TenderDekho Logo
Closed GEM

Contract Bidding Open For Supply 3 TR Non Inverter Ductable AC,ITC 3 TR Non Inverter Ductable AC,S fixing Copper Piping 0.75 in AHMEDABAD, GUJARAT

Bid Publish Date

23-Aug-2025, 6:02 pm

Bid End Date

22-Sep-2025, 12:00 pm

EMD

₹10,746

Value

₹5,37,289

Generate Docs

Progress

Issue23-Aug-2025, 6:02 pm
Corrigendum15-Sep-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

391

Category

Supply 3 TR Non Inverter Ductable AC

Bid Type

Two Packet Bid

Categories 31

Bharat Sanchar Nigam Limited Portal(bsnl) invites bids for Supply 3 TR Non Inverter Ductable AC, ITC 3 TR Non Inverter Ductable AC, S fixing Copper Piping 0. 75 Inch, S fixing Copper Piping 0. 625 Inch, SL 4C 4 Sq mm Copper PVC insu cable, SL 3C 2. 5 Sq mm Copper PVC insu cable, SL 25 mm dia Heavy PVC drain pipe, Pvdg MS structure incl cutting etc, CoveringOpen space by Boards etc, Pvdg 8Way Double Door DB TPNMCBDB, Sf 5 to 32 A MCB, Sf 4 pole 63 A Isolator, Sf Blanking Plate in DB, P laying 8 SWG GI Earth wire, Pf Prefo Cable Tray 150mm W 50 mm Depth 1. 6 mm T in AHMEDABAD, GUJARAT. Quantity: 391. Submission Deadline: 22-09-2025 12: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply 3 TR Non Inverter Ductable AC , ITC 3 TR Non Inverter Ductable AC , S fixing Copper Piping 0.75 Inch , S fixing Copper Piping 0.625 Inch , SL 4C 4 Sq mm Copper PVC insu cable , SL 3C 2.5 Sq mm Copper PVC insu cable , SL 25 mm dia Heavy PVC drain pipe , Pvdg MS structure incl cutting etc , CoveringOpen space by Boards etc , Pvdg 8Way Double Door DB TPNMCBDB , Sf 5 to 32 A MCB , Sf 4 pole 63 A Isolator , Sf Blanking Plate in DB , P laying 8 SWG GI Earth wire , Pf Prefo Cable Tray 150mm W 50 mm Depth 1.6 mm T

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENTBHARAT SANCHAR NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8260554.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Supply 3 TR Non Inverter Ductable AC

ATCScheduleItem 1

4 nos Delivery: 90 days
#2

ITC 3 TR Non Inverter Ductable AC

ATCScheduleItem 2

4 nos Delivery: 90 days
#3

S fixing Copper Piping 0.75 Inch

ATCScheduleItem 3a

60 mtr Delivery: 90 days
#4

S fixing Copper Piping 0.625 Inch

ATCScheduleItem 3b

60 mtr Delivery: 90 days
#5

SL 4C 4 Sq mm Copper PVC insu cable

ATCScheduleItem 4

60 mtr Delivery: 90 days
#6

SL 3C 2.5 Sq mm Copper PVC insu cable

ATCScheduleItem 5

40 mtr Delivery: 90 days
#7

SL 25 mm dia Heavy PVC drain pipe

ATCScheduleItem 6

40 mtr Delivery: 90 days
#8

Pvdg MS structure incl cutting etc

ATCScheduleItem 7

15 kg Delivery: 90 days
#9

CoveringOpen space by Boards etc

ATCScheduleItem 8

1 job Delivery: 90 days
#10

Pvdg 8Way Double Door DB TPNMCBDB

ATCScheduleItem 9

1 nos Delivery: 90 days
#11

Sf 5 to 32 A MCB

ATCScheduleItem 10

5 nos Delivery: 90 days
#12

Sf 4 pole 63 A Isolator

ATCScheduleItem 11

1 nos Delivery: 90 days
#13

Sf Blanking Plate in DB

ATCScheduleItem 12

10 nos Delivery: 90 days
#14

P laying 8 SWG GI Earth wire

ATCScheduleItem 13

80 mtr Delivery: 90 days
#15

Pf Prefo Cable Tray 150mm W 50 mm Depth 1.6 mm T

ATCScheduleItem 14

10 mtr Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

15-Sep-2025

Extended Deadline

22-Sep-2025, 12:00 pm

Opening Date

22-Sep-2025, 12:30 pm