Tender Notice for GPS Current Interrupter Timer, Kristron Make complete with GPS Antenna Tested OK Pair,Supply, Insta in PUNE, MAHARASHTRA

Bid Publish Date

08-Oct-2026, 1:13 pm

Bid End Date

19-Oct-2026, 2:00 pm

EMD

₹1,10,000

Progress

Issue08-Oct-2026, 1:13 pm
AwardPending

Hindustan Petroleum Corporation Ltd has released a public tender for GPS Current Interrupter Timer, Kristron Make complete with GPS Antenna Tested OK Pair, Supply, Insta in PUNE, MAHARASHTRA. Quantity: 6550. Submission Deadline: 19-10-2026 14: 00: 00. Download documents and apply online.

Advertisement

Tender Data

Bid Details

Quantity

6550

Category

SUPPLY and INSTALLATION of Shallow MMO Anode Bed Shallow type anode ground bed 50 Mtr X 0 3 mtr using MMO tubular anode 25mm dia X 500mm long

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

40 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

27

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400074

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pachipenta Tirumala Venkateswara Rao400074,Mumbai Pune Solapur Pipelines, HP Fuels Refinery, B.D Patil Marg, Mahul, Chembur, Mumbai- 400074Mumbai SuburbanMaharashtra4000742730-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9999865.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 84 Items Sign in for GEM prices

#1

GPS Current Interrupter Timer, Kristron Make complete with GPS Antenna Tested OK Pair

As per tender terms

2 set Delivery: 730 days
#2

Supply, Installation, Testing and Commissioning of Permanent Reference Electrode Zn ZnSO4

As per tender terms

8 nos Delivery: 730 days
#3

DC Output Voltmeter, Digital Type

As per tender terms

1 nos Delivery: 730 days
#4

Suitable Cable Glands and Accessories

As per tender terms

1 lot Delivery: 730 days
#5

Alternating current Input digit Ammeter

As per tender terms

3 nos Delivery: 730 days
#6

Fuse Holder complete with Slow Blow Glass Fuse for GPS Timer Circuit

As per tender terms

1 nos Delivery: 730 days
#7

Filter Fuse Holder complete with 10A HRC Fuse Link

As per tender terms

1 nos Delivery: 730 days
#8

PSP Meter complete with T Filter Circuitry and Associated Signal Conditioning Components OEM Certified

As per tender terms

1 nos Delivery: 730 days
#9

Output Voltage Control Potentiometer, Multi turn Type

As per tender terms

1 nos Delivery: 730 days
#10

Mother Board M B Kristron 75V 75A TR Unit

As per tender terms

1 nos Delivery: 730 days
#11

Display Board D B Kristron 75V 75A TR Unit

As per tender terms

1 nos Delivery: 730 days
#12

Complete Set of Controller Cards 04 Nos Controller Cards

As per tender terms

1 set Delivery: 730 days
#13

Output Fuse Holders Top and Base

As per tender terms

4 nos Delivery: 730 days
#14

Mains ON Indicator

As per tender terms

1 nos Delivery: 730 days
#15

104C Controller Card

As per tender terms

1 nos Delivery: 730 days
#16

Supply of material required for provision of Two Dedicated Earthing Stations HP Nagar West 1 Ohm for LA 1 and LA 2 CP Contractors Scope

As per tender terms

2 nos Delivery: 730 days
#17

supply and installation HRC Fuse Link, 10A Filter Circuit

As per tender terms

1 nos Delivery: 730 days
#18

Filter Capacitor

As per tender terms

1 nos Delivery: 730 days
#19

Supply of Cathode Header Cable Pipe Cable CP Contractors Scope 1Cx25sqmm aromured CP Cable

As per tender terms

100 mtr Delivery: 730 days
#20

Comprehensive Overhauling, Testing, Calibration, Commissioning and Certification of CP Units

Overhauling of Existing Kristron Make AC Operated CP TR Units at Brahmanwadi 75V or 75A and HP Nagar 25V or 25A , including thorough inspection as per tender

3 ls Delivery: 730 days
#21

Soil Resistivity Svy plus Anode Bed Design Soil Resistivity Survey at PCP anode ground bed Locations upto 70 mtr depth and Designing of Anode Bed

As per tender terms

1 ls Delivery: 730 days
#22

SUPPLY and INSTALLATION of Shallow MMO Anode Bed Shallow type anode ground bed 50 Mtr X 0 3 mtr using MMO tubular anode 25mm dia X 500mm long

As per tender terms

2 ls Delivery: 730 days
#23

Supply and filling of Coke breeze backfill for anode grounding electrodes

As per tender terms

4,000 kg Delivery: 730 days
#24

SUPPLY and INSTALLATION of Anode Junction Box weatherproof, IP 55

As per tender terms

2 each Delivery: 730 days
#25

SUPPLY and INSTALLATION of Cathode cum Reference Junction Box weatherproof, IP 55

