Bid Publish Date
28-Sep-2026, 5:02 pm
Bid End Date
19-Oct-2026, 5:00 pm
EMD
₹10,000
Value
₹7,77,030
Location
Progress
Uranium Corporation Of India Limited has released a public tender for Title1, Title2, Title3, Title4, Title5, Title6 in CUDDAPAH, ANDHRA PRADESH. Quantity: 72165. Submission Deadline: 19-10-2026 17: 00: 00. Download documents and apply online.
Quantity
72165
Category
Title1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Title1 , Title2 , Title3 , Title4 , Title5 , Title6
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
270
Delivery Locations
1
Delivery Cities
Y.S.R.
Delivery Pincodes
516349
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sarithala Siddaiah | 516349,CHIEF CONTROLLER OF PURCHASE, URANIUM CORPORATION OF INDIA LIMITED, MC PALLE (POST), VEMULA (MANDAL), YSR KADAPA DISTRICT, AP | Y.S.R. | Andhra Pradesh | 516349 | 70000 | 270 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Title1
Charges for filtration of transformer oil. Filtration must be done till the oil achieved the desired BDV value
Title2
Supply of new Transformer oil Electrol or Transol make as per IS 335 standards
Title3
Charges for BDV test. BDV test must be conducted before filtration and after filtration of transformer oil. 1 No means 1 time testing of BDV. Before achieving the BDV during filtration the contractor can test as many times as required but charges will be considered only for before filtration of transformer oil and after filtration of oil with desired BDV value i.e only 2 Nos tests for a transformer is considered.
Title4
Charges for Dissolved Gas Analysis test. For each transformer after filtration 1 No sample to be collected and test to be conducted
Title5
Charges for Moisture content PPM test. For each transformer after filtration 1 No sample to be collected and test to be conducted
Title6
Charges for Acidity test. For each transformer after filtration 1 No sample to be collected and test to be conducted
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | Charges for filtration of transformer oil. Filtration must be done till the oil achieved the desired BDV value | 70,000 | litres | tmplconsignee2 | 270 | |
| 2 | Title2 | Supply of new Transformer oil Electrol or Transol make as per IS 335 standards | 2,000 | litres | tmplconsignee2 | 270 | |
| 3 | Title3 | Charges for BDV test. BDV test must be conducted before filtration and after filtration of transformer oil. 1 No means 1 time testing of BDV. Before achieving the BDV during filtration the contractor can test as many times as required but charges will be considered only for before filtration of transformer oil and after filtration of oil with desired BDV value i.e only 2 Nos tests for a transformer is considered. | 66 | nos | tmplconsignee2 | 270 | |
| 4 | Title4 | Charges for Dissolved Gas Analysis test. For each transformer after filtration 1 No sample to be collected and test to be conducted | 33 | nos | tmplconsignee2 | 270 | |
| 5 | Title5 | Charges for Moisture content PPM test. For each transformer after filtration 1 No sample to be collected and test to be conducted | 33 | nos | tmplconsignee2 | 270 | |
| 6 | Title6 | Charges for Acidity test. For each transformer after filtration 1 No sample to be collected and test to be conducted | 33 | nos | tmplconsignee2 | 270 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer