TenderDekho Logo
GEM

Indian Army Comprehensive maintenance automotive spares tender 2026 Department of Military Affairs, Rajasthan/India - IS 550 compliant parts

Bid Publish Date

24-Apr-2026, 1:17 pm

Bid End Date

04-May-2026, 6:00 pm

Progress

Issue24-Apr-2026, 1:17 pm
Technical05-Mar-2026, 5:03 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

14

Category

Comprehensive maintenance

Bid Type

Two Packet Bid

Key Highlights

  • Mandatory pre-bid meeting for all bidders
  • Up to 25% quantity variation at contracted rates
  • 48-hour replacement undertaking for defective items
  • Stamp-id and EFT mandate required for submission
  • Concurrency with BOQ items for automotive spares
  • Delivery terms linked to original and extended delivery periods

Categories 38

Tender Overview

The Indian Army, Department of Military Affairs, invites bids for a comprehensive maintenance package covering an automotive spare parts assortment, including gasket sets, headlight tubes, engine oil, air filters, horn and wiring, wheel bearings, oil and air filters, brake shoes, clutch and accelerator cables, indicating lamps, and carburetor assemblies. The BOQ comprises 13 items with unspecified quantities, targeting in-service vehicle maintenance. The tender emphasizes supplier responsibility for meeting BOQ item conformity, mandatory pre-bid meeting, and a 48-hour replacement undertaking for defective items. The option clause permits up to a 25% increase in order quantity at contracted rates, with delivery timelines calculated from the original order date and extended as required. Unique procurement attributes include compulsory document uploads, stamps, and authorised EFT mandates. This procurement is positioned as a military maintenance contract demanding robust supply chain readiness and rapid replacement capability.

Technical Specifications & Requirements

  • 13 BOQ items covering automotive spare parts: gasket sets, headlight tubes, engine oil, air filters, horn and wire, wheel bearings, oil filters, brake shoes front/rear, clutch cables, accelerator cables, indicating lamps, carburetor assemblies.
  • No explicit technical specs or standards published in tender data; emphasis on item-level conformity to BOQ and replacement within 48 hours for defective items.
  • Pre-bid meeting is compulsory; all submitted items must be signed with a stamp; bidders must ensure all items match BOQ.
  • Documentation must include PAN, GSTIN, cancelled cheque, EFT mandate; bid may be rejected for missing certificates.
  • Quantity option clause allows up to 25% variation; delivery period starts from last date of original delivery order; extended delivery time follows a formula with minimum 30 days.

Terms, Conditions & Eligibility

  • EMD: Not disclosed in data; ensure payment terms align with contract; documents must include EMD as per bid.
  • Bidder to provide undertaking to replace defective items within 48 hours.
  • Pre-bid meeting mandatory; seller must sign documents with stamp; vendor code creation by bidder.
  • Delivery schedule contingent on option clause; delivery time adjustments governed by formula.
  • All submissions require PAN, GSTIN, cancelled cheque, EFT mandate; certificates required as per ATC/ corrigendum.

Key Specifications

  • Product/service: automotive spare parts for comprehensive maintenance

  • Quantities: 13 items; exact quantities not specified

  • EMD: not disclosed in tender data

  • Experience: not specified

  • Standards: not specified; emphasis on BOQ conformity and 48-hour replacement

  • Delivery: calculated via option clause; minimum 30 days for additional delivery

Terms & Conditions

  • Mandatory pre-bid meeting for all bidders

  • Option to increase quantity up to 25% at contracted rates

  • Delivery period computed from last date of original delivery order

  • 40-hour to 48-hour replacement commitment for defective items

  • EMD and essential documents required (PAN, GSTIN, EFT mandate)

Important Clauses

Delivery Terms

Delivery timelines commence from the last date of original delivery order; extended delivery time follows (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Payment Terms

Payment terms are at contract rates with staged delivery; exact percentages not disclosed; EFT mandate required; certificates and stamps mandatory.

Penalties/Liquidated Damages

Not explicitly stated; replacement obligation within 48 hours implies performance risk coverage; penalties unspecified in data.

Bidder Eligibility

  • Compulsory pre-bid meeting attendance

  • Conformity to BOQ items with stamped documentation

  • Submission of PAN, GSTIN, EFT mandate and cancellation cheque

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Comprehensive maintenance , Gasket set , Headlight tube , Engine Oil , Air filter complete , Horn and wire , Wheel Bearing , Oil filter , Brake shoe front and rear , Clutch cable complete , Accelerator cable complete , Indicating lamp , Caburetor assy

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9254778.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

Comprehensive maintenance

Comprehensive maintenance and repair replacement of the following items incl complete engine tunning up with servicing and greasing washing cleaning using soap solution polishing the complete with super quality polish etc

1 each Delivery: 30 days
#2

Gasket set

Gasket set

1 nos Delivery: 30 days
#3

Headlight tube

Headlight tube

1 nos Delivery: 30 days
#4

Engine Oil

Engine Oil

1 ltr Delivery: 30 days
#5

Air filter complete

Air filter complete

1 nos Delivery: 30 days
#6

Horn and wire

Horn and wire

1 nos Delivery: 30 days
#7

Wheel Bearing

Wheel Bearing

1 nos Delivery: 30 days
#8

Oil filter

Oil filter

1 nos Delivery: 30 days
#9

Brake shoe front and rear

Brake shoe front and rear

1 job Delivery: 30 days
#10

Clutch cable complete

Clutch cable complete

1 nos Delivery: 30 days
#11

Accelerator cable complete

Accelerator cable complete

1 set Delivery: 30 days
#12

Indicating lamp

Indicating lamp

2 nos Delivery: 30 days
#13

Caburetor assy

Caburetor assy

1 nos Delivery: 30 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

Duly certified EFT Mandate

5

Pre-bid meeting attendance proof

6

Stamp-authenticated documents for BOQ conformity

7

Certificates as per Bid Document, ATC and Corrigendum

8

Experience certificates and business registration (as applicable)

Technical Results

S.No Seller Item Date Status
1
M/S HARIHARA NAYAK   Under PMA
-03-05-2026 17:03:17
2
M/S KAMAL KEE ENGINEERS WORK   Under PMA
-03-05-2026 21:42:10
3
M/S PRADIPTA KUMAR PANI   Under PMA
-30-04-2026 20:02:59

Financial Results

Rank Seller Price Item
L1
M/S PRADIPTA KUMAR PANI(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Comprehensive maintenance,Gasket set,Headlight tube,Engine Oil,Air filter complete,Horn and wire,Wh
L2
M/S HARIHARA NAYAK (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Comprehensive maintenance,Gasket set,Headlight tube,Engine Oil,Air filter complete,Horn and wire,Wh
L3
M/S KAMAL KEE ENGINEERS WORK (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Comprehensive maintenance,Gasket set,Headlight tube,Engine Oil,Air filter complete,Horn and wire,Wh

Frequently Asked Questions

Key insights about ODISHA tender market

What documents are required for the Indian Army automotive tender in 2026?

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, stamped sign-off on all documents, and certificates per ATC/Corrigendum. Also provide proof of pre-bid meeting attendance and conformity to BOQ items for all 13 listed automotive spare parts.

How does the quantity option clause affect delivery of spares?

The purchaser may increase order quantity up to 25% at contracted rates either at initial contract or during currency. Delivery time extends proportionally using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What is the replacement commitment for defective items in this tender?

Bidders must provide an undertaking to replace defective items within 48 hours of notification. This requirement applies to all 13 BOQ automotive spare parts and is a critical post-delivery accountability measure.

When is pre-bid meeting required for this Army tender?

Pre-bid meeting is compulsory for all bidders. Participation must be confirmed prior to submission, and questions raised will be addressed in the proceedings, ensuring alignment with BOQ items and stamp-signature requirements.

Are there any standards or specifications explicitly stated in the tender?

No explicit technical standards are published; emphasis is on conformity to BOQ items and the ability to supply automotive spares like gasket sets, headlight tubes, oils, filters, cables, and carburetors as per the purchase order.

What is the overall scope of items covered in the BOQ?

The BOQ covers 13 automotive spare parts including gasket sets, headlight tubes, engine oil, air filters, horn and wiring, wheel bearings, oil filters, brake shoes, clutch cables, accelerator cables, indicating lamps, and carburetor assemblies.

What are the key submission requirements to participate in this procurement?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, stamped documents, and all required certificates. Ensure BOQ conformity and complete pre-bid attendance records; ensure sign-off on all uploaded documents to avoid rejection.

What delivery timeline rules apply when quantity changes occur?

Delivery timelines adjust based on the formula and minimum 30-day extension when quantities increase. Original delivery period remains baseline; the extended period aligns with increased quantity within the 25% limit.