Bid Publish Date
10-Jan-2025, 4:22 pm
Bid End Date
24-Jan-2025, 11:00 am
EMD
₹47,567
Value
₹23,78,350
Location
Progress
RAQuantity
489
Category
Operation of Electromechanical services at Suri TE, Bolpur TE, Guskara TE, Kalna TE
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) invites bids for Comprehensive maintenance of following capacity WAC, Split AC unit, Comprehensive maintenance of AFD system, TE Suri, Comprehensive maintenance of AFD system, TE Bolpur, Comprehensive maintenance of AFD system, TE Guskara, Comprehensive maintenance of AFD system, TE Kalna, Replacement of faulty 36, 40 watt fl. Tubes, Rewinding of faulty ceiling fan, Replacement of existing faulty Compound light, Operation of Electromechanical services at Suri TE, Bolpur TE, Guskara TE, Kalna TE in BARDHAMAN, WEST BENGAL. Quantity: 489. Submission Deadline: 24-01-2025 11: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Comprehensive maintenance of following capacity WAC , Split AC unit , Comprehensive maintenance of AFD system,TE Suri , Comprehensive maintenance of AFD system, TE Bolpur , Comprehensive maintenance of AFD system, TE Guskara , Comprehensive maintenance of AFD system, TE Kalna , Replacement of faulty 36,40 watt fl. Tubes , Rewinding of faulty ceiling fan , Replacement of existing faulty Compound light , Operation of Electromechanical services at Suri TE, Bolpur TE, Guskara TE, Kalna TE
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Comprehensive maintenance of following capacity WAC , Split AC unit
Comprehensive maintenance of following capacity WAC , Split AC unit and its associated power feeding arrangement comprising of MCB, Industrial Plug and socket, interconnection lead , cord including replacement of faulty spares, charging of refrigerant, repairing , rewinding of cooling motor and blower motor, replacement of faulty compressor, cleaning of filter, cooling coil and condenser coil etc. for smooth operation of the AC units complete as reqd. a) 1.5 TR capacity Split and Window AC units (30 jobs per month) (Note 13Nos at Suri TE, 07 Nos. at Bolpur TE, 06 Nos. Guskara TE and 04 nos. at Kalna TE)
Comprehensive maintenance of AFD system,TE Suri
Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors, and repairing of other components such as main control panel, Local control panel Manual call point, Hooters etc as reqd. ( At TE Bldg, Suri TE)
Comprehensive maintenance of AFD system, TE Bolpur
Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors, and repairing of other components such as main control panel, Local control panel Manual call point, Hooters etc as reqd. ( At TE Bldg, ,Bolpur)
Comprehensive maintenance of AFD system, TE Guskara
Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors, and repairing of other components such as main control panel, Local control panel Manual call point, Hooters etc as reqd. ( At TE Bldg, ,Guskara)
Comprehensive maintenance of AFD system, TE Kalna
Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors, and repairing of other components such as main control panel, Local control panel Manual call point, Hooters etc as reqd. ( At TE Bldg, Kalna )
Replacement of faulty 36,40 watt fl. Tubes
Replacement of faulty 36,40 watt fl. Tubes with 20watt retrofit or new LED light.
Rewinding of faulty ceiling fan
Rewinding of faulty ceiling fan 1200 or 1400 mm sweep motor with good quality copper wire.
Replacement of existing faulty Compound light
Replacement of existing faulty Compound light lamps with 30 watt LED lamp.
Operation of Electromechanical services at Suri TE, Bolpur TE, Guskara TE, Kalna TE
Operation of Electromechanical services at Suri TE, Bolpur TE, Guskara TE, Kalna TE, as per specification and details of services (Inventory) etc. attached.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Comprehensive maintenance of following capacity WAC , Split AC unit | Comprehensive maintenance of following capacity WAC , Split AC unit and its associated power feeding arrangement comprising of MCB, Industrial Plug and socket, interconnection lead , cord including replacement of faulty spares, charging of refrigerant, repairing , rewinding of cooling motor and blower motor, replacement of faulty compressor, cleaning of filter, cooling coil and condenser coil etc. for smooth operation of the AC units complete as reqd. a) 1.5 TR capacity Split and Window AC units (30 jobs per month) (Note 13Nos at Suri TE, 07 Nos. at Bolpur TE, 06 Nos. Guskara TE and 04 nos. at Kalna TE) | 360 | jobs | jtoelectrical@asl | 365 | |
| 2 | Comprehensive maintenance of AFD system,TE Suri | Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors, and repairing of other components such as main control panel, Local control panel Manual call point, Hooters etc as reqd. ( At TE Bldg, Suri TE) | 12 | months | jtoelectrical@asl | 365 | |
| 3 | Comprehensive maintenance of AFD system, TE Bolpur | Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors, and repairing of other components such as main control panel, Local control panel Manual call point, Hooters etc as reqd. ( At TE Bldg, ,Bolpur) | 12 | months | jtoelectrical@asl | 365 | |
| 4 | Comprehensive maintenance of AFD system, TE Guskara | Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors, and repairing of other components such as main control panel, Local control panel Manual call point, Hooters etc as reqd. ( At TE Bldg, ,Guskara) | 12 | months | jtoelectrical@asl | 365 | |
| 5 | Comprehensive maintenance of AFD system, TE Kalna | Comprehensive maintenance of AFD system of the entire building (System of different floors) complete with replacement of faulty items as detectors, and repairing of other components such as main control panel, Local control panel Manual call point, Hooters etc as reqd. ( At TE Bldg, Kalna ) | 12 | months | jtoelectrical@asl | 365 | |
