c/o 56 APO, Damtal, Himachal Pradesh, PIN 906309. Bidders must provide a Make In India certificate and a conforming tender sample as part of the bid. The buyer reserves the right to adjust quantities by up to 50% of bid quantity during both initial and currency periods, at contracted rates, with delivery timing linked to the last delivery order date. This clause allows fluctuating demand within a defined framework, demanding robust supply planning from bidders.

Technical Specifications & Requirements

  • Product: electric clothes dryer for military use; sample must align with tender specifications and be delivered to the stated address by 19 Aug 2026.
  • Quality expectations: strictly good quality items; substandard or non-conforming units will be rejected.
  • Compliance: bidder must provide a Make In India certificate and ensure the sample meets the stated standards; acceptance hinges on the user’s evaluation.
  • Sample submission: required along with technical specifications and other documents; sample review will influence bid acceptance. Delivery and acceptance are contingent on CRAC and user verification.
  • Location-based note: sample delivery location specified; no BOQ items available in the current data.

Terms, Conditions & Eligibility

  • Quantity variation: up to 50% increase during contract at contracted rates; delivery period adjustments anchored to original delivery timeline with minimum 30 days.
  • Documentation: bidders must upload all requested certificates/documents; incomplete bids risk rejection.
  • Make In India: mandatory certificate submission.
  • Sample submission deadline: by 19 Aug 2026 to the given Himachal Pradesh address.
  • Evaluation: samples evaluated against technical specifications; non-conforming samples may lead to bid rejection.
  • Payment and acceptance: CRAC-based payment actions after delivery acceptance by the product user.

Key Specifications

  • Product name: electric clothes dryer

  • Sample submission by 19 Aug 2026

  • Delivery location: Himachal Pradesh, near K K resort, 9 Corps Zone Wksp, c/o 56 APO, Damtal

  • Quality mandate: good quality items; non-standard rejected

  • CRAC-based payment after delivery acceptance

Terms & Conditions

  • Quantity may be increased up to 50% during contract at contracted rates

  • Mandatory Make In India certificate and tender sample submission

  • Delivery period linked to last delivery order date with minimum 30 days

  • CRAC and user acceptance required before payment

Important Clauses

Payment Terms

CRAC-based payment after delivery acceptance by product user; no specific advance payment mentioned

Delivery Schedule

Delivery period commences from last date of original delivery order; extended time calculated by (increased quantity ÷ original quantity) × original delivery period, min 30 days

Penalties/Liquidated Damages

Not explicitly stated; acceptance-based payment implies adherence to delivery and quality standards to avoid penalties

Bidder Eligibility

  • Experience in supplying electrical appliance equipment to government or military clientele

  • Demonstrated ability to provide Make In India certified products

  • Financial and technical capacity to deliver potentially variable quantities

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

6

Category

REGIMENTAL POLICE (RP) STATUE

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

REGIMENTAL POLICE (RP) STATUE , ELECTRIC CLOATHES DRYER

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Kangra

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KangraKangra--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9730812.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 1

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply

4

Financial statements showing stability

5

EMD documents as applicable

6

Technical bid documents and compliance certificates

7

OEM authorizations (if applicable)

8

Make In India certificate

9

Tender sample along with technical specifications

Frequently Asked Questions

Key insights about HIMACHAL PRADESH tender market

How to bid for Indian Army electric clothes dryer tender Himachal 2026

Bidders must submit GST, PAN, financial statements, experience certificates, and OEM authorizations, along with a tender sample by 19 Aug 2026. Ensure Make In India certificate is included and sample conforms to technical specs; CRAC acceptance governs payment post-delivery.

What documents are required for Indian Army RP dryer tender 2026

Required documents include GST certificate, PAN, experience certificates for similar work, financial statements, EMD submission, technical compliance certificates, OEM authorizations if applicable, and the mandatory tender sample with technical specifications.

What are the delivery terms for the Indian Army dryer procurement

Delivery commences after the last date of the original delivery order; option to extend quantity up to 50% at contracted rates; minimum additional delivery time is 30 days, based on increased quantity formula.

What standards and certifications are needed for the dryer bid

Mandatory Make In India certificate; items must meet quality standards per user evaluation; no IS/ISO numbers specified beyond general quality criteria; sample must conform to technical specifications.

When is the sample submission deadline for the RP dryer tender

Samples, along with technical specifications and required documents, must be submitted by 19 Aug 2026 to Near K K resort, 9 Corps Zone Wksp, c/o 56 APO, Damtal, Himachal Pradesh.

What is the payment mechanism for the Indian Army procurement

Payment follows CRAC after delivery and user acceptance; no advance payment terms are specified; ensure delivery meets all standards to trigger payment release.

What are the key eligibility criteria for this dryer tender

Eligibility includes prior supply experience for similar electrical appliances to government/military sectors, demonstrated financial strength, GST/PAN validity, Make In India certification, and ability to provide a compliant tender sample.

How will quantity fluctuations affect the contract

Up to 50% quantity variation is permitted during and after contract at contracted rates; delivery timing adjusts proportionally with minimum 30 days added, requiring scalable production planning.

Advertisement