As per tender terms

3 each Delivery: 730 days
#26

Supply and fitting of 1Cx 35 SQ MM Copper Armoured Cable

As per tender terms

500 mtr Delivery: 730 days
#27

Testing and Commissioning of Newly installed Anode Bed

As per tender terms

2 ls Delivery: 730 days
#28

SUPPLY and INSTALLATION OF TEST LEAD POINT IP 55 WeatherProof type TLP Numbering, circuit diagram, cable termination and Tag identification

As per tender terms

25 ls Delivery: 730 days
#29

PIPE TO CABLE CONNECTION by silver soldering

As per tender terms

40 ls Delivery: 730 days
#30

Supply and Laying 10 Sq mm Cable with termination at TLP for PSP measurement from pipeline

As per tender terms

1,000 mtr Delivery: 730 days
#31

Supply of Solid state Polarization Cell DC Decoupler

As per tender terms

5 each Delivery: 730 days
#32

Installation of Solid state Polarization Cell

As per tender terms

5 each Delivery: 730 days
#33

S,I and C of MMO Anode for Anode BED

As per tender terms

10 each Delivery: 730 days
#34

Anode earthing resistance testin Includes site testing and recording of resistance value using DET Meter

As per tender terms

15 each Delivery: 730 days
#35

TESTG OF ANODE BED IJ G Includes testing and basic assessment of anode bed condition

As per tender terms

15 each Delivery: 730 days
#36

Inspection of SSD, SSPC, IJ Inspection and reporting of associated CP protection interfacing items using SDTI Panel IJ Tester instrument

As per tender terms

25 each Delivery: 730 days
#37

Stray pipeline interferenc detailed ON OFF PSP Logging for suitable short period in compliance with applicable standards and extended monitoring

