Iocl- Panipat Refinery
PANIPAT, HARYANA
Progress
Quantity
75
Category
Item no. 10 SAP Code 6675805443
Bid Type
Two Packet Bid
The IOCL Panipat Refinery in Haryana seeks procurement across 20 SAP-coded items (Item nos. 10 to 200 with codes 6675805443 to 6675801831). The scope appears to cover a broad catalog under a single tender and includes an option clause allowing a ±25% quantity variation at contracted rates. The BOQ stage lists 20 items but provides no item-wise quantities, units, or values, suggesting a framework purchase with staged release. The tender emphasizes delivery flexibility tied to the original delivery schedule and notes an ATC clause uploaded by the buyer. This setup signals a need for adaptable suppliers with strong contract compliance.
25% quantity variation permitted at time of contract placement and during currency
Delivery period adjustments based on extra quantity; minimum 30 days
Must review and comply with Buyer Added ATC and accompanying terms
Not disclosed in the provided data; verify in ATC and main tender documents
Delivery may be extended under option clause with calculation formula and minimum 30 days
Not specified in data; confirm in ATC for terms on LDs or penalties
Review of ATC document and compliance with all buyer terms
Capability to supply across multiple SAP-coded items under a single contract
Financial viability evidenced by statutory filings and turnover (where applicable)
Iocl- Panipat Refinery
PANIPAT, HARYANA
Iocl- Panipat Refinery
PANIPAT, HARYANA
Iocl- Panipat Refinery
PANIPAT, HARYANA
Iocl- Panipat Refinery
PANIPAT, HARYANA
Iocl- Panipat Refinery
PANIPAT, HARYANA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Item no. 10 SAP Code 6675805443 | As Per RFQ item no 10 | 10 | ea | malikvk | 60 |
| 2 | Item no. 20 SAP Code 6675806613 | As Per RFQ item no 20 | 4 | ea | malikvk | 60 |
| 3 | Item no. 30 SAP Code 6675805493 | As Per RFQ item no 30 | 6 | ea | malikvk | 60 |
| 4 | Item no. 40 SAP Code 6675805173 | As Per RFQ item no 40 | 6 | ea | malikvk | 60 |
| 5 | Item no. 50 SAP Code 6675807801 | As Per RFQ item no 50 | 3 | ea | malikvk | 60 |
| 6 | Item no. 60 SAP Code 6675805543 | As Per RFQ item no 60 | 8 | ea | malikvk | 60 |
| 7 | Item no. 70 SAP Code 6675805483 | As Per RFQ item no 70 | 1 | ea | malikvk | 60 |
| 8 | Item no. 80 SAP Code 6675805463 | As Per RFQ item no 80 | 10 | ea | malikvk | 60 |
| 9 | Item no. 90 SAP Code 6675805921 | As Per RFQ item no 90 | 4 | ea | malikvk | 60 |
| 10 | Item no. 100 SAP Code 6675805121 | As Per RFQ item no 100 | 1 | ea | malikvk | 60 |
| 11 | Item no. 110 SAP Code 6675805131 | As Per RFQ item no 110 | 1 | ea | malikvk | 60 |
| 12 | Item no. 120 SAP Code 6675807501 | As Per RFQ item no 120 | 1 | ea | malikvk | 60 |
| 13 | Item no. 130 SAP Code 6675805411 | As Per RFQ item no 130 | 1 | ea | malikvk | 60 |
| 14 | Item no. 140 SAP Code 6675805421 | As Per RFQ item no 140 | 1 | ea | malikvk | 60 |
| 15 | Item no. 150 SAP Code 6675800311 | As Per RFQ item no 150 | 1 | ea | malikvk | 60 |
| 16 | Item no. 160 SAP Code 6675807831 | As Per RFQ item no 160 | 3 | ea | malikvk | 60 |
| 17 | Item no. 170 SAP Code 6675807821 | As Per RFQ item no 170 | 4 | ea | malikvk | 60 |
| 18 | Item no. 180 SAP Code 6675805763 | As Per RFQ item no 180 | 1 | ea | malikvk | 60 |
| 19 | Item no. 190 SAP Code 6675805473 | As Per RFQ item no 190 | 1 | ea | malikvk | 60 |
| 20 | Item no. 200 SAP Code 6675801831 | As Per RFQ item no 200 | 8 | ea | malikvk | 60 |
Discover companies most likely to bid on this tender
- GST registration certificate
- PAN card
- Experience certificates (relevant to refining or multi-item procurement)
- Financial statements or turnover evidence
- EMD submission documentation (amount not disclosed here)
- Technical bid submission documents (as per ATC)
- OEM authorizations or supplier approvals (if required by ATC)
Extended Deadline
16-Jan-2026, 3:00 pm
Opening Date
16-Jan-2026, 3:30 pm
Extended Deadline
08-Jan-2026, 3:00 pm
Opening Date
08-Jan-2026, 3:30 pm
Key insights about HARYANA tender market
Bidders should review the ATC document, confirm item-wise quantities in the BOQ, prepare GST, PAN, and financial statements, and ensure capability to supply 20 SAP-coded items. The tender allows a 25% quantity variation and extended delivery as per the option clause; ensure compliance with delivery timelines and contract terms.
Submit GST registration, PAN card, experience certificates, financial statements, EMD proof, technical bid documents, and OEM authorizations as specified in the ATC. Ensure bids align with multi-item procurement requirements and include delivery capability details for 20 SAP-coded items.
Delivery starts after the original delivery order; if quantity changes by up to 25%, calculate extended time as (Additional quantity ÷ Original quantity) × Original period, with a minimum extension of 30 days. The purchaser may extend timelines during currency of contract.
Eligibility hinges on reviewed ATC terms, ability to supply across 20 SAP-coded items, and compliance with standard procurement practices. Bidders should provide OEM authorizations if required and demonstrate financial stability through statements and turnover evidence.
The option clause permits a 25% increase or decrease in quantity at contracted rates at contract placement or during the contract currency. Delivery time adjusts based on the calculation formula, with a guaranteed minimum extension of 30 days.
Bidders must click the ATC document link provided by IOCL in the tender portal to obtain item-level specifications, terms, and any additional submission requirements. This ensures alignment with the exact 20 SAP-coded items.
Current data does not specify standards; bidders should verify in ATC. Expect to confirm item compatibility with internal IOCL standards, and provide any required OEM certifications or compliance declarations after reviewing the ATC file.
The base delivery deadline is defined in the original delivery order; any extension requires the option clause calculation. Minimum extended period is 30 days; verify exact dates in the ATC and purchase order terms.