TenderDekho Logo
Closed GEM

Indian Army Curtains, Bedsheets & Linen Tender 2026 in India – ISI/ISO Compliant Supplies & ATC 25% Quantity Flexibility

Bid Publish Date

17-Aug-2026, 12:14 pm

Bid End Date

28-Aug-2026, 9:00 am

Progress

Issue17-Aug-2026, 12:14 pm
AwardPending

Tender Overview

The Indian Army, Department of Military Affairs, seeks supply of essential bedding and lodging items including curtains, double bed sheets, pillows with covers, blankets, slippers, water bottles, hot case tiffin 06 boxes, wipers, toilet brushes and induction items. The Bill of Quantities shows 10 items with unspecified quantities and an estimated contract value not disclosed. The Buyer Terms impose a flexible quantity option of up to 25% increase at contract rates and a disputed delivery timeline linked to the last delivery order. The procurement emphasizes end-user compatibility, sample inspection, and GSTIN/PAN documentation. This tender targets suppliers able to meet field-level military standards and robust post-award compliance, with pre-bid sample verification.

Technical Specifications & Requirements

  • Product categories include: curtains, bedsheets (double bed), pillows with cover, blankets, slippers, water bottles, hot case tiffin 06 box, wiper, toilet brush, induction items.
  • No explicit item-level specifications or dimensions are published. The clause requires technical literature, end-user validation, and a working sample for quality checks prior to bid submission.
  • Bidder must provide end-user documentation, and ensure invoice ownership to consignee GSTIN. The buyer reserves right to verify specifications against bidder claims and to cancel bids with no clarification.
  • Additional ATC clauses demand non-blacklisted bidders and mandatory PAN/GST registrations, with supplier’s responsibility to supply per end-user requirements.

Terms, Conditions & Eligibility

  • Quantity variation: up to 25% increase during contract or currency, with delivery period recalculated per item.
  • Documentation: PAN card and GSTN registration certificate required; bidders must upload technical literature and a buyer-issued pre-bid certificate.
  • Quality/Inspection: working samples must be inspected by the buyer; certificate issued prior to submission.
  • Invoicing: GST-compliant invoice to be raised in the consignee’s name with GSTIN; upload GST invoice and GST portal screenshot on GeM.
  • Other: Bid cancellation rights retained by Board of Officers; end-user requirement adherence is mandatory.

Key Specifications

  • Product categories: curtains, double bed sheets, pillows with cover, blankets, slippers, water bottles, hot case tiffin 06 box, wiper, toilet brush, induction

  • Quantity/arrangement: 10 total items; exact quantities not disclosed

  • EMD/Estimated value: not specified

  • Standards/Compliance: not specified in data; must align with end-user validation and GST/PAN compliance

  • Delivery/Installation: delivery period tied to last delivery order with option to extend per 25% quantity variance

  • Quality/Testing: pre-bid sample inspection; performance verification by buyer

Terms & Conditions

  • Quantity increase up to 25% at contracted rates

  • Pre-bid sample inspection and buyer verification of specifications

  • GSTIN and PAN mandatory; bidder to upload technical literature

Important Clauses

Payment Terms

Invoices must be raised in the consignee name with GSTIN; GST invoice scanned copy and GST portal screenshot to be uploaded on GeM

Delivery Schedule

Delivery period linked to last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Board of Officers reserve right to cancel bid at any stage without clarification; no explicit LD percentage disclosed

Bidder Eligibility

  • Not blacklisted by any government entity

  • PAN card and GSTN registration confirmed

  • Technical literature for all quoted items available

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

112

Category

Curtain

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Curtain , Bedsheet Double Bed , Pillow with cover , Blanket , Slipper , Water Bottle , Hot Case Tiffin 06 Box , Wiper , Toilet Brush , Induction

Pre-Bid & Qualification

Pre-Bid Date

20-08-2026 12:00:00

Pre-Bid Venue

Unit Location 8 (I) fd Coy Pithoragarh

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Pithoragarh

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PithoragarhPithoragarh--4015-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9763945.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

Curtain

NaN

40 nos Delivery: 15 days
#2

Bedsheet Double Bed

NaN

8 nos Delivery: 15 days
#3

Pillow with cover

NaN

16 nos Delivery: 15 days
#4

Blanket

NaN

8 nos Delivery: 15 days
#5

Slipper

NaN

8 pair Delivery: 15 days
#6

Water Bottle

NaN

8 nos Delivery: 15 days
#7

Hot Case Tiffin 06 Box

NaN

4 nos Delivery: 15 days
#8

Wiper

NaN

8 nos Delivery: 15 days
#9

Toilet Brush

NaN

8 nos Delivery: 15 days
#10

Induction

NaN

4 nos Delivery: 15 days

Categories 5

Required Documents

1

PAN card

2

GSTN registration certificate

3

Technical literature of items quoted

4

Certificate issued by buyer for pre-bid sample inspection

5

Working sample for quality inspection (to be provided at site)

6

GST invoice scanned copy and GST portal screenshot

7

End-user requirement compliance documentation

8

Proof of no blacklisting by government

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for Indian Army bedding supplies tender 2026?

Bidders must submit PAN and GSTN, provide technical literature for each item, and upload a pre-bid inspection certificate. Pre-bid samples should be available for buyer verification, and invoices must be GST-compliant in the consignee's name. The offer may be adjusted by up to 25% for quantity.

What documents are required for Army curtains and linen tender 2026?

Required documents include PAN, GSTN registration, technical literature, pre-bid inspection certificate, working sample for quality check, GST invoice copy with portal screenshot, and evidence of not being blacklisted by government authorities.

What are the delivery terms for Army induction items procurement 2026?

Delivery is tied to the last delivery order date; extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Final delivery must align with end-user requirements and contract rates.

What end-user compliance is required for bedding items tender in India?

Bidders must ensure items meet end-user requirements, with buyer validation of specifications and performance per samples. Certificates from the buyer are uploaded prior to submission; quality is verified on each unit post-award.

How is payment handled for Army linen supply contracts 2026?

Invoices must be raised in the consignee’s name with GSTIN; bidders must upload GST invoice and GST portal confirmation. Specific payment terms beyond GST compliance are not disclosed in available data.

What is the scope of quantity variation in Army procurement 2026?

The purchaser may increase or decrease quantity by up to 25% of bid/contracted quantity at any time, with extension of delivery period calculated accordingly; this applies during the currency of the contract.

Are there any brand or standard requirements for Army bedding items?

No explicit ISI/ISO or brand mandates are published in the data; however, end-user verification and accuracy of specifications are required, along with buyer-supplied pre-bid documentation and post-award sample checks.

What is the inspection process before bid submission for Army items?

Bidder must visit the organization with a working sample for quality inspection; certificate from the buyer must be uploaded before submitting the bid, ensuring sample conformity to end-user demands.