| 6 | Replacement of faulty 36,40 watt fl. Tubes | Replacement of faulty 36,40 watt fl. Tubes with 20watt retrofit or new LED light. | 51 | nos | jtoelectrical@asl | 365 | |
| 7 | Rewinding of faulty ceiling fan | Rewinding of faulty ceiling fan 1200 or 1400 mm sweep motor with good quality copper wire. | 14 | nos | jtoelectrical@asl | 365 | |
| 8 | Replacement of existing faulty Compound light | Replacement of existing faulty Compound light lamps with 30 watt LED lamp. | 4 | nos | jtoelectrical@asl | 365 | |
| 9 | Operation of Electromechanical services at Suri TE, Bolpur TE, Guskara TE, Kalna TE | Operation of Electromechanical services at Suri TE, Bolpur TE, Guskara TE, Kalna TE, as per specification and details of services (Inventory) etc. attached. | 12 | months | jtoelectrical@asl | 365 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
02-Mar-2025, 2:00 pm
End
03-Mar-2025, 2:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ASHOKA ELECTRIC CO Under PMA | - | 17-01-2025 18:33:15 | |
| 2 | POLYNOVA EQUIP-MENTS CO Under PMA | - | 20-01-2025 15:25:35 | |
| 3 | SHARMA INDUSTRIES Under PMA | - | 23-01-2025 14:38:54 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | ASHOKA ELECTRIC CO(MSE,MII) Under PMA Winner | ₹14,76,653 | Item Categories : Comprehensive maintenance of following capacity WAC , Split AC unit,Comprehensive maintenance of AF |
| L2 | POLYNOVA EQUIP-MENTS CO (MII) Under PMA | ₹15,22,471 | Item Categories : Comprehensive maintenance of following capacity WAC , Split AC unit,Comprehensive maintenance of AF |
| L3 | SHARMA INDUSTRIES (MSE,MII) Under PMA | ₹19,60,944 | Item Categories : Comprehensive maintenance of following capacity WAC , Split AC unit,Comprehensive maintenance of AF |
🎉 L1 Winner
ASHOKA ELECTRIC CO(MSE,MII) Under PMA
Final Price: ₹14,76,653
Key insights about WEST BENGAL tender market
The eligibility requirements include being a registered entity with relevant maintenance experience, submitting past performance documentation, and adherence to turnover criteria. Bidders must also provide all necessary certificates and any additional documentation as outlined in the ATC to support their eligibility.
Required certificates for tender submission include evidence of previous experience in maintenance services, certificates that meet quality and compliance standards, and any additional documents specified in the ATC. It is vital for bidders to ensure all documentation aligns with the compliance requirements set forth in the tender.
Registration for participating in this tender is conducted online through the official tender portal where suppliers must create an account and provide necessary details. In addition, bidders must comply with specified qualification requirements to ensure successful registration.
The tender documents should be submitted in PDF or other formats specified in the tender documentation. It is critical to adhere to the accepted document formats to ensure smooth processing and evaluation of submitted proposals.
Proposals must reflect adherence to the technical specifications outlined in the tender documents. This includes compliance with standards related to the specific systems being maintained, such as WAC and split AC units, and AFD systems.
The applicable quality standards within the scope of this tender include adherence to established maintenance protocols and industry best practices for servicing and operating telecommunication systems. Bidders must ensure their proposals meet these standards.
Successful bidders are generally required to provide performance security in the form of a bank guarantee or other specified instruments after the award of the contract. This security ensures compliance with service delivery commitments throughout the contract duration.
The Earnest Money Deposit (EMD) for this tender is pegged at 47,567. This amount must be submitted along with the bid to demonstrate the bidder's commitment to participating seriously in the procurement process.
Payment terms are defined based on completed milestones and approved service reports submitted by the contractor. Specific terms can be found in the tender documents and are subject to negotiation based on service delivery standards.
Price evaluation is conducted through a total value evaluation method, assessing the complete cost of proposals submitted while factoring in the quality of service offered, compliance with technical specifications, and adherence to the stipulated requirements.
Documents can be submitted electronically via the designated tender portal. It is advised to upload all necessary documents in one submission to ensure cohesive evaluation.
While specific dates are not provided in the tender description, bidders should regularly check the official tender portal for updates regarding submission deadlines and other key timelines.
The evaluation and selection processes are structured around compliance with eligibility requirements, technical specifications, and a total value evaluation method focusing on cost-effectiveness. Shortlisted bidders may be engaged for further clarifications or interviews.
Bidders will be notified of the results through official communication from the Department of Telecommunications, which will include details of the evaluation outcomes and any further actions required.
Yes, the tender incorporates incentives for Micro, Small, and Medium Enterprises (MSEs). This may include exemptions from certain criteria, support for capacity building, and aspects that promote their active participation in the procurement process.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS