TenderDekho Logo
Closed GEM

Bharat Electronics Limited HANEL Sensor & CPU Equipment Tender Ghaziabad UP 2026 – NIL Specifications, OEM Warranty

Bid Publish Date

24-Jan-2026, 3:29 pm

Bid End Date

11-Feb-2026, 11:00 am

Generate Docs

Progress

Issue24-Jan-2026, 3:29 pm
Technical02-Sep-2026, 12:56 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

13

Category

HANEL-S9-05-VV Sensor Position 58-49-vv

Bid Type

Two Packet Bid

Key Highlights

  • OEM Standard warranty applicable for all listed HANEL components
  • Authorized OEM/distributor authorization required with full contact details
  • Data Sheet alignment with offered specifications to avoid rejection
  • GST compliance: invoicing in consignee GSTIN; GST portal payment screenshot
  • Option clause allows ±50% quantity variation with adjusted delivery timelines
  • Site: IG Stores, BEL Shahibabad Ghaziabad UP 201010; end-to-end installation included
  • Catalogue submission mandatory for all quoted items

Categories 5

Tender Overview

Bharat Electronics Limited (BEL), Department of Defence Production, invites bids for the supply, installation, testing and commissioning of HANEL-S9-05-VV sensors, MP120 CPU II-GSC 58-45-VV, MP12N-ETX CPU II 58-49-VV, HANEL-S8S45SVV MP12D N CPU I, and related spiral cables (Lean x9-60-6.5 and LiftX9-50-6.5) at the IG Stores, Ghaziabad, Uttar Pradesh. The scope includes end‑to‑end delivery, installation and commissioning, with the option to adjust quantities by up to 50% at contract award and during currency. The contract requires OEM warranty and supplier-catalogue submission, with GST compliance and vendor code creation. Key differentiator lies in OEM authorization and data-sheet alignment against technical parameters, ensuring BOM validation and authorized distributor participation.

Technical Specifications & Requirements

  • Scope: Supply, Installation, Testing and Commissioning of listed HANEL items and associated spiral cables at BEL Ghaziabad site.
  • Delivery Location: IG Stores, Bharat Electronics Limited, Bharat Nagar Post, Site-IV industrial area, Shahibabad Ghaziabad, UP 201010.
  • Documentation: Data Sheet matching product specs; OEM/Authorized Distributor authorization; PAN, GSTIN, cancelled cheque; EFT mandate; GST invoice upload with GST payment screenshot on GeM.
  • Warranty: OEM standard warranty; vendor to provide item catalogue; ensure invoicing in consignee GSTIN.
  • Price & GST: Bid price inclusive of all costs; GST as applicable; cost verification against data sheet.
  • ATC & Compliance: OEM data-sheet alignment; GST handling; option clause for quantity adjustments up to 50%.

Terms, Conditions & Eligibility

  • EMD/Deposit: Not disclosed in available data. Ensure GST-compliant invoicing to consignee GSTIN.
  • Delivery Timeline: Not explicitly stated; delivery begins post order with extended delivery time per option clause.
  • Payment Terms: GST reimbursement as per actuals or applicable rates; payment processed per GST portal confirmation.
  • Submission Documents: PAN, GSTIN, cancelled cheque, EFT mandate; Data Sheet; OEM authorization; OEM/catalogue.
  • Warranty: OEM standard warranty; catalogue of quoted items required.
  • Option Clause: Up to 50% quantity variation at contract or during currency with proportionate delivery time adjustments.

Key Specifications

  • Product categories: HANEL sensors and CPUs (S9-05-VV, MP120 CPU II, MP12N-ETX CPU II, S8S45SVV MP12D N CPU I) and spiral cables Lean x9-60-6.5, LiftX9-50-6.5

  • Delivery scope: Supply, Installation, Testing and Commissioning at BEL IG Stores Ghaziabad

  • Warranty: OEM standard warranty; catalogue submission required

  • Documentation: Data Sheet aligned with bid; PAN, GSTIN, cancelled cheque; EFT mandate

  • Export/authorisation: OEM authorization for distributors

Terms & Conditions

  • OEM warranty applicable; data sheet alignment mandatory

  • Quantity variation up to 50% with extended delivery time

  • GST invoicing strictly to consignee GSTIN; GST payment proof essential

Important Clauses

Payment Terms

GST reimbursement as per actuals or applicable rates; payment via GST portal with GST payment screenshot

Delivery Schedule

Delivery period subject to option clause; additional time calculated as (additional quantity / original quantity) × original delivery period, with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated in available data; standard OEM warranty and timely delivery implied

Bidder Eligibility

  • Authorized OEM/Distributor with valid authorization certificate

  • GST registered bidder with GSTIN matching invoicing requirements

  • Experience in supplying and installing BEL-specified hardware (HANEL sensors/CPUs) and related cables

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

HANEL-S9-05-VV Sensor Position 58-49-vv , MP120 CPU II- GSC 58-45-VV , MP12N-ETX CPU II 58-49-VV , HANEL- S8S45SVV MP12D N CPU I , HANEL 6.5 M Spiral cable Lean x9-60-6.5 , HANEL-X9-50 SPIRAL CABLE LEAN LIFTX9-50-6.5

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8883363.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

HANEL-S9-05-VV Sensor Position 58-49-vv

HANEL-S9-05-VV Sensor Position(58-49-vv)

4 no Delivery: 90 days
#2

MP120 CPU II-GSC 58-45-VV

MP120 CPU II-GSC (58-4-VV)

1 no Delivery: 90 days
#3

MP12N-ETX CPU II 58-49-VV

MP12N-ETX CPU II (58-49-VV)

1 no Delivery: 90 days
#4

HANEL-S8S45SVV MP12D N CPU I

HANEL-S8S45SVV MP12D/N CPU I

1 no Delivery: 90 days
#5

HANEL 6.5 M Spiral cable Lean x9-60-6.5

HANEL 6.5 M Spiral cable Lean(x9-60-6.5)

3 no Delivery: 90 days
#6

HANEL-X9-50 SPIRAL CABLE LEAN LIFTX9-50-6.5

Hanel X9 50 Spiral Cabel lean lift

3 no Delivery: 90 days

Required Documents

1

PAN card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT mandate copy certified by bank

5

Data Sheet of offered products

6

OEM authorization / Manufacturer authorization with contact details

7

Vendor code creation documents

8

Catalogue of quoted items

Corrigendum Updates

3 Updates
#1

Update

07-Feb-2026

Extended Deadline

11-Feb-2026, 11:00 am

Opening Date

11-Feb-2026, 11:30 am

#2

Update

06-Feb-2026

Extended Deadline

09-Feb-2026, 4:00 pm

Opening Date

09-Feb-2026, 4:30 pm

#3

Update

03-Feb-2026

Extended Deadline

06-Feb-2026, 4:00 pm

Opening Date

06-Feb-2026, 4:30 pm

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-09-02-2026 12:56:48

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for BEL Ghaziabad HANEL equipment tender 2026?

Bidders must submit PAN, GSTIN, cancelled cheque and EFT mandate, plus Data Sheets aligned to offered items; OEM authorization is required for distributors. Include a CAD/Catalogue, and ensure invoicing on consignee GSTIN with GST payment proof on GeM portal. The bid should cover supply, installation, testing and commissioning.

What documents are required for the Bengal BEL procurement in Ghaziabad?

Required documents include PAN card, GSTIN, cancelled cheque, EFT mandate, Data Sheet of offered products, OEM authorization, and a supplier catalogue. These must accompany the bid for vendor code creation and to verify product specifications against the data sheet.

What are the delivery terms for BEL IG Stores Ghaziabad supply?

Delivery terms are governed by the option clause allowing up to 50% quantity variation; delivery time adjusts proportionally based on the additional quantity, with a minimum extension of 30 days. Installation and commissioning are included within scope at the Ghaziabad site.

Which OEM standards and warranties apply to BEL HANEL items?

OEM standard warranty applies to all listed HANEL components; ensure the catalogu e matches quoted items and that the vendor is authorized to supply OEM software/hardware per BEL procurement rules.

What is required for GST invoicing to BEL Ghaziabad?

Invoices must be raised in the consignee’s name with the consignee GSTIN; upload scanned GST invoice and GST payment screenshot on the GeM portal to validate GST compliance.

When is GST reimbursement applicable for this BEL tender?

GST reimbursement is provided as actuals or at applicable rates, whichever is lower, subject to the quoted GST percentage; BEL will not bear separate GST charges beyond the quoted rate.

What is the scope of supply for the Ghaziabad BEL bid?

Scope includes Supply, Installation, Testing and Commissioning of HANEL sensors, MP CPU II systems, and spiral cables at IG Stores Ghaziabad, with OEM warranty and data-sheet conformity as key evaluation criteria.

How to obtain OEM authorization for BEL procurement 2026?

Distributors must furnish an Authorization form/certificate with OEM details (name, designation, address, email, phone) along with bid; ensure the OEM is clearly identified and products align to the BEL data sheet.