As per tender terms

10 each Delivery: 730 days
#38

S,Iand C of MMO Anode for Anode BED

As per tender terms

15 each Delivery: 180 days
#39

Supply of Zinc Anode incl 25 mm sq cable for installn

As per tender terms

7 each Delivery: 180 days
#40

Installation of Zinc Anode incl 25 mm sq cable for installn

As per tender terms

7 each Delivery: 180 days
#41

Supply of Solid state Polarization Cell

As per tender terms

18 each Delivery: 180 days
#42

Installation of Solid state Polarization Cell

As per tender terms

5 each Delivery: 180 days
#43

SUPPLY OF 1C X 25SQ MM CABLE

As per tender terms

50 mtr Delivery: 180 days
#44

Supply of Permanent reference Cell incl 25 mm sq cable for installation

As per tender terms

8 each Delivery: 180 days
#45

Installation of Permanent reference Cell incl 25 mm sq cable for installation

As per tender terms

8 each Delivery: 180 days
#46

SSD BOX M TYPE TLP

As per tender terms

20 each Delivery: 180 days
#47

SHUNT RESISTORS 500 MV5 A

As per tender terms

5 each Delivery: 180 days
#48

WIRE WOUND RESISTORS ANODE USE

As per tender terms

5 each Delivery: 180 days
#49

Display board of TRU

As per tender terms

4 each Delivery: 180 days
#50

GPS Interrupter

As per tender terms

2 each Delivery: 180 days
#51

Supply of Zinc Anode incl 25 mm sq cable for installn

As per tender terms

35 each Delivery: 180 days
#52

Installation of Zinc Anode incl 25 mm sq cable for installn

As per tender terms

35 each Delivery: 180 days
#53

Supply of Solid state Polarization Cell

As per tender terms

5 each Delivery: 180 days
#54

Installation of Solid state Polarization Cell

As per tender terms

5 each Delivery: 180 days
#55

SUPPLY OF 1C X 25SQ MM CABLE

As per tender terms

200 mtr Delivery: 180 days
#56

Supply of Permanent reference Cell incl 25 mm sq cable for installation

As per tender terms

4 each Delivery: 180 days
#57

Installation of Permanent reference Cell incl 25 mm sq cable for installation

As per tender terms

4 each Delivery: 180 days
#58

Supply of Zinc Anode incl 25 mm sq cable for installn

As per tender terms

5 each Delivery: 180 days
#59

Supply of Solid state Polarization Cell

As per tender terms

4 each Delivery: 180 days
#60

SSD BOX M TYPE TLP Supply

As per tender terms

4 each Delivery: 180 days
#61

SITC OF DC CURRENT METER

As per tender terms

4 each Delivery: 180 days
#62

GPS Interrupter

As per tender terms

2 each Delivery: 180 days
#63

REFERENCE HALF CELL ELECTRODE

As per tender terms

5 each Delivery: 180 days
#64

REED SWITCH COUPON CARD 5V

As per tender terms

4 each Delivery: 180 days
#65

DC VOLTAGE METER REF VOLTAGE

As per tender terms

4 each Delivery: 180 days
#66

SITC OF DC VOLTAGE METER

As per tender terms

4 each Delivery: 180 days
#67

WIRE WOUND RESISTORS ANODE USE

As per tender terms

15 each Delivery: 180 days
#68

REF VOLTAGE SET SWITCH

As per tender terms

4 each Delivery: 180 days
#69

O or P VOLTAGE SET SWITCH

As per tender terms

4 each Delivery: 180 days
#70

CURRENT LIMIT SET SWITCH

As per tender terms

4 each Delivery: 180 days
#71

SHUNT RESISTORS 500 MV5 A

As per tender terms

15 each Delivery: 180 days
#72

1C X 10 SQ MM CABLE COPPER

As per tender terms

50 mtr Delivery: 180 days
#73

Supply of Zinc Anode incl 25 mm sq cable for installn

As per tender terms

3 each Delivery: 180 days
#74

REFERENCE HALF CELL ELECTRODE Cu CuSO4

As per tender terms

3 each Delivery: 180 days
#75

SUPPLY OF 1C X 25SQ MM CABLE

As per tender terms

50 mtr Delivery: 180 days
#76

1C X 10 SQ MM CABLE COPPER

As per tender terms

120 mtr Delivery: 180 days
#77

Supply of Solid state Decoupler

As per tender terms

2 each Delivery: 180 days
#78

TRU Card number KS103A

As per tender terms

1 each Delivery: 180 days
#79

TRU Card number KS104C

As per tender terms

1 each Delivery: 180 days
#80

TRU Card number KS105D1

As per tender terms

1 each Delivery: 180 days
#81

TRU Card number KS106

As per tender terms

1 each Delivery: 180 days
#82

Display board of TRU

As per tender terms

1 each Delivery: 180 days
#83

Supply of Permanent reference Cell incl 25 mm sq cable for installation

As per tender terms

1 each Delivery: 180 days
#84

GPS Interrupter

As per tender terms

1 each Delivery: 180 days

Categories 119

BP INSTRUMENT VOLTAGE METERS PLATFORM SCALE UG CABLE DECIBEL METER APFC PANEL FUSES SWITCHES AND RELAY CONTROLLER CARD PARAMETER TEST TESTING INSTRUMENT POWER CABLE CABBING EQUIPMENTS ELECTRIC THRUSTER TUBE AND FITTING ARNO STARTING CONTACTOR BUS CABLE WIRING ASSEMBLY ELECTROCARDIOGRAPHY UNITS CATHODIC PROTECTION SYSTEM RADIO FREQUENCY ANALYSER LI-ION BATTERY ELECTRON GUNS JOINTING OF PIPE ION SELECTIVE ELECTRODE ISE METERS SILVER TIP WELDING BRAZING AND SOLDERING SERVICES SILVER BRAZING ZINC ANODE DISCRETE COMPONENTS ELECTRICAL WIRE XLPE CABLE LIGHTENING PROTECTION DEVICE WATTMETERS RF CABLE AMC OF ELECTRONIC ARTICULATING LAZY ARMS PRESSURE VESSEL ELECTRICAL BOXES ELECTRICAL SUBSTATION THICKNESS GAUGE DIAMONDS BED PANEL MAINTENANCE CONTRACT OF ELECTRONIC CAPACITOR CABLING CERAMIC FUSE POWER DIGITAL CORROSION TESTER PH INDICATOR BATTERY AND CELL JUMPER WIRE PNEUMATIC POSITIONER WIRELESS SET ANODE AUDIOMETERS COILED CABLE LOCAL AREA NETWORK CABLING VOLTMETER SOIL RESISTIVITY SOLAR CELLS LFH CABLE CABLE TERMINAL ELECTRODES HOOK UP WIRES PVC CABLE SHIELDED CABLE GLUCOMETER MACHINE SUPPLY CARDS RF PASSIVE COMPONENTS ELECTRON TUBE FLUXMETERS PNEUMATIC PRESSURE GAUGE WEIGH BRIDGE POWER WIRE THERMOWELLS ELECTRICAL CONDENSER TECHNICAL SERVICES SOLAR PHOTOVOLTAIC MODULE ACID ANALYZERS BOX WATER LEVEL RECORDER POWER SENSOR VOLT METER WIRE PAPERLESS RECORDER DISPLAY BOARD RESISTOR SOLAR PV PROJECT FUME HOODS BODYWEIGHT MEASURING SCALE BRONZE PIPE ELECTRONIC COMPONENTS AND SUPPLIES HYDROGEN ELECTRODE ROUTINE MAINTENANCE SOLAR PHOTOVOLTAIC SYSTEM SMART POSITIONER LFH WIRE BARE CABLE PROGRESSIVE CAVITY PUMPS VIBRATION SENSOR BACKFILLING TRANSITION METALS CABLE PYROMETERS ZINC SULPHATE FIRE BREATHING APPARATUS PH METERS NAVIGATION SYSTEM TIMER CONTROL SYSTEM CABLE SUPPLY MEDICAL DIAGNOSTIC GAMMA CAMERAS WEIGHTS ELECTROCHEMICAL MEASURING INSTRUMENTS ORP INDICATOR

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer